Embedded pipe water taking structure of rock-fill concrete gravity dam
By designing a circular water intake steel pipe, steel mesh and outer concrete that pass through the dam body in a rockfill concrete gravity dam and cover it with rockfill concrete, the problem of structural instability at the joint between the steel pipe and concrete is solved and construction is simple and cost-effective. Low effect.
Patent Information
- Application Number
- CN202323492652.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Utility models(China)
- Current Assignee / Owner
- Filing Date
- 2023-12-20
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2033-12-20
AI Technical Summary
In the design of rockfill concrete gravity dams, cracks and deformations are prone to occur at the joint between steel pipes and concrete, leading to structural instability.
Use a circular water intake steel pipe that passes through a rock-fill concrete gravity dam. The steel pipe is covered with a steel mesh, and is wrapped with a square steel pipe with concrete, and finally covered with rock-fill concrete. The designed bending angle is less than 45 degrees, and the bending radius is not less than the inner diameter of the steel pipe. 1.5 times, combined with water machine equipment in the corridor and downstream valve chamber to control the structure.
It improves the stability of the joint between the steel pipe and the rockfill concrete gravity dam, reduces the construction procedures and costs, reduces the possibility of cracks and deformation, and achieves a simple and economical structure.
Smart Images

Figure CN221919631U_ABST
Abstract
Description
Technical Field
[0001] The utility model belongs to the technical field of water conservancy engineering structure design, and relates to a buried pipe water intake structure in a rockfill concrete gravity dam. Background Art
[0002] In the design of reservoir dam hubs, in order to make the hub buildings compact and reduce the amount of engineering and investment, it is often necessary to bury the water delivery steel pipe inside the dam body. Conventional gravity dam water intake steel pipes are often set in the normal concrete water intake dam section, and the water intake steel pipes are buried inside the dam body of this section. In the design of rockfill concrete gravity dams, the amount of non-rockfill concrete is often reduced as much as possible to achieve the purpose of reducing concrete investment. In addition, the design layout of reducing the non-rockfill concrete area is conducive to fast, convenient, efficient and orderly construction.
[0003] Due to the characteristics of high casting surface and large stone size of rockfill concrete gravity dam, cracks and deformation are prone to occur at the junction of steel pipe and rockfill concrete gravity dam. It is necessary to optimize the structure of the junction between the existing water intake steel pipe and concrete gravity dam.
[0004] In summary, the existing technology has the problem of unstable structure at the joint of steel pipe and rockfill concrete gravity dam. Utility Model Content
[0005] The utility model aims to provide a buried pipe water intake structure in a rockfill concrete gravity dam, which solves the problem of unstable structure of the joint part between the steel pipe and the rockfill concrete gravity dam in the technology.
[0006] The technical solution adopted by the utility model is a buried pipe water intake structure in a rockfill concrete gravity dam, comprising a water intake steel pipe which passes through the rockfill concrete gravity dam and has a circular radial cross-section, one end of the water intake steel pipe is connected to a water intake port located outside the dam body, and the water intake steel pipe passes through the gallery valve chamber and the downstream valve chamber in sequence.
[0007] The water intake steel pipe bends downward after passing through the corridor valve chamber, and the maximum bending angle is less than 45 degrees, and the bending radius is not less than 1.5 times the inner diameter of the water intake steel pipe; the water intake steel pipe bends upward before entering the downstream valve chamber, and the maximum bending angle is less than 45 degrees, and the bending radius is not less than 1.5 times the inner diameter of the water intake steel pipe.
[0008] The outer jacket of the water intake steel pipe is provided with a steel mesh with a circular radial cross-section and composed of a number of steel bars. The diameter of the steel bars in the steel mesh is not greater than 24mm and not less than 16mm. The distance between the steel mesh and the outer wall of the water intake steel pipe is not greater than 0.24m and not less than 0.16m.
[0009] The utility model is also characterized in that:
[0010] The steel mesh is wrapped with a steel pipe with a square radial cross-section and then wrapped with concrete. The minimum thickness of the steel pipe wrapped with concrete is not more than 1.2m and not less than 0.8m.
