Method for reinforcing reserved side slope by embedding anchoring bodies in dumping site in strip mine

By reinforcing the anchor body in the open-pit mine, the problems of secondary peeling and slope dressing in the lower section of the open-pit mine are solved, the slope angle and mining efficiency are improved, and the costs are reduced.

CN118997192APending Publication Date: 2024-11-22SHAANXI COAL & ROCK ENG TECH CO LTD +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411403019.0
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-10-09
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

Open-pit mines need to perform secondary peeling and slope finishing when mining in the lower section. The existing technology is difficult to effectively increase the slope angle, resulting in large secondary peeling, which affects mining efficiency and safety.

Method used

The anchor is reinforced in the soil discharge site in the open-pit mine. The anchor end of the anchor is away from the lower section, the tensioning end is close to the lower section, and the anchor soil is anchored to reduce the secondary peeling amount and passes through the anchor network and dot shape Reinforcement enhances the anchoring effect of soil.

Benefits of technology

The slope angle is increased, the secondary peeling amount is reduced, the mining cost is reduced, the construction process is simplified, and the mining can be completed without secondary peeling under certain conditions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118997192A_ABST
    Figure CN118997192A_ABST
Patent Text Reader

Abstract

The invention discloses a method for reinforcing a reserved side slope by pre-embedded anchoring bodies in a dumping site in a strip mine, which comprises the following steps: during dumping, when a lower section dumping slope surface of each dumping step reaches a preset slope surface line, placing the anchoring bodies on a goaf dumping slope surface of each dumping step; the anchoring end of the anchoring body is far away from the lower section, and the tensioning fastening end is arranged close to the lower section, so that the anchoring body anchors soil, close to the soil discharging slope surface of the lower section, of each soil discharging step, and the soil is prevented from interfering with mining of a coal seam of the lower section; according to the method, the anchoring body is pre-buried in the dumping process, so that the anchoring body anchors soil, close to the dumping slope surface of the lower section, of each dumping step, and the situation that the soil interferes with mining of a coal seam of the lower section is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of open-pit mining, and in particular relates to a method for reinforcing a reserved slope by pre-embedded anchor bodies in a spoil dump in an open-pit mine. Background Art

[0002] The loose soil and rock stripped by open-pit mining is backfilled into the inner spoil dump in the goaf. This is not only environmentally friendly and green mining, but also reduces production costs. However, near-horizontal open-pit coal mines mostly adopt zoning mining, and the lower section mining requires secondary stripping of the inner spoil dump near the mining area. Regarding how to reduce secondary stripping between adjacent mining areas or between mining areas in open-pit mines, there are two mining solutions in the existing technology: leaving trenches between mining areas and modifying the spoil body.

[0003] Leaving trenches between mining areas to reduce secondary stripping requires a large amount of space to be reserved between mining areas, which is not conducive to efficient mining production. Therefore, it is often difficult to leave trenches in the entire area, and only some secondary stripping can be reduced. Secondary stripping and slope finishing are still required for mining in the lower section.

[0004] The modification of the soil body is to consider modifying the soil body during the soil discharge process. Modification of the soil body will inevitably change the slope excavation angle. One of the ways to modify the soil body is to discharge the soil body in layers and perform engineering rolling. Although it is effective, it does not meet the on-site construction process and is not technically and economically feasible. Another way to modify the soil body is to grout the soil body for reinforcement. This method can meet the production requirements relative to the rolling construction process; but the grouting is difficult to control and the distribution in the soil body is uneven, and the effect is far from the modification efficiency compared with rolling. Therefore, grouting reinforcement is not only very costly, but also has poor cost-effectiveness, so it can only be used as an auxiliary means for local reinforcement. In addition, the geogrid reinforcement method is also used to change the performance of the soil body. This method is to divide the soil discharge project into several layers and lay grids on each layer. This method requires the soil discharge process to divide a step into several levels, which is difficult to achieve and apply in the production process.

[0005] Therefore, whether leaving a ditch or increasing the mechanical properties of the soil dump, it is necessary to increase the slope angle of the soil dump. Therefore, seeking new technologies to increase the slope angle and reduce the amount of secondary stripping is an important factor in achieving safe and efficient open-pit mining. Summary of the invention

[0006] The purpose of the present invention is to provide a method for pre-embedded anchor bodies in the spoil dump of an open-pit mine to reinforce the reserved slope, so as to solve the influence of the spoil dump in the goaf on the mining of the lower section, thereby increasing the slope angle, reducing the secondary stripping amount, and improving the efficiency of open-pit mining.

