Cantilever reinforcing structure of steel bar truss floor support plate

By welding the long ribs on the steel bar truss bearing plate and connecting them with the removable snap buckle with the cable-stayed wire rope, the complex problem of supporting reinforcement at the cantilever position is solved, and the construction is simplified, reducing costs and improving structural strength is achieved.

CN222025311UActive Publication Date: 2024-11-19YANJIAN GRP CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202323579334.2
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2023-12-27
Publication Date
2024-11-19
Estimated Expiration
2033-12-27

AI Technical Summary

Technical Problem

In the construction of steel bar truss bearing plates, the support reinforcement method at the cantilever position is complex and has a long cycle, which leads to an increase in construction costs and affects efficiency.

Method used

The cable-stayed wire rope is connected between the steel bar truss bearing plate and the upper steel beam and the edge mold, and is connected to the upper steel beam through detachable snaps to achieve tension and reinforcement in the cantilever position and simplify the construction process.

Benefits of technology

Simplifies construction processes, saves time, reduces costs, improves production efficiency, and enhances structural safety and strength in cantilevered positions.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222025311U_ABST
    Figure CN222025311U_ABST
Patent Text Reader

Abstract

The utility model discloses a steel bar truss floor support plate cantilever reinforcing structure, which comprises a lower steel beam, a steel bar truss floor support plate fixedly arranged at the upper part of the lower steel beam and an upper steel beam, and a side mold is arranged at the outer end of the steel bar truss floor support plate. A plurality of evenly-distributed cable-stayed steel wire ropes are movably connected between the through long rib and the upper steel beam, the lower end of each cable-stayed steel wire rope is connected with the through long rib through a floor support plate hanging ring, and the upper end of each cable-stayed steel wire rope inclines inwards and is detachably connected with the upper steel beam through a small hanging ring and a detachable buckle.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to a cantilever reinforcement structure of a steel bar truss floor deck, belonging to the technical field of building construction. Background Art

[0002] With the promotion and strengthening of prefabricated steel structures, the requirements for construction efficiency are getting higher and higher. During the construction of steel truss floor decks, the steel truss floor decks are laid parallel to the steel beams and have cantilevers. The cantilevered positions need to be supported and reinforced so that the floor slabs do not sag after concrete pouring, meeting the construction requirements. At present, the method of supporting and reinforcing the cantilevered positions of steel truss floor decks is to use steel pipe racks for support. Because there is no corresponding steel pipe rack support directly below most cantilevered positions, this method has a complicated process and a relatively long cycle, and the material processing and secondary transportation increase the construction cost. Utility Model Content

[0003] The utility model aims to overcome the above-mentioned shortcomings of the prior art and provide a cantilever reinforcement structure of a steel bar truss floor deck.

[0004] The technical solution provided by the utility model is as follows: a cantilever reinforcement structure of a steel bar truss floor deck, which includes a lower steel beam, a steel bar truss floor deck fixedly installed on the upper part of the lower steel beam, and an upper steel beam, the outer end of the steel bar truss floor deck is provided with a side form, and it is characterized in that the steel bar truss floor deck is connected with a through-length reinforcement at a distance of 250-350mm from the side form, and a plurality of evenly distributed inclined steel wire ropes are movably connected between the through-length reinforcement and the upper steel beam, the lower end of each inclined steel wire rope is connected to the through-length reinforcement through a floor deck lifting ring, and the upper end of each inclined steel wire rope is inclined inwardly and is detachably connected to the upper steel beam through a small lifting ring and a detachable buckle.

[0005] Furthermore, the inclination angle α of the inclined steel wire rope is 55°-65°.

[0006] Furthermore, the inclination angle α of the inclined steel wire rope is 60°.

[0007] Furthermore, the detachable buckle includes a U-shaped buckle and a fastening bolt threadedly connected to the U-shaped buckle.

[0008] Furthermore, the distance H between the through-length ribs and the side mold is 300 mm.

[0009] The beneficial effects of the utility model are as follows: the steel truss floor deck of the utility model is welded with a through-length reinforcement 250-350mm (preferably 300mm) away from the side formwork, and the through-length reinforcement and the upper steel beam are fixedly connected by a detachable buckle, a floor deck lifting ring, a small lifting ring and a bolt to connect the evenly distributed inclined steel wire rope with the upper end tilted inward, and the inclined angle of the inclined steel wire rope is 55°-65° (preferably 60°), and the detachable buckle 7 adopts a U-shaped fastening bolt buckle. The utility model can be installed together with the steel beam, and the construction of the cantilever position of the steel truss floor deck is simple, saving construction time, reducing construction costs, and improving production efficiency. At the same time, it is conducive to the permanent strengthening of the floor slab strength at the cantilever position and strengthening the structural safety of the cantilever position. BRIEF DESCRIPTION OF THE DRAWINGS

[0010] Figure 1 It is a schematic diagram of the structure of the utility model;

[0011] Figure 2 It is a side view of the utility model;

[0012] Figure 3 It is a structural schematic diagram of the detachable buckle of the utility model.

