Hot melting material taking device for gold processing

By designing a gold processing device including a workbench, crucible, auxiliary mechanism and drainage mechanism, the problem of splashing out of gold melt during processing is solved, and the stable pouring and safe material collection of gold melt is achieved, which improves the Safety and efficiency of operation.

CN221952295UActive Publication Date: 2024-11-05CHENGDU JUNGUAN PRECIOUS METAL PRODUCTS CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420516164.9
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-18
Publication Date
2024-11-05
Estimated Expiration
2034-03-18

Smart Images

  • Figure CN221952295U_ABST
    Figure CN221952295U_ABST
Patent Text Reader

Abstract

The utility model discloses a hot melting material taking device for gold processing, and relates to the technical field of gold processing, the hot melting material taking device for gold processing comprises a workbench and a crucible, the top of the workbench is provided with an auxiliary mechanism used for turning over the circumference of the crucible, a mold is placed on a mold placing plate, a motor is started to drive a bidirectional screw rod to rotate, and the crucible is placed on the workbench. Two sliding blocks are made to slide close to each other, a double-ring rod is driven to rotate on a first shaft column and a second shaft column, angle change is generated, a mold containing plate is longitudinally pushed, the height of a mold and the height of a drainage pipe are reduced, an air cylinder is started, a connecting rod is retracted, a fixing rod is driven to move leftwards, and a rack moves leftwards along with the fixing rod to drive a gear to rotate; the cross column is driven to rotate, the crucible is turned over along with rotation of the cross column, molten gold in the crucible is poured into the rectangular shell, guided into the drainage pipe through the flow guide plate and then flows outwards into the mold, and therefore the molten gold in the crucible is safely and stably taken into the mold, operation is easy, and safety is high.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of gold processing, in particular to a hot-melt material taking device for gold processing. Background Art

[0002] Gold is the single substance form of the chemical element gold (Au). It is a soft, golden, corrosion-resistant precious metal. As a precious metal, gold has good physical properties. "Real gold is not afraid of fire" means that gold has high chemical stability and is not easy to react chemically with other substances. There is no need to worry about oxidation and discoloration. It has a high density, feels heavy, has good toughness and ductility, and has good conductivity.

[0003] In the prior art, in the processing and production of gold, the gold is placed in a crucible, heated into a molten liquid, and then the molten liquid is poured into a mold. During this process, the staff generally pick up the crucible with a clamp and pour the molten liquid into the mold. Since the crucible is heating the gold, the temperature is high and the staff may be scalded. In addition, during the process of the staff picking up and turning the crucible, if the staff's hand strength is unstable, the molten gold may spill outside the mold.

[0004] For this reason, a hot-melt material taking device for gold processing is proposed. Utility Model Content

[0005] The purpose of the utility model is to solve the problems raised in the above background technology. The utility model provides a hot-melt material taking device for gold processing.

[0006] In order to achieve the above-mentioned purpose, the utility model specifically adopts the following technical solutions:

[0007] A hot-melt material-taking device for gold processing comprises a workbench and a crucible, wherein an auxiliary mechanism for turning the crucible in a circle is arranged on the top of the workbench, and the crucible is arranged on the auxiliary mechanism, and a drainage mechanism for receiving and guiding the molten gold poured from the crucible is arranged on the top of the workbench, and a lifting mechanism for adjusting the height is arranged on one side of the workbench, and the auxiliary mechanism comprises two rectangular plates, which are mounted on the top of the workbench, and cross columns are rotatably mounted on the two rectangular plates, and the crucible is mounted between the two cross columns, gears are mounted on the sides of the two cross columns away from the rectangular plates, and fixed plates are mounted on the sides of the two rectangular plates away from each other, fixed rods are slidably mounted in the two fixed plates, and racks are mounted on the tops of the two fixed rods, and the racks are slidably mounted on the top surfaces of the fixed plates, and the racks are meshed with the gears.