[0007] The present invention adopts the following technical scheme: a method for pre-embedded anchor bodies in the spoil dump of an open-pit mine to reinforce the reserved slope.

[0008] When the soil discharge slope of the lower section of each soil discharge step reaches the predetermined slope line during soil discharge, an anchor body is placed on the soil discharge slope of the goaf area of ​​each soil discharge step, so that the anchoring end of the anchor body is away from the lower section and the tensioning and tightening end is arranged close to the lower section, thereby allowing the anchor body to anchor the soil of each soil discharge step close to the soil discharge slope of the lower section.

[0009] Furthermore, during open-pit mining, the coalfield is divided into multiple adjacent mining areas for mining, and the stripped rock and soil generated during the excavation of each mining area is discharged into the goaf area; and is continuously accumulated in the goaf area to form multiple layers of soil discharge steps; the side of each soil discharge step facing the goaf is the goaf soil discharge slope surface, and the side facing the lower section is the lower section soil discharge slope surface; the width and length of each soil discharge step decreases layer by layer from bottom to top;

[0010] The soil discharge transport tool travels on the flat plate of each soil discharge step and dumps the soil on the soil discharge slope of each soil discharge step, so that the soil continues to expand toward the mining area along the soil discharge slope of the goaf area of ​​the soil discharge step and accumulates along the soil discharge slope of the goaf area and continues to move forward along the horizontal plane.

[0011] Furthermore, after the anchor body is arranged, the tray is first installed at the tensioning and tightening end of the anchor body and then the lock is fixed.

[0012] Further, after the anchor body is laid out, a lock is installed at the tensioning and tightening end of the anchor body;

[0013] When discharging soil, the soil is continuously accumulated along the discharging slope of the lower section until it touches and is flush with the coal seam of the lower section;

[0014] When mining the lower section, the soil between the plane where the tensioned and fastened ends of each anchor body are located and the lower section is stripped, and after the stripping, the slope surface of each discharge step close to the lower section is a secondary stripping slope surface.

[0015] Furthermore, the locks of each anchor body are removed; then a protective net is first laid on the secondary stripping slope, and then horizontal protective rods and vertical protective rods are placed on the upper side of the protective net, so that the intersection of the horizontal protective rods and the vertical protective rods is the tensioning and fastening end of the anchor body, and then the tray and the locks are installed in sequence on the tensioning and fastening end of the anchor body, so that the tray fixes the horizontal protective rods, the vertical protective rods and the protective net, and avoids soil interference with the lower section of coal mining near the secondary stripping slope in each soil discharge step.

[0016] Furthermore, a plurality of anchor bodies are placed on the soil discharge slope surface of the goaf area of ​​each soil discharge step and are arranged at intervals; and a plurality of anchor bodies are placed along the horizontal direction of each soil discharge step and are arranged at intervals.

[0017] Furthermore, each anchoring body comprises: a rod body, an anchoring reinforcement body is fixedly connected to the anchoring end of the rod body, a plurality of point reinforcement bodies are arranged on the rod body at intervals along the direction of the rod body, and the anchoring reinforcement body and the point reinforcement bodies are concrete blocks, steel plates or steel bars.

[0018] Furthermore, after all anchor bodies on the same goaf drainage slope are placed, drainage pipes are placed at intervals on the goaf drainage slope, and each drainage pipe is arranged crosswise with the anchor bodies.

[0019] Furthermore, an anchor rope is tied to the anchor end of each anchor body, and each anchor rope ties up each anchor body located on the same goaf dump slope from bottom to top, and extends upward to the flat plate of the dump step and is fixed on the fixed pile.

[0020] Furthermore, each anchor rope binds and fixes each anchor body and the corresponding drainage pipe from bottom to top, and fixes the anchor rope on the flat plate of the soil discharge step by using fixed piles.

[0021] The beneficial effects of the present invention are:

[0022] The present invention preburies anchor bodies during the soil discharge process, so that the anchor bodies anchor the soil of each soil discharge step close to the soil discharge slope surface of the lower section, thereby preventing the soil from interfering with the mining of the coal seam in the lower section;

[0023] The invention is simple to construct and low in cost. When mining in the lower section, it is not necessary to drill holes to install anchor bodies, which greatly increases the slope angle of the secondary stripping surface, and can greatly reduce the cost of secondary stripping. In areas with good working conditions, mining can be completed without stripping, and a slope surface can be reserved near the lower section.

