Guide pipe type grouting structure for vertical shaft

The pipe-induced grouting structure solves the problems of difficulty and leakage risks of conventional grouting construction by drilling consolidated grouting holes and fixed contact grouting annular PE pipes in the vertical shaft, and achieves the convenience and quality assurance of construction.

CN222045759UActive Publication Date: 2024-11-22POWERCHINA HUADONG ENG CORP LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420567283.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-03-22
Publication Date
2024-11-22
Estimated Expiration
2034-03-22

AI Technical Summary

Technical Problem

In the vertical shaft structure, conventional grouting construction is difficult, drilling and sealing has a risk of leakage, and it affects the main concrete pouring construction. Especially in overseas projects, the timing problems are complicated, resulting in inconvenient construction and long time.

Method used

Adopt the pipe-induced grouting structure, and drill the solid grout holes along the well from bottom to top through the initial spray concrete, and fix the contact grouting ring PE pipe on the surface. Grouting is done using PE pipes, cancel the grouting platform setting, and reduce the pouring of concrete. Influence.

Benefits of technology

The convenience and speed of construction are achieved, the risk of water leakage is avoided, the construction time is shortened, and the construction quality is ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222045759U_ABST
    Figure CN222045759U_ABST
Patent Text Reader

Abstract

The utility model provides a guide pipe type grouting structure for a vertical shaft, which comprises primarily sprayed concrete, a plurality of rows of consolidation grouting holes are drilled in the primarily sprayed concrete along the vertical shaft from bottom to top, and grouting guide-out PE pipes are arranged at orifices of the consolidation grouting holes; a plurality of contact grouting annular PE pipes are fixed on the surface of the primary spraying concrete along the vertical shaft from bottom to top, each contact grouting annular PE pipe is communicated with at least one grout inlet PE pipe and at least one grout outlet PE pipe, a plurality of contact grouting holes are formed in the contact grouting annular PE pipes, and the contact grouting holes are sealed by PVC adhesive tapes. The influence of consolidation grouting and concrete pouring construction of the vertical shaft is reduced through the pre-buried guide pipe system, contact grouting basically does not influence concrete pouring, construction is rapid and convenient, and the risk of water leakage easily occurring after lining tapping and plugging is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the field of concrete and grouting construction, in particular to a pipe-leading grouting structure for a vertical shaft. Background Art

[0002] In the shaft structure of the water supply system, especially the surge tank structure, consolidation grouting and contact grouting of the surrounding rock of the shaft are generally required. Especially for overseas projects, contact grouting between the initial shotcrete and the structural concrete is necessary. Due to the need to consider the timing of grouting, the consolidation grouting of the surrounding rock with cover weight needs to wait until the strength of the concrete structure reaches at least 70% (usually 7 days), and the contact grouting needs to be carried out at least 28 days after the concrete is poured. Conventional practices usually require the setting of drilling construction and grouting platforms. After the concrete of the grouting section is poured, when the strength reaches the specified requirements, the concrete lining of the warehouse is drilled or the embedded pipe is used to drill to the designed depth, and then the surrounding rock behind the lining is grouted. This conventional design requires a separate set of grouting platforms to be prepared, and the grouting platform is gradually lifted as the concrete is poured to complete the grouting of the entire shaft.

[0003] In view of the problems of greater construction difficulty in conventional schemes, leakage risk in drilling and plugging construction, and operational impact on the main concrete pouring construction, this scheme adopts a guide pipe design. Since there are more guide pipes for consolidation grouting, they can be led to the slipform platform for concrete pouring construction. For contact grouting, there are fewer guide pipes and they can be led out of the wellhead at one time. In the case of concrete cover weight, the grouting operation platform is cancelled, which reduces the impact of grouting operations on the main concrete pouring construction, ensures construction convenience, shortens construction operation time, and can ensure construction quality. Utility Model Content

[0004] The main purpose of the utility model is to provide a pipe-leading grouting structure for a vertical shaft, and it is expected to effectively solve the problems in the background technology.

[0005] In order to achieve the above purpose, the utility model adopts the following technical solutions:

[0006] A pipe-lead grouting structure for a vertical shaft comprises primary shotcrete, and is characterized in that: the primary shotcrete is drilled with multiple rows of consolidation grouting holes from bottom to top along the vertical shaft, and a grouting lead-out PE pipe is provided at the orifice of the consolidation grouting hole; multiple contact grouting annular PE pipes are fixed on the surface of the primary shotcrete from bottom to top along the vertical shaft, each contact grouting annular PE pipe is connected with at least one grouting inlet PE pipe and at least one grouting outlet PE pipe, and multiple contact grouting holes are provided on the contact grouting annular PE pipe, and the contact grouting holes are sealed with PVC tape.