[0008] Furthermore, the auxiliary mechanism also includes a support plate, which is installed on the top of the workbench, a cylinder is installed on the right side of the support plate, a connecting rod is installed on the right side of the cylinder, and two fixing rods are installed on the right side of the connecting rod.

[0009] Furthermore, the drainage mechanism includes a rectangular shell, which is installed on the top of the workbench, a guide plate is installed on the inner wall of the rectangular shell, and a drainage pipe is installed on the right side of the rectangular shell.

[0010] Furthermore, a fixing frame is installed on the right side of the drainage tube, and a shielding plate is slidably installed on the fixing frame.

[0011] Furthermore, the lifting mechanism includes an L-shaped plate, which is installed on the top of the workbench, and two fixed blocks are installed on the surface of the L-shaped plate, a bidirectional screw is rotatably installed between the two fixed blocks, a sliding groove is opened on the surface of the L-shaped plate, two sliding blocks are threadedly installed on the outer wall of the bidirectional screw, and the sliding blocks are slidably installed on the inner wall of the sliding groove, and a motor is installed on the rear side of the bidirectional screw, and the motor is installed on the surface of the L-shaped plate.

[0012] Furthermore, an axis column 1 is installed on each of the two sliding blocks, a double-ring rod is rotatably installed on the outer wall of each of the two axis columns 1, an axis column 2 is rotatably installed in the ring opening of the two double-ring rods away from the axis column 1, two connecting blocks are installed on the two axis columns 2, and a mold placement plate is installed on the top of the two connecting blocks.

[0013] The beneficial effects of the utility model are as follows:

[0014] The utility model places the mold on the mold placement plate by arranging the cross column, the rectangular shell and the mold placement plate, starts the motor, drives the bidirectional screw to rotate, makes the two sliders slide close to each other on the bidirectional screw and in the slide groove, drives the two double ring rods to rotate on the shaft column one and the shaft column two respectively, produces the angle change, pushes the mold placement plate longitudinally, reduces the height of the mold and the drainage tube, makes the gold melt stably take the material into the mold, avoids the gold melt spilling out of the mold due to the height problem, starts the cylinder, retracts the connecting rod, drives the fixed rod to move leftward, and the rack moves leftward accordingly. , driving the gear to rotate, driving the cross column to rotate, and the crucible flips with the rotation of the cross column, pouring the molten gold in the crucible into the rectangular shell, guided by the guide plate to the drainage tube, and then flowing out to the mold. When the first mold is full of molten gold, the baffle plate can be inserted into the fixed frame to close the pipe mouth of the drainage tube, and the next mold can be replaced. After the replacement of the next mold is completed, the baffle plate is pulled out from the fixed frame, so that the molten gold in the crucible can be safely and smoothly taken into the mold. The operation is simple, the safety is high, and the workload of the staff is reduced. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a three-dimensional structural schematic diagram of the utility model;

[0016] Figure 2 It is a schematic diagram of the structure of the utility model viewed from above;

[0017] Figure 3 It is a cross-sectional structural schematic diagram of the utility model;

[0018] Figure 4 It is a partial exploded structural schematic diagram of the lifting mechanism of the utility model.

[0019] 1. Workbench; 2. Auxiliary mechanism; 201. Rectangular plate; 202. Cross column; 203. Support plate; 204. Cylinder; 205. Connecting rod; 206. Fixed plate; 207. Fixed rod; 208. Rack; 209. Gear; 3. Crucible; 4. Drainage mechanism; 401. Rectangular shell; 402. Guide plate; 403. Drainage tube; 404. Fixed frame; 405. Shielding plate; 5. Lifting mechanism; 501. L-shaped plate; 502. Fixed block; 503. Bidirectional screw; 504. Slide; 505. Slider; 506. Shaft column one; 507. Double ring rod; 508. Shaft column two; 509. Connecting block; 510. Mold placement plate; 511. Motor. DETAILED DESCRIPTION

[0020] In order to make the purpose, technical scheme and advantages of the embodiments of the utility model clearer, the technical scheme in the embodiments of the utility model will be clearly and completely described below in conjunction with the drawings in the embodiments of the utility model. Obviously, the described embodiments are part of the embodiments of the utility model, not all of the embodiments. Generally, the components of the embodiments of the utility model described and shown in the drawings here can be arranged and designed in various different configurations.