[0024] The anchor bodies of the present invention are interconnected, so that the anchor bodies form an anchoring network, thereby anchoring the soil near the lower section of the soil discharge slope of each soil discharge step, thereby increasing the anchoring effect on the soil;

[0025] The anchoring body of the present invention is provided with a plurality of point-shaped reinforcement bodies arranged at intervals, and an anchor reinforcement body is fixedly connected to the anchoring end, which strengthens the anchoring effect to a certain extent;

[0026] If the rod body of the anchor body of the present invention is set as a hollow structure, it can not only improve the anchoring resistance, but also improve the intrinsic physical and mechanical parameters of the loose medium, which is more conducive to improving the slope angle and reducing engineering costs. BRIEF DESCRIPTION OF THE DRAWINGS

[0027] Figure 1 This is a schematic diagram of mining before secondary stripping of the present invention;

[0028] Figure 2 A cross-sectional view after reinforcement of the present invention;

[0029] Figure 3 Another cross-sectional view after reinforcement of the present invention;

[0030] Figure 4 This is a schematic diagram of the effect of the present invention requiring secondary peeling;

[0031] Figure 5 This is a schematic diagram of the effect of the present invention without the need for secondary peeling;

[0032] Figure 6 It is a front view of the secondary peeling slope of the present invention;

[0033] Figure 7 This is a schematic diagram of mining after secondary stripping according to the present invention.

[0034] Among them: 10. Anchor body; 11. Lock; 12. Pallet; 13. Protection net; 14. Horizontal protection rod; 15. Vertical protection rod; 16. Drain pipe; 17. Anchor rope; 18. Goaf; 19. Goaf drainage slope; 20. Lower section drainage slope; 21. Flat plate; 22. Drainage step; 23. Secondary stripping slope; 24. Lower section. DETAILED DESCRIPTION

[0035] The present invention is described in detail below with reference to the accompanying drawings and specific embodiments.

[0036] In the description of the present invention, it should be understood that the terms "center", "longitudinal", "lateral", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside" and the like indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore cannot be understood as limiting the present invention. In addition, the terms "first" and "second" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance or implicitly indicating the number of technical features indicated. Thus, features defined as "first" and "second" may explicitly or implicitly include one or more of the features. In the description of the present invention, unless otherwise specified, "multiple" means two or more. The "direction" in the present invention is based on the position of the present invention in a certain direction. Figure 1 Description of the trend in the state.

[0037] The invention discloses a method for reinforcing a reserved slope by pre-embedded anchor bodies in a spoil dump in an open-pit mine. Figure 1 , Figure 2 , Figure 3As shown, during open-pit mining, the coalfield is divided into multiple adjacent mining areas for mining, and the stripped rock and soil generated during the excavation of each mining area is discharged into the goaf 18; and is continuously accumulated in the goaf 18 to form multiple layers of soil discharge steps 22; each soil discharge step 22 has a side facing the goaf 18 as the goaf soil discharge slope 19, and a side facing the lower section 24 as the lower section soil discharge slope 20; the width and length of each soil discharge step 22 decreases layer by layer from bottom to top.

[0038] The lower section 24 refers to an area adjacent to the area being mined.

[0039] The soil discharge transport tool travels on the flat plate 21 of each soil discharge step 22 and dumps the soil on the soil discharge slope of each soil discharge step 22, so that the soil continues to expand toward the mining area along the soil discharge slope 19 of the goaf of the soil discharge step 22 and accumulates along the soil discharge slope 19 of the goaf and continues to move forward along the horizontal plane.

[0040] When the discharge slope 20 of the lower section of each discharge step 22 reaches the predetermined slope line during discharge, an anchor body 10 is placed on the discharge slope 19 of the goaf of each discharge step 22, so that the anchoring end of the anchor body 10 is away from the lower section 24 and the tensioning and tightening end is arranged close to the lower section 24, thereby enabling the anchor body 10 to anchor the soil of each discharge step 22 close to the discharge slope 20 of the lower section, thereby preventing the soil from interfering with the mining of the coal seam in the lower section 24.

[0041] like Figure 5 As shown, if the working conditions are good, the tray 12 can be installed first at the tensioning and fastening end of the anchor body 10 after the anchor body 10 is arranged, and then the lock 11 can be fixed. In this case, there is no need for secondary stripping, which will greatly reduce the cost of secondary stripping.

[0042] like Figure 4 As shown, if the working conditions do not meet the requirements, then after the anchor body 10 is discharged, the lock 11 is installed on the tensioned and fastened end of the anchor body 10, and then the soil discharge continues. When discharging the soil, the soil continues to accumulate along the lower section soil discharge slope 20 until it touches and is flush with the coal seam of the lower section 24; when the lower section 24 is mined, the soil between the plane where the tensioned and fastened ends of each anchor body 10 are located and the lower section 24 is stripped, and after stripping, the slope surface of each soil discharge step 22 close to the lower section 24 is the secondary stripping slope 23.

