Drilling equipment for aluminum door frame production
By introducing a rotating component and a cleaning component into the drilling equipment, and using motors and electric telescopic rods to fix and clean the aluminum door frames, the problem of adjusting the position of the fixture in existing equipment is solved, work efficiency is improved, and automatic cleaning is achieved.
Patent Information
- Application Number
- CN202420309664.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2024-02-20
- Publication Date
- 2024-10-11
- Estimated Expiration
- 2034-02-20
AI Technical Summary
Existing drilling equipment needs to readjust the clamping position of the clamp assembly after each drilling operation is completed, which makes the process cumbersome and affects work efficiency.
A drilling equipment for the production of aluminum door frames is designed, including a rotating component and a cleaning component. The motor drives the two-way studs and the electric telescopic rod to realize the fixing and drilling of the aluminum door frame. The cooperation of the disc and the bump is used for automatic cleaning. Reduce follow-up work time.
It improves the overall work efficiency, reduces the time waste of adjustments after drilling, realizes the function of automatically cleaning debris, and simplifies the operation process.
Smart Images

Figure CN221818082U_ABST
Abstract
Description
Technical Field
[0001] The utility model relates to the technical field of drilling, in particular to a drilling device for producing aluminum door frames. Background Art
[0002] Aluminum alloy door is a kind of door made of surface treated aluminum alloy profiles, which are processed by cutting, punching, milling, tapping, and manufacturing to form door frame components, and then assembled with connectors, sealing materials and opening and closing hardware accessories. Doors made of aluminum alloy extruded profiles as frames, stiles, and leafs are called aluminum alloy doors, or aluminum doors for short. It includes doors with aluminum alloy as the base material of load-bearing rods (rods that bear and transmit deadweight and loads) and wood and plastic composite doors, which are referred to as aluminum-wood composite doors and aluminum-plastic composite doors.
[0003] A Chinese patent with patent number CN210996621U disclosed a high-precision drilling equipment for processing subway emergency door frame materials, including a workbench, a bearing frame welded on the top of the workbench, a cylinder installed on the top of the bearing frame, fixing holes on both sides of the bearing frame, a movable plate slidably connected to the inner wall of the fixing hole, a drill rod connected to one end of the motor output shaft, a first sleeve installed on both sides of the bottom end of the movable plate by screws, a second compression spring welded on the top of the inner wall of the fixing groove, one end of the two connecting rods are respectively welded to the two ends of the outer side of the positioning ring, the cylinder drives the movable plate to slide up and down, thereby driving the drill rod to move up and down through the movable plate, and the sliding connection method enables the drill rod to stably perform drilling work downward, and the positioning ring is used to align with the required drilling position in advance, and then drilling is performed, so that the drilling position can be accurately located to improve the accuracy of drilling.
[0004] However, the device still has the following problem: after each drilling operation is completed, the clamping position of the clamp assembly needs to be readjusted, which makes the process more complicated and wastes time, affecting the overall work efficiency. Utility Model Content
[0005] In order to solve the above technical problems, the utility model provides a drilling device for producing aluminum door frames.
[0006] The technical solution to achieve the purpose of the utility model is: a drilling device for aluminum door frame production, including a base, a notch 1 is provided in the middle of the base, a support frame and two fixing frames 2 are fixedly installed on the top of the base, and also includes;
[0007] A fixing assembly is used to fix the aluminum door frame. The fixing assembly includes a connecting block, a pressing plate and a motor 1. The output shaft of the motor 1 is fixedly mounted with a bidirectional stud rotatably mounted on a fixing frame 2. Two moving blocks are threadedly connected to the bidirectional stud. Transmission arms are rotatably mounted on the two moving blocks. The other end of the transmission arm rotates on the connecting block. The connecting block is fixedly connected to the pressing plate.
[0008] A rotating assembly drives the aluminum door frame fixed on the disc to rotate. The rotating assembly includes a disc and motor 2. Motor 2 is fixed in slot 1. The output shaft of motor 2 is fixedly connected with an extension shaft. The extension shaft movably passes through the base and is fixedly installed at the bottom of the disc.