[0011] Rockfill concrete is arranged outside the steel pipe outer-wrapped concrete, and a number of rockfills with a particle size of 20cm-50cm are arranged in the rockfill concrete near the steel pipe outer-wrapped concrete.
[0012] The cross section of the gallery valve room is in the shape of a circular arch. A pipeline water machine equipment a serving as a control hub is arranged in the gallery valve room. The pipeline water machine equipment a3 is connected to the water intake steel pipe. The pipeline water machine equipment a includes a pressure regulating valve, a flow regulating valve, an expansion joint and a pier.
[0013] The cross-section of the downstream valve chamber is rectangular. The downstream valve chamber is equipped with a pipeline water machine equipment b as a control hub. The pipeline water machine equipment b is connected to the water intake steel pipe. The pipeline water machine equipment b includes a pressure regulating valve, a flow regulating valve, an expansion joint and a pier.
[0014] The beneficial effects of the utility model are as follows: the buried pipe water intake structure in the dam provided by the utility model has the characteristics of simple structure, simple construction and low cost, can make full use of the material properties of the rockfill concrete gravity dam itself, reduce the construction process flow, and reduce the possibility of cracks and deformation at the joint of the steel pipe and the rockfill concrete gravity dam. BRIEF DESCRIPTION OF THE DRAWINGS
[0015] Figure 1 This is a schematic diagram of the buried pipe water intake structure of the rockfill concrete gravity dam of the utility model;
[0016] Figure 2 The utility model is a schematic cross-sectional view of an internally buried pipe of a rockfill concrete gravity dam internally buried pipe water intake structure.
[0017] In the figure, 1. water intake; 2. gallery valve room; 3. pipeline water machine equipment a; 4. water intake steel pipe; 5. steel pipe wrapped with concrete; 6. rockfill concrete; 7. steel mesh; 8. downstream valve room; 9. pipeline water machine equipment b. DETAILED DESCRIPTION
[0018] The utility model is described in detail below with reference to the accompanying drawings and specific implementation modes.
[0019] The utility model of the rockfill concrete gravity dam internal buried pipe water intake structure, such as Figure 1As shown, it includes a water intake steel pipe 4 that passes through the rockfill concrete gravity dam and has a circular radial cross section. One end of the water intake steel pipe 4 is connected to a water intake port 1 located outside the dam body. The water intake steel pipe 4 passes through the gallery valve chamber 2 and the downstream valve chamber 8 in sequence. After passing through the gallery valve chamber 2, the water intake steel pipe 4 bends downward, and the maximum bending angle is less than 45 degrees, and the bending radius is not less than 1.5 times the inner diameter of the water intake steel pipe 4; before entering the downstream valve chamber 8, the water intake steel pipe 4 bends upward, and the maximum bending angle is less than 45 degrees, and the bending radius is not less than 1.5 times the inner diameter of the water intake steel pipe 4. The water intake steel pipe 4 is covered with a steel mesh 7 with a circular radial cross section and composed of a plurality of steel bars. The diameter of the steel bars in the steel mesh 7 is not more than 24mm and not less than 16mm, and the distance between the steel mesh 7 and the outer wall of the water intake steel pipe 4 is not more than 0.24m and not less than 0.16m.
[0020] Steel mesh 7 outsourcing Figure 2 The steel pipe outer concrete 5 shown has a square radial cross section, and the minimum thickness of the steel pipe outer concrete 5 is not more than 1.2m and not less than 0.8m. Rockfill concrete 6 is arranged outside the steel pipe outer concrete 5, and a number of rockfills with a particle size of 20cm-50cm are arranged near the steel pipe outer concrete 5. The corridor valve chamber 2 has a round arch shape in cross section, and a pipeline water machine equipment a3 as a control hub is arranged in the corridor valve chamber 2. The pipeline water machine equipment a3 is connected to the water intake steel pipe 4, and the pipeline water machine equipment a3 includes a pressure regulating valve, a flow regulating valve, a telescopic joint and a buttress. The downstream valve chamber 8 has a rectangular cross section, and a pipeline water machine equipment b9 as a control hub is arranged in the downstream valve chamber 8. The pipeline water machine equipment b9 is connected to the water intake steel pipe 4, and the pipeline water machine equipment b9 includes a pressure regulating valve, a flow regulating valve, a telescopic joint and a buttress.