[0021] Therefore, the following detailed description of the embodiments of the present invention provided in the accompanying drawings is not intended to limit the scope of the present invention to be protected, but merely represents selected embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0022] It should be noted that similar reference numerals and letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further defined and explained in the subsequent drawings. In addition, the terms "first", "second", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.

[0023] The electrical components mentioned in this article are all connected to an external main controller and 220V mains electricity, and the main controller can be a conventional known device for controlling a computer or the like.

[0024] In the description of the embodiments of the present invention, it should be noted that the terms "inside", "outside", "upper", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, or are the orientations or positional relationships in which the utility model product is usually placed when in use. They are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention.

[0025] like Figure 1-4 As shown, a hot-melt material-taking device for gold processing comprises a workbench 1 and a crucible 3. An auxiliary mechanism 2 for turning the crucible 3 in a circle is arranged on the top of the workbench 1, and the crucible 3 is arranged on the auxiliary mechanism 2. A drainage mechanism 4 for receiving and guiding the gold melt poured out of the crucible 3 is arranged on the top of the workbench 1. A lifting mechanism 5 for adjusting the height is arranged on one side of the workbench 1. The auxiliary mechanism 2 comprises two rectangular plates 201, which are mounted on the top of the workbench 1. Cross pillars 202 are rotatably mounted on the two rectangular plates 201, and the crucible 3 is mounted between the two cross pillars 202. Gears 209 are mounted on the sides of the two cross pillars 202 away from the rectangular plates 201. Fixed plates 206 are mounted on the sides of the two rectangular plates 201 away from each other. Fixed rods 207 are slidably mounted in the two fixed plates 206, and racks 208 are mounted on the tops of the two fixed rods 207. , the rack 208 is slidably arranged on the top surface of the fixed plate 206, and the rack 208 is meshed with the gear 209. In this embodiment, when in use, firstly, according to the height between the applied mold and the drainage mechanism 4, the lifting mechanism 5 is adjusted to reduce its height to prevent the drainage mechanism 4 from draining the molten gold into the mold, and the molten gold splashes out of the mold due to the height problem, and the driving parts in the auxiliary mechanism 2 are started to drive the fixed rod 207 to slide in the fixed plate 206, drive the rack 208 to move leftward, drive the gear 209 to rotate, drive the cross column 202 to rotate, and the crucible 3 is turned over with the rotation of the cross column 202, and the molten gold in the crucible 3 is poured into the drainage mechanism 4, and the drainage mechanism 4 receives and drains the molten gold into the mold, thereby realizing the safe and stable material removal of the molten gold in the crucible 3 into the mold, which is simple to operate, highly safe, and reduces the workload of the staff.

[0026] like Figure 1-4As shown, the auxiliary mechanism 2 also includes a support plate 203, which is installed on the top of the workbench 1. A cylinder 204 is installed on the right side of the support plate 203, a connecting rod 205 is installed on the right side of the cylinder 204, and two fixed rods 207 are installed on the right side of the connecting rod 205. In this embodiment, the cylinder 204 is stably supported by the support plate 203, and the cylinder 204 is started to retract the connecting rod 205, driving the fixed rod 207 to move to the left.

[0027] like Figure 1-2 , Figure 4 As shown, the drainage mechanism 4 includes a rectangular shell 401, which is installed on the top of the workbench 1, and a guide plate 402 is installed on the inner wall of the rectangular shell 401. A drainage tube 403 is installed on the right side of the rectangular shell 401. In this embodiment, the gold melt poured by flipping the crucible 3 is poured into the rectangular shell 401, guided by the guide plate 402 into the drainage tube 403, and discharged outward.