[0009] Preferably, it also includes a drilling assembly, which includes a hydraulic rod, a drilling rig and an annular baffle. An electric telescopic rod is fixed on the support frame, and the extending end of the electric telescopic rod is fixedly connected to a base plate. The base plate is slidably connected to the support frame, and the drilling rig and the hydraulic rod are both fixedly mounted on the base plate. One end of the hydraulic rod is fixedly connected to the annular baffle.
[0010] Preferably, a cleaning assembly is further included, the cleaning assembly includes a fixing frame 1, the fixing frame 1 is fixed to the top of the base, and the fixing frame 1 is provided with bristles distributed at equal intervals.
[0011] Preferably, a plurality of protrusions are evenly spaced on the side wall of the disk, and a plurality of toolings are evenly spaced on the top of the disk.
[0012] Preferably, a second notch is provided on the top of the base, a second protrusion is fixed on the first fixing frame, the first fixing frame is slidably connected in the second notch, and a spring is fixed between the first fixing frame and the second notch.
[0013] Preferably, a fixing piece is fixed to one end of each of the two fixing frames 2, and the motor 1 is fixed on the fixing piece.
[0014] Preferably, an annular groove is provided between the disc and the base, and a plurality of balls are rotatably mounted in the annular groove.
[0015] Compared with the prior art, the present invention has the following significant advantages:
[0016] Firstly, in the utility model, a tooling part is arranged in the rotating assembly, which can extrude and fix the aluminum door frame, and at the same time, load and clean the aluminum door frame on other tooling parts, thereby reducing the subsequent operation time and improving the overall work efficiency.
[0017] Second, the utility model is provided with a movable cleaning device. By arranging a plurality of protrusions on the disc and the fixing member, each rotation of the disc drives the protrusions to rotate, and thrust is generated between the protrusions. Under the action of the second slot and the spring, the cleaning assembly is driven to reciprocate to clean the debris left by the drilling.
[0018] The invention solves the problem that the existing drilling device needs to readjust the clamping position of the clamp assembly after completing the drilling operation each time, which makes the process more complicated and wastes time, thereby reducing the overall work efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0019] The utility model is further explained below in conjunction with the accompanying drawings and embodiments:
[0020] Figure 1 It is a schematic diagram of a three-dimensional structure provided in one embodiment of the utility model;
[0021] Figure 2 It is a schematic diagram of the structure of a fixing assembly provided in one embodiment of the utility model;
[0022] Figure 3 It is a schematic diagram of the structure of a drilling rotation assembly provided in one embodiment of the utility model;
[0023] Figure 4 It is a schematic diagram of the disc structure provided in one embodiment of the utility model.
[0024] Description of reference numerals:
[0025] 1. Base; 2. Notch 1; 3. Disc; 4. Bump 1; 5. Tooling; 6. Support frame; 7. Electric telescopic rod; 8. Bottom plate; 9. Hydraulic rod; 10. Drilling rig; 11. Annular baffle; 12. Fixing frame 1; 13. Bristles; 14. Bump 2; 15. Notch 2; 16. Spring; 17. Fixing frame 2; 18. Motor 1; 19. Fixing piece; 20. Bidirectional stud; 21. Moving block; 22. Transmission arm; 23. Connecting block; 24. Press plate; 25. Annular notch; 26. Ball; 27. Motor 2; 28. Extension shaft. DETAILED DESCRIPTION
[0026] The utility model is described in detail below, and the technical solutions in the embodiments of the utility model are clearly and completely described. Obviously, the described embodiments are only part of the embodiments of the utility model, not all of the embodiments. Based on the embodiments of the utility model, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the utility model.
[0027] The utility model provides a drilling device for aluminum door frame production through improvement. The technical solution of the utility model is:
[0028] like Figure 1-3 As shown, a drilling device for aluminum door frame production includes a base 1, a notch 2 is provided in the middle of the base 1, a support frame 6 and two fixing frames 17 are fixedly installed on the top of the base 1, and also includes;
[0029] A fixing assembly is used to fix the aluminum door frame. The fixing assembly includes a connecting block 23, a pressure plate 24 and a motor 18. The output shaft of the motor 18 is fixedly installed with a bidirectional stud 20 rotatably installed on the fixing frame 17. Two moving blocks 21 are threadedly connected to the bidirectional stud 20. Transmission arms 22 are rotatably installed on the two moving blocks 21. The other end of the transmission arm 22 rotates on the connecting block 23. The connecting block 23 is fixedly connected to the pressure plate 24. When the motor 18 is started to rotate forward, the motor 18 drives the bidirectional stud 20 to rotate forward, driving the transmission arm 22 rotatably connected to the moving block 21 to push downward, further driving the pressure plate 24 to squeeze downward, and fixing the aluminum door frame on the tooling 5. When the motor 18 is started to rotate reversely, the bidirectional stud 20 of the motor 18 rotates in the opposite direction, driving the transmission arm 22 rotatably connected to the moving block 21 to move upward, and further driving the pressure plate 24 to move upward to release the aluminum door frame fixed on the tooling 5.
