Gold mine water treatment device

By designing a gold mine water treatment device with multi-volume water transfer tank and sedimentation plate, the problem of waste of gold resources during gold mining is solved, the effective recovery of gold particles and the reduction of resources is achieved, and the stability of the device in the mine is ensured. Fixed and fast operation.

CN221998982UActive Publication Date: 2024-11-15GUIZHOU GEOLOGICAL & MINERAL RESOURCES DEVELOPMENT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420621473.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-28
Publication Date
2024-11-15
Estimated Expiration
2034-03-28

AI Technical Summary

Technical Problem

During gold mining, dust and aquifers generated by blasting lead to a large amount of water. Direct discharge of mine water will cause waste of gold resources and fail to effectively recover gold particles.

Method used

A gold mine water treatment device is designed, including multiple water transfer tanks and sedimentation plates of different volumes. The gold particles are collected through the sedimentation grooves on the sedimentation plates, and the side positioning sheets and the lower positioning sheets are fixed in the mine. In the canal, ensure the slowdown of water flow and the precipitation and recovery of gold particles of different mass.

Benefits of technology

It effectively reduces the waste of gold resources during gold mining, realizes the recycling of gold particles of different quality, and improves the recycling efficiency of gold particles through the convenient sedimentation plate removal process, ensuring the stable position of the device.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN221998982U_ABST
    Figure CN221998982U_ABST
Patent Text Reader

Abstract

The utility model provides a gold mine water treatment device, which comprises a water delivery tank, a plurality of water delivery tanks with different volumes are arranged in the water delivery tank, and gold mine water can flow in the plurality of water delivery tanks with different volumes; and the multiple precipitation plates are arranged in the water conveying grooves with the different volumes in a clamped mode, and precipitation grooves are formed in the precipitation plates and used for collecting gold particles in mine water. The precipitation plate is arranged in the water conveying tank, the precipitation tank is arranged in the precipitation plate, and the volumes of the water conveying tank and the precipitation plate are sequentially increased, so that the water flow speed in the precipitation plate is sequentially reduced, and the precipitation tank can be used for precipitating gold particles with different masses, so that the gold particles with different masses are recycled; therefore, waste of gold resources in the gold mining process is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model belongs to the field of gold mine water treatment, and in particular relates to a gold mine water treatment device. Background Art

[0002] In the process of gold mining, the method adopted is to use low-cost blasting to mine. Since blasting will generate a lot of dust, water dust reduction is often used. In addition, there may be aquifers in the ore deposit, which often leads to a large amount of water in the process of gold mining. In order to drain water, a water channel will be set in the mine, and the mine water will be collected and pumped out of the mine through a water pump. Because the gold mine water usually contains a large amount of gold particles, the gold particles are of high value. If they are directly pumped out of the mine and discharged, it will cause a waste of resources. To this end, the utility model provides a gold mine water treatment device to realize the recovery of gold particles in the mine water, thereby reducing the waste of gold resources in the gold mining process. Utility Model Content

[0003] The utility model provides a gold mine water treatment device to recover gold particles in the gold mine water, thereby reducing the waste of gold resources in the gold mining process. The specific scheme is as follows:

[0004] A gold mine water treatment device, comprising:

[0005] A water delivery box, wherein a plurality of water delivery troughs of different volumes are arranged in the water delivery box, and the gold mine water can flow in the plurality of water delivery troughs of different volumes;

[0006] There are multiple sedimentation plates, which are respectively engaged in water delivery troughs of different volumes. A sedimentation trough is arranged in the sedimentation plate to collect gold particles in the mine water.

[0007] Furthermore, the water trough includes a first water trough, a second water trough, a third water trough, and a fourth water trough, and the volumes of the first water trough, the second water trough, the third water trough, and the fourth water trough increase successively. A protrusion is provided on the water box, and the protrusion is respectively provided on the edge of the first water trough, the second water trough, the third water trough, and the fourth water trough, and each sedimentation plate is respectively engaged and connected with the first water trough, the second water trough, the third water trough, and the fourth water trough through the protrusion.