[0028] like Figure 2 As shown, a fixed frame 404 is installed on the right side of the drainage tube 403, and a shielding plate 405 is slidably installed on the fixed frame 404. In this embodiment, through the arrangement of the fixed frame 404 and the shielding plate 405, when a mold is filled with molten gold, the shielding plate 405 can be inserted into the fixed frame 404 to close the tube mouth of the drainage tube 403, and the next mold can be replaced. After the replacement of the next mold is completed, the shielding plate 405 is pulled out from the fixed frame 404.

[0029] like Figure 1-2 , Figure 4 As shown, the lifting mechanism 5 includes an L-shaped plate 501, which is installed on the top of the workbench 1. Two fixed blocks 502 are installed on the surface of the L-shaped plate 501, and a bidirectional screw 503 is rotatably installed between the two fixed blocks 502. A slide groove 504 is opened on the surface of the L-shaped plate 501, and two sliders 505 are threadedly installed on the outer wall of the bidirectional screw 503, and the sliders 505 are slidably installed on the inner wall of the slide groove 504. A motor 511 is installed on the rear side of the bidirectional screw 503, and the motor 511 is installed on the surface of the L-shaped plate 501. In this embodiment, the motor 511 is started to drive the bidirectional screw 503 to rotate, so that the two sliders 505 slide close to each other on the bidirectional screw 503 and in the slide groove 504.

[0030] like Figure 4As shown, shaft column 1 506 is installed on each of the two sliders 505, and double ring rods 507 are rotatably installed on the outer walls of the two shaft columns 1 506, and shaft column 2 508 is rotatably installed in the ring openings of the two double ring rods 507 away from shaft column 1 506, and two connecting blocks 509 are installed on the two shaft columns 2 508, and a mold placement plate 510 is installed on the top of the two connecting blocks 509. In this embodiment, when the two sliders 505 move towards each other, the two double ring rods 507 are driven to rotate on shaft column 1 506 and shaft column 2 508 respectively, resulting in an angle change, and the mold placement plate 510 is pushed longitudinally, thereby adjusting the height of the mold placement plate 510.

[0031] In summary, when in use, firstly, the height between the applied mold and the drainage mechanism 4 is adjusted through the lifting mechanism 5 to reduce its height, so as to prevent the drainage mechanism 4 from draining the molten gold into the mold, and the molten gold splashing out of the mold due to the height problem, and start the driving parts in the auxiliary mechanism 2 to drive the fixed rod 207 to slide in the fixed plate 206, drive the rack 208 to move to the left, drive the gear 209 to rotate, drive the cross column 202 to rotate, and the crucible 3 is turned over with the rotation of the cross column 202, and the molten gold in the crucible 3 is poured into the drainage mechanism 4, and the drainage mechanism 4 receives and drains the molten gold into the mold, thereby realizing the safe and stable material extraction of the molten gold in the crucible 3 into the mold, which is simple to operate, highly safe, and reduces the workload of the staff, and the cylinder 204 is stably supported by the support plate 203, and the cylinder 204 is started, and the connecting rod 205 is retracted to drive the fixed plate 206 to rotate. The rod 207 moves to the left, and the gold melt poured by the crucible 3 is poured into the rectangular shell 401, guided by the guide plate 402 to the drainage tube 403, and discharged outward. Through the arrangement of the fixed frame 404 and the shielding plate 405, when a mold is full of gold melt, the shielding plate 405 can be inserted into the fixed frame 404 to close the pipe mouth of the drainage tube 403, and the next mold can be replaced. After the replacement of the next mold is completed, the shielding plate 405 is pulled out of the fixed frame 404, and the motor 511 is started to drive the bidirectional screw 503 to rotate, so that the two sliders 505 slide close to each other on the bidirectional screw 503 and in the slide groove 504. When the two sliders 505 move close to each other, the two double-ring rods 507 are driven to rotate on the shaft column 1 506 and the shaft column 2 508 respectively, resulting in an angle change, and the mold placement plate 510 is pushed longitudinally, so as to adjust the height of the mold placement plate 510.