[0043] like Figure 6As shown, the locks 11 of each anchor body 10 are removed, and the protection net 13 is first laid on the secondary stripping slope 23, and then the horizontal protection rod 14 and the vertical protection rod 15 are placed on the upper side of the protection net 13, so that the intersection of the horizontal protection rod 14 and the vertical protection rod 15 is the tensioning and fastening end of the anchor body 10, and then the tray 12 and the lock 11 are installed in sequence on the tensioning and fastening end of the anchor body 10, so that the tray 12 fixes the horizontal protection rod 14 and the vertical protection rod 15 and the protection net 13, and prevents the soil near the secondary stripping slope 23 in each soil discharge step 22 from interfering with the coal mining in the lower section 24. At this time, there is no need to reinforce the secondary stripping slope 23 again, and only the tray 12 and the lock 11 need to be installed on the tensioning and fastening end of the anchor body 10.

[0044] A plurality of anchor bodies 10 are placed on the goaf discharge slope 19 of each discharge step 22 and are arranged at intervals; a plurality of anchor bodies 10 are placed in the horizontal direction of each discharge step 22 and are arranged at intervals, that is, a plurality of anchor bodies 10 are arranged in both the vertical direction and the horizontal direction.

[0045] Each anchor body 10 includes: a rod body, the two ends of the rod body are respectively an anchoring end and a tensioning and tightening end, the anchoring end of the rod body is fixedly connected to an anchor reinforcement body, and a plurality of point reinforcement bodies are arranged on the rod body at intervals along the direction of the rod body, and the anchor reinforcement body and the point reinforcement bodies are both concrete blocks, steel plates or steel bars.

[0046] The direction of the steel plate or steel bar is perpendicular to and downwards from the direction of the anchor body, which is equivalent to being buckled into the rock and soil, thereby increasing the anchoring effect.

[0047] After all anchor bodies 10 on the same goaf discharge slope 19 are placed, drainage pipes 16 are placed at intervals on the goaf discharge slope 19 , and each drainage pipe 16 is arranged crosswise with the anchor bodies 10 .

[0048] An anchor rope 17 is tied to the anchor end of each anchor body 10. Each anchor rope 17 ties up each anchor body 10 located on the same goaf dump slope 19 from bottom to top, extends upward to the flat plate 21 of the dump step 22 and is fixed on the fixed pile.

[0049] Each anchor rope 17 binds and fixes each anchor body 10 and the corresponding drainage pipe 16 from bottom to top, and the anchor rope 17 is fixed on the flat plate 21 of the soil discharge step 22 by means of a fixing pile. The anchor rope 17 is arranged at intervals along the direction of the anchor body 10.

[0050] The rod body of the anchor body 10 of the present invention can also be set as a hollow structure with multiple holes in the outer wall, so that grouting can be injected into the rod body cavity in the case of insufficient anchoring force in the later stage; so that the grout is discharged from the hole into the soil to strengthen the anchoring effect, which can not only improve the anchoring resistance, but also improve the intrinsic physical and mechanical parameters of the loose medium, which is more conducive to improving the slope angle and reducing engineering costs. The number and performance of the anchor body 10 need to be determined according to the rock and soil properties.

[0051] like Figure 7 As shown, in the present invention, the angle between the secondary stripping slope 23 after construction and the horizontal plane of the goaf 18 is 30-55 degrees, preferably up to 45 degrees, which improves the slope angle and reduces engineering costs.

[0052] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A method for reinforcing a reserved slope by pre-embedded anchor bodies in a spoil dump in an open-pit mine, characterized in that: When the soil discharge slope (20) of the lower section of each soil discharge step (22) reaches a predetermined slope line during soil discharge, an anchor body (10) is placed on the soil discharge slope (19) of the goaf area of ​​each soil discharge step (22), so that the anchor end of the anchor body (10) is far away from the lower section (24) and the tensioning and tightening end is arranged close to the lower section (24), thereby allowing the anchor body (10) to anchor the soil of each soil discharge step (22) close to the soil discharge slope (20) of the lower section.