[0013] In the figure: 1. Lower steel beam; 2. Steel truss floor deck; 3. Through-length reinforcement; 4. Side formwork; 5. Floor deck lifting ring; 6. Inclined steel wire rope; 7. Removable buckle; 8. Upper steel beam; 9. Small lifting ring. DETAILED DESCRIPTION

[0014] The specific implementation of the utility model is described in detail below with reference to the accompanying drawings:

[0015] like Figure 1 , Figure 2 As shown, a cantilever reinforcement structure of a steel bar truss floor deck comprises a lower steel beam 1, a steel bar truss floor deck 2 fixedly mounted on the upper part of the lower steel beam 1, and an upper steel beam 8. The outer end of the steel bar truss floor deck 2 is provided with a side formwork 4. A through-length reinforcement 3 is welded and fixed to the steel bar truss floor deck 2. The distance H between the through-length reinforcement 3 and the side formwork 4 is 250-350mm (preferably 300mm). The through-length reinforcement 3 is connected to a number of evenly distributed floor deck lifting rings 5. Each floor deck lifting ring 5 is connected to the lower end of an inclined steel wire rope 6. The upper end of each inclined steel wire rope 6 is connected to a small lifting ring 9. Each small lifting ring 9 is connected to a detachable buckle 7. The detachable buckle 7 is detachably connected to the upper steel beam 8. The upper end of the inclined steel wire rope 6 is inclined inwardly, and the inclination angle α is 55°-65° (preferably 60°). As shown Figure 3 As shown, the detachable buckle 7 includes a U-shaped buckle 10 and a fastening bolt 11 threadedly connected to the U-shaped buckle 10 .

[0016] During construction, after the steel truss floor decking slab 2 is installed, it will be welded and fixed to the steel truss floor decking slab 2 at a distance of 250-350mm from the side formwork 4, and several floor decking slab lifting rings 5 ​​will be welded and fixed to the through-length reinforcement 3. Then, one end of several inclined steel wire ropes 6 with the same number as the floor decking slab lifting ring 5 will be connected to the floor decking slab lifting ring 5, and the other end of the inclined steel wire rope 6 will be connected to the detachable buckle 7 through a small lifting ring 9. Finally, the detachable buckle 7 will be clamped on the upper steel beam 8, and the fastening bolts 11 will be tightened to realize the bracing and reinforcement of the overall cantilever of the steel truss floor decking slab.

[0017] It should be understood that the parts not elaborated in detail in this specification belong to the prior art. The above embodiments are only descriptions of the preferred implementation methods of the utility model, and are not intended to limit the scope of the utility model. Without departing from the design spirit of the utility model, various modifications and improvements made by ordinary engineers and technicians in this field to the technical solution of the utility model should fall within the protection scope determined by the claims of the utility model.

Claims

1. A cantilever reinforcement structure of a steel truss floor deck, comprising a lower steel beam, a steel truss floor deck fixedly installed on the upper part of the lower steel beam, and an upper steel beam, wherein the outer end of the steel truss floor deck is provided with a side form, characterized in that The steel truss floor decking is connected with a through-length reinforcement at a distance of 250-350mm from the side formwork. A number of evenly distributed inclined steel wire ropes are movably connected between the through-length reinforcement and the upper steel beam. The lower end of each inclined steel wire rope is connected to the through-length reinforcement through a floor decking lifting ring. The upper end of each inclined steel wire rope is inclined inward and is detachably connected to the upper steel beam through a small lifting ring and a detachable buckle.

2. A reinforced steel truss floor deck cantilever reinforcement structure according to claim 1, characterized in that The inclination angle α of the inclined steel wire rope is 55°-65°.

3. A reinforced steel truss floor deck cantilever reinforcement structure according to claim 2, characterized in that The inclination angle α of the inclined steel wire rope is 60°.

4. The cantilever reinforcement structure of a steel truss floor deck according to claim 1 is characterized in that The detachable buckle comprises a U-shaped buckle and a fastening bolt threadedly connected to the U-shaped buckle.

5. The cantilever reinforcement structure of a steel truss floor deck according to claim 1 is characterized in that The distance H between the through-length ribs and the side mold is 300 mm.