[0030] A rotating assembly drives the aluminum door frame fixed on the disc 3 to rotate. The rotating assembly includes the disc 3 and a motor 27. The output shaft of the motor 27 is fixedly connected to an extension shaft 28. The extension shaft 28 movably passes through the base 1 and is fixedly installed on the bottom of the disc 3. A plurality of tooling 5 are evenly spaced on the top of the disc 3. The plurality of tooling 5 can be set to realize unloading and cleaning while being fixed, which can save time and improve work efficiency. The motor 27 rotates, driving the disc 3 fixedly connected to the extension shaft 28 to rotate, and further driving the tooling 5 fixed on the disc 3 to rotate.
[0031] A drilling assembly is used to drill holes in the aluminum door frame fixed on the rotating assembly. The drilling assembly includes a hydraulic rod 9, a drilling rig 10 and an annular baffle 11. An electric telescopic rod 7 is fixed to the support frame 6. The extended end of the electric telescopic rod 7 is fixedly connected to the base plate 8. The drilling rig 10 is fixed to the base plate 8, and the base plate 8 is slidably connected to the support frame 6. The electric telescopic rod 7 is started to push the drilling rig 10 on the base plate 8 to move downward for drilling operations. The annular baffle 11 connected by the hydraulic rod 9 can prevent the splashing of excessive debris to a certain extent as the base plate 8 moves.
[0032] A cleaning component is used to clean the debris on the aluminum door frame after drilling. The cleaning component includes a fixing frame 12, which is fixed to the top of the base 1. The fixing frame 12 is provided with bristles 13 with equal spacing. The protrusion 14 provided on the disc 3 and the protrusion 2 14 on the fixing frame 12 cooperate with the spring 16. When the disc 3 rotates, the collision between the protrusion 14 and the protrusion 2 14 generates thrust, and the spring 16 provided therewith moves back and forth, so that the debris on the aluminum door frame after drilling is cleaned by the bristles 13 on the cleaning component.
[0033] Furthermore, a second notch 15 is provided on the top of the base 1 , a second protrusion 14 is fixed on the first fixing frame 12 , the first fixing frame 12 is slidably connected in the second notch 15 , and a spring 16 is fixed between the first fixing frame 12 and the second notch 15 .
[0034] Furthermore, a fixing piece 19 is fixed to one end of each of the two fixing frames 17 , and the motor 18 is fixed on the fixing piece 19 .
[0035] like Figure 3-4 As shown, the hydraulic rod 9 is fixedly mounted on the base plate 8, one end of the hydraulic rod 9 is fixedly connected to the annular baffle 11, and the motor 27 is fixed in the slot 2.
[0036] Furthermore, an annular groove 25 is provided between the disc 3 and the base 1, and a plurality of balls 26 are rollingly installed in the annular groove 25. The plurality of balls 26 cooperate with the two annular grooves 25 to make the rotation more stable. A plurality of protrusions 4 are evenly spaced on the side wall of the disc 3.