[0021] Example 1
[0022] like Figure 1 As shown, this embodiment proposes a buried pipe water intake structure in a rockfill concrete gravity dam, including a water intake steel pipe 4 that passes through the rockfill concrete gravity dam and has a circular radial cross section, one end of the water intake steel pipe 4 is connected to a water intake port 1 located outside the dam body, and the water intake steel pipe 4 passes through the gallery valve chamber 2 and the downstream valve chamber 8 in sequence. After passing through the gallery valve chamber 2, the water intake steel pipe 4 bends downward, and the maximum bending angle is less than 45 degrees, and the bending radius is not less than 1.5 times the inner diameter of the water intake steel pipe 4; before entering the downstream valve chamber 8, the water intake steel pipe 4 bends upward, and the maximum bending angle is less than 45 degrees, and the bending radius is not less than 1.5 times the inner diameter of the water intake steel pipe 4.
[0023] Example 2
[0024] like Figure 1-2As shown, this embodiment proposes a buried pipe water intake structure in a rockfill concrete gravity dam, including a water intake steel pipe 4 that passes through the rockfill concrete gravity dam and has a circular radial cross section, one end of the water intake steel pipe 4 is connected to a water intake port 1 located outside the dam body, and the water intake steel pipe 4 passes through the gallery valve chamber 2 and the downstream valve chamber 8 in sequence. After passing through the gallery valve chamber 2, the water intake steel pipe 4 bends downward, and the maximum bending angle is less than 45 degrees, and the bending radius is not less than 1.5 times the inner diameter of the water intake steel pipe 4; before entering the downstream valve chamber 8, the water intake steel pipe 4 bends upward, and the maximum bending angle is less than 45 degrees, and the bending radius is not less than 1.5 times the inner diameter of the water intake steel pipe 4. The water intake steel pipe 4 is covered with a steel mesh 7 with a circular radial cross section and composed of a plurality of steel bars, the diameter of the steel bars in the steel mesh 7 is not more than 24 mm and not less than 16 mm, and the distance between the steel mesh 7 and the outer wall of the water intake steel pipe 4 is not more than 0.24 m and not less than 0.16 m. The steel mesh 7 is covered with a steel pipe-covered concrete 5 with a square radial cross section, and the minimum thickness of the steel pipe-covered concrete 5 is not more than 1.2m and not less than 0.8m. Rockfill concrete 6 is arranged outside the steel pipe-covered concrete 5, and a number of rockfills with a particle size of 20cm-50cm are arranged near the steel pipe-covered concrete 5 in the rockfill concrete 6.