[0032] The above shows and describes the basic principle, main features and advantages of the utility model. Those skilled in the art should understand that the utility model is not limited by the above embodiments. The above embodiments and the specification only describe the principles of the utility model. The utility model may be subject to various changes and improvements without departing from the spirit and scope of the utility model. These changes and improvements fall within the scope of the utility model to be protected. The scope of protection claimed by the utility model is defined by the attached claims and their equivalents.

Claims

1. A hot melt material extraction device for gold processing, comprising a workbench (1) and a crucible (3), characterized in that: The top of the workbench (1) is provided with an auxiliary mechanism (2) for turning the crucible (3) in a circle, and the crucible (3) is arranged on the auxiliary mechanism (2). The top of the workbench (1) is provided with a drainage mechanism (4) for receiving and guiding the gold melt poured from the crucible (3). A lifting mechanism (5) for adjusting the height is arranged on one side of the workbench (1). The auxiliary mechanism (2) comprises two rectangular plates (201), which are mounted on the top of the workbench (1). A cross column (201) is rotatably mounted on each of the two rectangular plates (201). 02), and the crucible (3) is installed between two cross pillars (202), a gear (209) is installed on the side of the two cross pillars (202) away from the rectangular plate (201), a fixed plate (206) is installed on the side of the two rectangular plates (201) away from each other, a fixed rod (207) is slidably installed in the two fixed plates (206), a rack (208) is installed on the top of the two fixed rods (207), the rack (208) is slidably set on the top surface of the fixed plate (206), and the rack (208) is meshed with the gear (209).

2. A hot-melt material extraction device for gold processing according to claim 1, characterized in that: The auxiliary mechanism (2) also includes a support plate (203), the support plate (203) is installed on the top of the workbench (1), a cylinder (204) is installed on the right side of the support plate (203), a connecting rod (205) is installed on the right side of the cylinder (204), and two fixing rods (207) are installed on the right side of the connecting rod (205).

3. A hot-melt material extraction device for gold processing according to claim 1, characterized in that: The drainage mechanism (4) comprises a rectangular shell (401), the rectangular shell (401) is installed on the top of the workbench (1), a guide plate (402) is installed on the inner wall of the rectangular shell (401), and a drainage pipe (403) is installed on the right side of the rectangular shell (401).

4. A hot-melt material extraction device for gold processing according to claim 3, characterized in that: A fixing frame (404) is installed on the right side of the drainage tube (403), and a shielding plate (405) is slidably installed on the fixing frame (404).

5. A hot-melt material extraction device for gold processing according to claim 1, characterized in that: The lifting mechanism (5) comprises an L-shaped plate (501), which is mounted on the top of the workbench (1); two fixed blocks (502) are mounted on the surface of the L-shaped plate (501); a bidirectional screw (503) is rotatably mounted between the two fixed blocks (502); a slide groove (504) is provided on the surface of the L-shaped plate (501); two sliders (505) are threadedly mounted on the outer wall of the bidirectional screw (503), and the sliders (505) are slidably mounted on the inner wall of the slide groove (504); a motor (511) is mounted on the rear side of the bidirectional screw (503), and the motor (511) is mounted on the surface of the L-shaped plate (501).

6. A hot-melt material extraction device for gold processing according to claim 5, characterized in that: A shaft column one (506) is installed on the two sliders (505), a double ring rod (507) is rotatably installed on the outer wall of the two shaft columns one (506), a shaft column two (508) is rotatably installed in the ring opening of the two double ring rods (507) away from the shaft column one (506), two connecting blocks (509) are installed on the two shaft columns two (508), and a mold placement plate (510) is installed on the top of the two connecting blocks (509).