[0008] Furthermore, the sedimentation plate includes a first sedimentation plate, a second sedimentation plate, a third sedimentation plate, and a fourth sedimentation plate, the volumes of which increase successively, and the first sedimentation plate, the second sedimentation plate, the third sedimentation plate, and the fourth sedimentation plate are respectively provided with a first sedimentation trough, a second sedimentation trough, a third sedimentation trough, and a fourth sedimentation trough for precipitating gold particles, and the first sedimentation plate, the second sedimentation plate, the third sedimentation plate, and the fourth sedimentation plate are provided with grooves that are engaged with the protrusions.

[0009] Furthermore, there are a plurality of the first sedimentation tank, the second sedimentation tank, the third sedimentation tank, and the fourth sedimentation tank, which are respectively arranged in the first sedimentation plate, the second sedimentation plate, the third sedimentation plate, and the fourth sedimentation plate.

[0010] Furthermore, the first sedimentation plate, the second sedimentation plate, the third sedimentation plate and the fourth sedimentation plate are respectively provided with handles for lifting the first sedimentation plate, the second sedimentation plate, the third sedimentation plate and the fourth sedimentation plate.

[0011] Furthermore, the water delivery box is provided with a plurality of side positioning pieces, and the side positioning pieces can be engaged in the water delivery channel in the gold mine, so as to fix the position of the water delivery box.

[0012] Furthermore, a lower positioning piece is provided at the lower part of the water delivery box, and the lower positioning piece can be engaged in the water delivery channel in the gold mine.

[0013] The beneficial effects of the utility model are:

[0014] 1. By setting a sedimentation plate in the water trough and a sedimentation trough in the sedimentation plate, the volumes of the water trough and the sedimentation plate are increased successively, so that the water flow speed in the sedimentation plate is slowed down successively, and the sedimentation trough can precipitate gold particles of different qualities, so as to recycle gold particles of different qualities, thereby reducing the waste of gold resources in the gold mining process.

[0015] 2. By engaging the sedimentation plate with the water trough, when the sedimentation plate needs to be removed, the sedimentation plate can be removed by simply holding the handle, thereby making it convenient and quick to remove the sedimentation plate and facilitating the recovery of gold particles.

[0016] 3. By providing the side positioning pieces and the bottom positioning pieces, the water delivery box can be engaged in the water delivery channel in the mine, so that the position of the water delivery box is fixed and not easy to move. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 The overall structural diagram of a gold mine water treatment device is shown in FIG.

[0018] Figure 2 for Figure 1 Explosion diagram of

[0019] Figure 3 This is a schematic diagram of the bottom structure of the water tank;

[0020] Figure 4 for Figure 2 A local enlarged schematic diagram of the middle A;

[0021] Figure 5 for Figure 2 A local enlarged schematic diagram of point B in the middle.

[0022] In the figure: 10, water delivery box; 11, first water delivery trough; 12, second water delivery trough; 121, second card slot; 13, third water delivery trough; 14, fourth water delivery trough; 15, water outlet; 16, side positioning piece; 17, lower positioning piece; 18, protrusion; 20, first sedimentation plate; 21, first sedimentation trough; 30, second sedimentation plate; 31, second sedimentation trough; 40, third sedimentation plate; 41, third sedimentation trough; 50, fourth sedimentation plate; 51, fourth sedimentation trough; 60, groove; 70, handle. DETAILED DESCRIPTION

[0023] The technical solutions in the embodiments of the present invention will be described clearly and completely below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments.

[0024] like Figure 1 , Figure 2 As shown, the utility model provides a gold mine water treatment device, comprising:

[0025] A water delivery box 10 is provided with a plurality of water delivery troughs of different volumes, and gold mine water can flow in the plurality of water delivery troughs of different volumes; a sedimentation plate is provided, and a plurality of sedimentation plates are respectively engaged in water delivery troughs of different volumes, and a sedimentation trough is provided in the sedimentation plate for collecting gold particles in the mine water.