[0037] The specific working method is as follows: the aluminum door frame is placed on the tooling 5, and the motor 27 is started. The motor 27 rotates to drive the tooling 5 placed on the disc 3 to rotate. When the tooling 5 reaches the fixed area, the motor 27 stops rotating, and the motor 18 is started to rotate forward. The motor 18 drives the bidirectional stud 20 to rotate forward, driving the transmission arm 22 connected to the moving block 21 to push downward, and further drives the pressing plate 24 to squeeze downward to fix the aluminum door frame on the tooling 5. At the same time, the electric telescopic rod 7 and the drilling rig 10 are started. The electric telescopic rod 7 pushes the drilling rig 10 on the bottom plate 8 to move downward, and the annular baffle 11 connected by the hydraulic rod 9 moves with the bottom plate 8. After reaching the position, the aluminum door frame in the drilling area is drilled. After the drilling is completed, the motor 18 is started to reverse, and the motor 1 The two-way stud 20 rotates in the opposite direction, driving the transmission arm 22 rotatably connected to the moving block 21 to move upward, further driving the pressure plate 24 to move upward to loosen the aluminum door frame fixed on the tooling 5, and placing the undrilled aluminum door frame on the tooling 5 in the area to be processed, and starting the motor 27 to rotate again, driving the undrilled aluminum door frame to enter the drilling area, and driving the drilled aluminum door frame to enter the cleaning component area. When the disc 3 rotates, the protrusion 14 set on the disc 3 and the protrusion 2 14 on the fixed frame 12 cooperate with the spring 16, and the collision between the protrusion 14 and the protrusion 2 14 generates thrust, and the spring 16 is set to reciprocate, and the debris on the drilled aluminum door frame is cleaned by the bristles 13 on the cleaning component. After cleaning, the aluminum door frame on the tooling 5 is removed, and the operation is completed.
[0038] The technical means disclosed in the utility model are not limited to the technical means disclosed in the above technical means, but also include technical solutions composed of equivalent replacement of the above technical features. Matters not covered in the utility model belong to the common knowledge of those skilled in the art.
Claims
1. A drilling device for aluminum door frame production, comprising a base (1), a notch (2) is provided in the middle of the base (1), a support frame (6) and two fixing frames (17) are fixedly installed on the top of the base (1), characterized in that: Also includes; A fixing assembly, the fixing assembly is used to fix the aluminum door frame, the fixing assembly comprises a connecting block (23), a pressure plate (24) and a motor (18), the output shaft of the motor (18) is fixedly mounted with a bidirectional stud (20) rotatably mounted on a fixing frame (17), the bidirectional stud (20) is threadedly connected with two moving blocks (21), the two moving blocks (21) are both rotatably mounted with a transmission arm (22), the other end of the transmission arm (22) is rotatably mounted on the connecting block (23), and the connecting block (23) is fixedly connected to the pressure plate (24); A rotating assembly drives an aluminum door frame fixed on a disc (3) to rotate, and the rotating assembly comprises a disc (3) and a second motor (27). The second motor (27) is fixed in a first slot (2). The output shaft of the second motor (27) is fixedly connected to an extension shaft (28). The extension shaft (28) movably passes through the base (1) and is fixedly mounted on the bottom of the disc (3).
2. The drilling equipment for aluminum door frame production according to claim 1 is characterized in that: The drilling assembly also includes a hydraulic rod (9), a drilling rig (10) and an annular baffle (11); an electric telescopic rod (7) is fixed on the support frame (6); the extended end of the electric telescopic rod (7) is fixedly connected to a base plate (8); the base plate (8) is slidably connected to the support frame (6); the drilling rig (10) and the hydraulic rod (9) are both fixedly mounted on the base plate (8); and one end of the hydraulic rod (9) is fixedly connected to the annular baffle (11).
3. The drilling equipment for aluminum door frame production according to claim 1 is characterized in that: It also comprises a cleaning component, which comprises a fixing frame (12), wherein the fixing frame (12) is fixed on the top of the base (1), and bristles (13) are arranged on the fixing frame (12) at equal intervals.
4. The drilling equipment for aluminum door frame production according to claim 1, characterized in that: A plurality of protrusions (4) are distributed at equal intervals on the side wall of the disk (3), and a plurality of tooling (5) are distributed at equal intervals on the top of the disk (3).
5. The drilling equipment for aluminum door frame production according to claim 3 is characterized in that: The top of the base (1) is provided with a second notch (15), the first fixing frame (12) is fixed with a second protrusion (14), the first fixing frame (12) is slidably connected in the second notch (15), and a spring (16) is fixed between the first fixing frame (12) and the second notch (15).
6. The drilling equipment for aluminum door frame production according to claim 1, characterized in that: A fixing piece (19) is fixed to one end of each of the two fixing frames (17), and the motor (18) is fixed on the fixing piece (19).
7. The drilling equipment for aluminum door frame production according to claim 1, characterized in that: An annular notch (25) is provided between the disc (3) and the base (1), and a plurality of balls (26) are rotatably mounted in the annular notch (25).