2. The method for reinforcing a reserved slope by pre-embedded anchor bodies in a spoil dump in an open-pit mine according to claim 1, characterized in that: During open-pit mining, the coalfield is divided into a plurality of adjacent mining areas for mining, and the stripped rock and soil generated during the excavation of each mining area is discharged into the goaf area (18); and the stripped rock and soil are continuously accumulated in the goaf area (18) to form multiple layers of soil discharge steps (22); the side of each soil discharge step (22) facing the goaf area (18) is the goaf area soil discharge slope (19), and the side facing the lower section (24) is the lower section soil discharge slope (20); the width and length of each soil discharge step (22) decreases layer by layer from bottom to top; The soil discharge transport tool travels on the flat plate (21) of each soil discharge step (22) and dumps the soil on the soil discharge slope of each soil discharge step (22), so that the soil continuously expands toward the mining area along the soil discharge slope (19) of the goaf of the soil discharge step (22) and accumulates along the soil discharge slope (19) of the goaf and continuously moves forward along the horizontal plane.

3. The method for reinforcing a reserved slope by pre-embedded anchor bodies in a spoil dump in an open-pit mine according to claim 1, characterized in that: After the anchor body (10) is arranged, the tray (12) is first installed on the tensioning and tightening end of the anchor body (10) and then the lock (11) is fixed.

4. The method for reinforcing a reserved slope by pre-embedded anchor bodies in a spoil dump in an open-pit mine according to claim 1, characterized in that: After the anchor body (10) is arranged, a lock (11) is installed at the tensioning and tightening end of the anchor body (10); When discharging soil, the soil is continuously accumulated along the discharging slope (20) of the lower section until it touches and is flush with the coal seam of the lower section (24); When the lower section (24) is mined, the soil between the plane where the tensioned and fastened ends of each anchor body (10) are located and the lower section (24) is stripped, and after the stripping, the slope surface of each soil discharge step (22) close to the lower section (24) is a secondary stripping slope surface (23).

5. The method for reinforcing a reserved slope by pre-embedded anchor bodies in an open-pit mine dump according to claim 4, characterized in that: Remove the locks (11) of each anchor body (10); then lay a protection net (13) on the secondary stripping slope (23); then place a horizontal protection rod (14) and a vertical protection rod (15) on the upper side of the protection net (13), so that the intersection of the horizontal protection rod (14) and the vertical protection rod (15) is the tensioning and fastening end of the anchor body (10); then install a tray (12) and a lock (11) on the tensioning and fastening end of the anchor body (10) in sequence, so that the tray (12) fixes the horizontal protection rod (14) and the vertical protection rod (15) as well as the protection net (13), and avoids soil interference in each discharge step (22) close to the secondary stripping slope (23) in the lower section (24) for coal mining.

6. The method for reinforcing a reserved slope by pre-embedded anchor bodies in a spoil dump in an open-pit mine according to claim 1, characterized in that: A plurality of anchor bodies (10) are placed on the goaf area discharge slope surface (19) of each discharge step (22) and are arranged at intervals; and a plurality of anchor bodies (10) are placed along the horizontal direction of each discharge step (22) and are arranged at intervals.

7. The method for reinforcing a reserved slope by pre-embedded anchor bodies in a spoil dump in an open-pit mine according to claim 1, characterized in that: Each anchor body (10) comprises a rod body, the anchoring end of the rod body is fixedly connected to an anchor reinforcement body, and a plurality of point reinforcement bodies are arranged on the rod body at intervals along the direction of the rod body. The anchor reinforcement body and the point reinforcement bodies are both concrete blocks, steel plates or steel bars.

8. The method for reinforcing a reserved slope by pre-embedded anchor bodies in a spoil dump in an open-pit mine according to claim 1, characterized in that: After all anchor bodies (10) on the same goaf discharge slope (19) are placed, drainage pipes (16) are placed at intervals on the goaf discharge slope (19), and each drainage pipe (16) is arranged crosswise with the anchor body (10).

9. The method for reinforcing a reserved slope by pre-embedded anchor bodies in a spoil dump in an open-pit mine according to claim 1, characterized in that: An anchoring rope (17) is tied to the anchoring end of each anchoring body (10), and each anchoring rope (17) ties up each anchoring body (10) located on the same goaf discharge slope (19) from bottom to top, and extends upward to the flat plate (21) of the discharge step (22) and is fixed on a fixed pile.

10. The method for reinforcing a reserved slope by pre-embedded anchor bodies in a spoil dump in an open-pit mine according to claim 9, characterized in that: Each anchor rope (17) is used to bind and fix each anchor body (10) and the corresponding drainage pipe (16) from bottom to top, and the anchor rope (17) is fixed on the flat plate (21) of the soil discharge step (22) by means of fixed piles.

Citation Information

Cited By

  • Closed-loop feedback type design method for sectional treatment length of soft foundation of dumping site

    CN122490650A