[0026] like Figure 1 , Figure 2 , Figure 4 As shown, in the above embodiment, the water trough includes a first water trough 11, a second water trough 12, a third water trough 13, and a fourth water trough 14. The volumes of the first water trough 11, the second water trough 12, the third water trough 13, and the fourth water trough 14 increase successively. A protrusion 18 is provided on the water box 10. The protrusion 18 is respectively provided on the edge of the first water trough 11, the second water trough 12, the third water trough 13, and the fourth water trough 14. Each sedimentation plate is respectively engaged and connected with the first water trough 11, the second water trough 12, the third water trough 13, and the fourth water trough 14 through the protrusion 18.

[0027] like Figure 1 , Figure 2 , Figure 4 , Figure 5 As shown, in the above embodiment, the sedimentation plate includes a first sedimentation plate 20, a second sedimentation plate 30, a third sedimentation plate 40, and a fourth sedimentation plate 50, which are successively increased in volume. The first sedimentation plate 20, the second sedimentation plate 30, the third sedimentation plate 40, and the fourth sedimentation plate 50 are respectively provided with a first sedimentation tank 21, a second sedimentation tank 31, a third sedimentation tank 41, and a fourth sedimentation tank 51 for precipitating gold particles. The first sedimentation plate 20, the second sedimentation plate 30, the third sedimentation plate 40, and the fourth sedimentation plate 50 are provided with a groove 60 that is engaged and connected with the protrusion 18. There are a plurality of the first sedimentation tank 21, the second sedimentation tank 31, the third sedimentation tank 41, and the fourth sedimentation tank 51, which are respectively arranged in the first sedimentation plate 20, the second sedimentation plate 30, the third sedimentation plate 40, and the fourth sedimentation plate 50. The first sedimentation plate 20, the second sedimentation plate 30, the third sedimentation plate 40, and the fourth sedimentation plate 50 are respectively provided with a handle for lifting the first sedimentation plate 20, the second sedimentation plate 30, the third sedimentation plate 40, and the fourth sedimentation plate 50.

[0028] like Figure 2 , Figure 3 As shown, the water delivery box 10 is provided with a plurality of side positioning pieces 16, which can be engaged in the water delivery channel in the gold mine, thereby fixing the position of the water delivery box 10. Figure 3 As shown, a lower positioning piece 17 is provided at the lower part of the water delivery box 10, and the lower positioning piece 17 can be engaged in the water delivery channel in the gold mine.

[0029] The working principle of the utility model is:

[0030] Each sedimentation plate is correspondingly engaged in the conveying trough, and then the side positioning pieces and the lower positioning pieces are engaged in the water delivery channel in the mine, so that the water delivery box is located in the water delivery channel, and the edge part of the water delivery box is sealed so that the water delivery box fits tightly in the water delivery channel. The water in the water delivery channel flows in from the first sedimentation plate, and then flows out from the water outlet after passing through the second sedimentation plate, the third sedimentation plate, and the fourth sedimentation plate. As the volumes of the first sedimentation plate flow, the second sedimentation plate, the third sedimentation plate, and the fourth sedimentation plate increase successively, and the water flow decreases successively, gold particles of different masses will fall into the sedimentation tanks corresponding to different sedimentation plates. After a certain period of collection, each sedimentation plate can be taken out by holding the handle, and the gold particles can be taken out from the sedimentation tank to realize the collection of the gold particles.

[0031] In the above, multiple mine water treatment devices can be set up in the water delivery channel to achieve more complete recovery of gold particles in the gold mine water. During the use of this device, since the mine water may contain rock particles, a certain amount of rock particles may also be collected in the sedimentation tank. To address this problem, the sedimentation plate can be removed later, and the gold particles and rock particles can be further screened to achieve the extraction and storage of gold particles.