[0025] Example 3
[0026] like Figure 1-2As shown, this embodiment proposes a buried pipe water intake structure in a rockfill concrete gravity dam, including a water intake steel pipe 4 that passes through the rockfill concrete gravity dam and has a circular radial cross section, one end of the water intake steel pipe 4 is connected to a water intake port 1 located outside the dam body, and the water intake steel pipe 4 passes through the gallery valve chamber 2 and the downstream valve chamber 8 in sequence. After passing through the gallery valve chamber 2, the water intake steel pipe 4 bends downward, and the maximum bending angle is less than 45 degrees, and the bending radius is not less than 1.5 times the inner diameter of the water intake steel pipe 4; before entering the downstream valve chamber 8, the water intake steel pipe 4 bends upward, and the maximum bending angle is less than 45 degrees, and the bending radius is not less than 1.5 times the inner diameter of the water intake steel pipe 4. The water intake steel pipe 4 is covered with a steel mesh 7 with a circular radial cross section and composed of a plurality of steel bars, the diameter of the steel bars in the steel mesh 7 is not more than 24 mm and not less than 16 mm, and the distance between the steel mesh 7 and the outer wall of the water intake steel pipe 4 is not more than 0.24 m and not less than 0.16 m. The steel mesh 7 is wrapped with a steel pipe wrapped with concrete 5 with a square radial cross section, and the minimum thickness of the steel pipe wrapped with concrete 5 is not more than 1.2m and not less than 0.8m. Rockfill concrete 6 is arranged outside the steel pipe wrapped with concrete 5, and a number of rockfills with a particle size of 20cm-50cm are arranged near the steel pipe wrapped with concrete 5 in the rockfill concrete 6. The cross section of the corridor valve chamber 2 is in the shape of a round arch, and the corridor valve chamber 2 is provided with a pipeline water machine equipment a3 as a control hub, and the pipeline water machine equipment a3 is connected to the water intake steel pipe 4, and the pipeline water machine equipment a3 includes a pressure regulating valve, a flow regulating valve, a telescopic joint and a buttress. The downstream valve chamber 8 is rectangular in cross section, and the downstream valve chamber 8 is provided with a pipeline water machine equipment b9 as a control hub, and the pipeline water machine equipment b9 is connected to the water intake steel pipe 4, and the pipeline water machine equipment b9 includes a pressure regulating valve, a flow regulating valve, a telescopic joint and a buttress.
[0027] During implementation, the following points should be noted:
[0028] The blocks of rockfill concrete 6 near the steel tube outer-wrapped concrete 5 can be stacked to 1 / 2 of the bin surface height according to the self-interlocking condition of the stacked stones. After the lower 1 / 2 casting bin is poured with concrete, the remaining blocks of rockfill concrete 6 can be manually stacked into the bin to the upper 1 / 2 casting bin immediately, and then the upper concrete can be poured. The pouring of the steel tube outer-wrapped concrete 5 can be achieved without setting a separation template.
[0029] Before pouring the rockfill concrete 6 of the buried pipe water intake structure of the rockfill concrete gravity dam, the rockfill entry route and concrete pouring points should be reasonably arranged according to the pouring bin surface conditions. The treatment of the foundation bin surface before the rockfill is entered can be carried out according to the conventional concrete treatment method. The concrete skin, surface cracks, mortar caused by water seepage, and loose rockfill embedded in the surface on the foundation bin surface must be removed and roughened. The foundation bin surface must be kept clean and there should be no stagnant water.
[0030] Before the compressive strength of rockfill concrete 6 reaches 2.5MPa, the surface preparation work on the upper part shall not be carried out. The finished rockfill products should be directly transported into the warehouse by dump trucks, or by cranes, cable cars and other means. They should not be circulated. In order to prevent the wheels from bringing in mud, flushing facilities should be arranged on the road to the warehouse, and the wheels should be washed before entering the warehouse. The process of rockfill entering the warehouse should be controlled not to have a large impact on the concrete of the foundation warehouse, so as to avoid micro cracks in the lower-age concrete and cause early damage to the building. The rockfill paving should meet the following requirements:
[0031] (1) The layer thickness should be determined through on-site production tests. The thickness of each layer of rockfill can be controlled at 1.2m to 1.5m, and generally not more than 2.0m.
[0032] (2) The rock pile should be leveled by an excavator. The rock pile near the formwork, embedded parts, water stop, dam joints, etc. should be stacked manually to avoid damage to these parts caused by mechanical construction.
[0033] (3) During the rockfill construction process, the number of stones with a particle size greater than 200 mm and less than 300 mm on the exposed surface of the rockfill shall not exceed 10 pieces / m2, and they should not be concentrated. Stones with a particle size less than 200 mm are strictly prohibited from entering the warehouse. Large stones with a particle size greater than 800 mm should be placed in the middle of the warehouse surface to avoid affecting the surface quality of the rockfill concrete.
[0034] (4) It is advisable to place the larger-sized rocks in the lower-middle part of the bin surface, and the smaller-sized rocks in the upper-middle part of the bin surface.
[0035] (5) The rockfill in contact with the foundation silo concrete should strictly avoid large-area contact to avoid affecting the bonding of the cold joints.