[0032] In the above, by setting a sedimentation plate in the water trough, and setting a sedimentation trough in the sedimentation plate, the volumes of the water trough and the sedimentation plate are increased successively, so that the water flow speed in the sedimentation plate is slowed down successively, and the sedimentation trough can precipitate gold particles of different qualities, so as to recycle gold particles of different qualities, thereby reducing the waste of gold resources in the gold mining process. By engaging the sedimentation plate with the water trough, when it is necessary to remove the sedimentation plate, the sedimentation plate can be removed by simply holding the handle, thereby facilitating the removal of the sedimentation plate and facilitating the recovery of gold particles. By arranging the side positioning piece and the bottom positioning piece, the water delivery box can be engaged in the water delivery channel in the mine, so that the position of the water delivery box is fixed and not easy to move.

[0033] It is obvious to those skilled in the art that the present invention is not limited to the details of the exemplary embodiments described above, and that the present invention can be implemented in other specific forms without departing from the spirit or basic features of the present invention. Therefore, no matter from which point of view, the embodiments should be regarded as exemplary and non-restrictive, and the scope of the present invention is defined by the appended claims rather than the above description, and it is intended that all changes falling within the meaning and scope of the equivalent elements of the claims are included in the present invention.

Claims

1. A gold mine water treatment device, It is characterized in that include: A water delivery box (10), wherein a plurality of water delivery troughs of different volumes are arranged in the water delivery box (10), and gold mine water can flow in the plurality of water delivery troughs of different volumes; There are multiple sedimentation plates, which are respectively engaged in water delivery troughs of different volumes. A sedimentation trough is arranged in the sedimentation plate to collect gold particles in the mine water.

2. A gold mine water treatment device according to claim 1, It is characterized in that The water delivery trough comprises a first water delivery trough (11), a second delivery trough (12), a third water delivery trough (13), and a fourth water delivery trough (14); the volumes of the first water delivery trough (11), the second delivery trough (12), the third water delivery trough (13), and the fourth water delivery trough (14) are increased in sequence; a protrusion (18) is provided on the water delivery box (10); the protrusion (18) is respectively provided on the edge of the first water delivery trough (11), the second delivery trough (12), the third water delivery trough (13), and the fourth water delivery trough (14); and each sedimentation plate is respectively connected to the first water delivery trough (11), the second delivery trough (12), the third water delivery trough (13), and the fourth water delivery trough (14) by snapping together through the protrusion (18).

3. A gold mine water treatment device according to claim 2, It is characterized in that The sedimentation plate comprises a first sedimentation plate (20), a second sedimentation plate (30), a third sedimentation plate (40), and a fourth sedimentation plate (50) whose volumes increase in sequence. The first sedimentation plate (20), the second sedimentation plate (30), the third sedimentation plate (40), and the fourth sedimentation plate (50) are respectively provided with a first sedimentation trough (21), a second sedimentation trough (31), a third sedimentation trough (41), and a fourth sedimentation trough (51) for precipitating gold particles. The first sedimentation plate (20), the second sedimentation plate (30), the third sedimentation plate (40), and the fourth sedimentation plate (50) are provided with a groove (60) which is engaged with the protrusion (18).

4. A gold mine water treatment device according to claim 3, It is characterized in that There are a plurality of the first sedimentation tank (21), the second sedimentation tank (31), the third sedimentation tank (41), and the fourth sedimentation tank (51), which are respectively arranged in the first sedimentation plate (20), the second sedimentation plate (30), the third sedimentation plate (40), and the fourth sedimentation plate (50).

5. A gold mine water treatment device according to claim 4, It is characterized in that The first sedimentation plate (20), the second sedimentation plate (30), the third sedimentation plate (40), and the fourth sedimentation plate (50) are respectively provided with handles for lifting the first sedimentation plate (20), the second sedimentation plate (30), the third sedimentation plate (40), and the fourth sedimentation plate (50).

6. A gold mine water treatment device according to claim 5, It is characterized in that The water delivery box (10) is provided with a plurality of side positioning pieces (16), and the side positioning pieces (16) can be engaged in a water delivery channel in a gold mine, thereby fixing the position of the water delivery box (10).

7. A gold mine water treatment device according to claim 6, It is characterized in that A lower positioning piece (17) is provided at the lower part of the water delivery box (10), and the lower positioning piece (17) can be engaged in a water delivery channel in a gold mine.