[0036] (4) When the rocks are piled into the bin, no soil shall be brought into the bin surface. The soil that has been brought into the bin must be removed before pouring the upper concrete, otherwise the upper concrete shall not be poured.
[0037] The poured rockfill concrete should be protected from water accumulation and sunlight exposure before curing. Watering curing should be started within 6h to 18h after pouring. Concrete should be cured continuously, and the concrete surface should be kept moist during the curing period. During the construction interval, thermal insulation curing should be started after the rockfill concrete has finally set. For construction joints, curing work should continue until the next layer of rockfill concrete is laid; for permanently exposed surfaces, the curing time should not be less than 28d, and the curing time should be appropriately extended for parts with special requirements.
[0038] The welded joints of the steel bars should be staggered, and the number of overlapped steel bars of the same section should not exceed 1 / 3. The stressed plain round steel bars in the binding skeleton should be made into 180° hooks at the ends, and the length of the straight section after bending should not be less than three times the diameter of the steel bar. For welded joints with a steel bar diameter of no more than 28mm, flash butt welding or lap welding should be used; when the steel bar diameter is greater than 28mm, welding with a helper bar should be used, and the cross-sectional area of the helper bar should not be less than 1.5 times the cross-sectional area of the stressed steel bar.
Claims
1. The buried pipe water intake structure of rockfill concrete gravity dam is characterized by: It comprises a water intake steel pipe (4) which passes through a rockfill concrete gravity dam and has a circular radial cross section, one end of the water intake steel pipe (4) is connected to a water intake port (1) located outside the dam body, and the water intake steel pipe (4) passes through a gallery valve chamber (2) and a downstream valve chamber (8) in sequence; The water intake steel pipe (4) is bent downward after passing through the gallery valve chamber (2), and the maximum bending angle is less than 45 degrees, and the bending radius is not less than 1.5 times the inner diameter of the water intake steel pipe (4); the water intake steel pipe (4) is bent upward before entering the downstream valve chamber (8), and the maximum bending angle is less than 45 degrees, and the bending radius is not less than 1.5 times the inner diameter of the water intake steel pipe (4); The water intake steel pipe (4) is covered with a steel mesh (7) with a circular radial cross section and composed of a plurality of steel bars, the diameter of the steel bars in the steel mesh (7) is not greater than 24 mm and not less than 16 mm, and the distance between the steel mesh (7) and the outer wall of the water intake steel pipe (4) is not greater than 0.24 m and not less than 0.16 m.
2. The rockfill concrete gravity dam internal buried pipe water intake structure according to claim 1, characterized in that: The steel mesh (7) is covered with a steel pipe covered with concrete (5) having a square radial cross section, and the minimum thickness of the steel pipe covered with concrete (5) is not more than 1.2m and not less than 0.8m.
3. The rockfill concrete gravity dam internal buried pipe water intake structure according to claim 2, characterized in that: Rockfill concrete (6) is arranged outside the steel pipe outer-wrapped concrete (5), and a plurality of rockfills with a particle size of 20 cm to 50 cm are arranged inside the rockfill concrete (6) near the steel pipe outer-wrapped concrete (5).
4. The rockfill concrete gravity dam internal buried pipe water intake structure according to claim 3, characterized in that: The corridor valve chamber (2) has a round arch-shaped cross section. A pipeline water machine device a (3) serving as a control hub is arranged in the corridor valve chamber (2). The pipeline water machine device a (3) is connected to a water intake steel pipe (4). The pipeline water machine device a (3) comprises a pressure regulating valve, a flow regulating valve, an expansion joint and a buttress.
5. The rockfill concrete gravity dam internal buried pipe water intake structure according to claim 4, characterized in that: The downstream valve chamber (8) has a rectangular cross section. A pipeline water machine device b (9) serving as a control hub is arranged in the downstream valve chamber (8). The pipeline water machine device b (9) is connected to the water intake steel pipe (4). The pipeline water machine device b (9) includes a pressure regulating valve, a flow regulating valve, an expansion joint and a support pier.