[0007] While adopting the above technical solutions, the present invention can also adopt or combine the following technical solutions:

[0008] As a preferred technical solution of the utility model: quick-drying cement is arranged in the gap between the consolidation grouting hole and the grouting outlet PE pipe.

[0009] As a preferred technical solution of the utility model: the upper end opening of the grouting outlet PE pipe is slightly higher than the upper surface of the concrete well lining to be poured in the current cycle.

[0010] As a preferred technical solution of the utility model: the contact grouting annular PE pipe is fixed to the surface of the primary sprayed concrete through iron sheet hoops and rivets.

[0011] As a preferred technical solution of the utility model: the contact grouting holes on the contact grouting annular PE pipe are arranged at equal intervals.

[0012] As a preferred technical solution of the utility model: the slurry inlet pipes on different contact grouting annular PE pipes are staggered.

[0013] As a preferred technical solution of the utility model: the slurry outlet pipes on different contact grouting annular PE pipes are arranged in a staggered manner.

[0014] The utility model provides a guide pipe type grouting structure for a vertical shaft, which has the following beneficial effects: the influence of the consolidation grouting and concrete pouring construction of the vertical shaft is reduced by the pre-buried guide pipe system, and the contact grouting basically has no mutual influence with the concrete pouring, and the construction is fast and convenient, and there is no risk of water leakage that is easy to occur after the lining opening is sealed. BRIEF DESCRIPTION OF THE DRAWINGS

[0015] Figure 1 It is a layout diagram of consolidation grouting in the pipe-type grouting structure for a vertical shaft provided by the utility model;

[0016] Figure 2 for Figure 1 Middle AA section;

[0017] Figure 3 for Figure 1 A magnified image of the middle A area;

[0018] Figure 4 This is a stereogram of consolidation grouting;

[0019] Figure 5 It is a layout diagram of contact grouting in the guide pipe type grouting structure for a vertical shaft provided by the utility model;

[0020] Figure 6 for Figure 5 Middle BB section;

[0021] Figure 7 for Figure 6Enlarged view of area B;

[0022] Figure 8 A stereogram of contact grouting;

[0023] Fig. 9 This is the fixing detail drawing of the contact grouting annular PE pipe;

[0024] Fig.10 for Fig. 9 Cross-sectional view in the mid-CC direction;

[0025] In the figure: 1-consolidation grouting hole; 2-grouting outlet PE pipe; 3-concrete well lining; 4-primary shotcrete; 5-quick-drying cement; 6-previous cycle concrete pouring surface; 7-next cycle concrete pouring surface; 8-contact grouting annular PE pipe; 9-slurry inlet PE pipe; 10-slurry outlet PE pipe; 11-contact grouting hole; 12-iron sheet hoop; 13-rivet. DETAILED DESCRIPTION

[0026] The present invention will be further described in detail with reference to the accompanying drawings and specific embodiments.

[0027] like Figure 1-10 As shown, a pipe-type grouting structure for a vertical shaft comprises a primary shotcrete 4, wherein a plurality of rows of consolidation grouting holes 1 are drilled from bottom to top along the vertical shaft, and a grouting outlet PE pipe 2 is provided at the orifice of the consolidation grouting hole 1; a plurality of contact grouting annular PE pipes 8 are fixed on the surface of the primary shotcrete 4 from bottom to top along the vertical shaft, wherein each contact grouting annular PE pipe 8 is connected with at least one grouting inlet PE pipe 9 and at least one grouting outlet PE pipe 10, and a plurality of contact grouting holes 11 are provided on the contact grouting annular PE pipe 8, and the contact grouting holes 11 are sealed with PVC tape.

[0028] The space between the consolidation grouting hole 1 and the grouting outlet PE pipe 2 is provided with quick-drying cement 5 .

[0029] The upper end opening of the grouting outlet PE pipe 2 is slightly higher than the upper surface of the concrete well lining to be poured in the current cycle.

[0030] The contact grouting annular PE pipe 8 is fixed to the surface of the primary sprayed concrete 4 via an iron sheet hoop 12 and rivets 13 .

[0031] The contact grouting holes 11 on the contact grouting annular PE pipe 8 are arranged at equal intervals.

[0032] The slurry inlet pipes 9 on the different contact grouting annular PE pipes 8 are arranged in a staggered manner; the slurry outlet pipes 10 on the different contact grouting annular PE pipes 8 are arranged in a staggered manner.

[0033] Specifically, the above-mentioned pipe-type grouting structure for the vertical shaft is implemented in the following manner:

[0034] Consolidation Grouting:

[0035] 1) Using the slipform platform for well body concrete construction, drill 1 consolidation grouting hole at each cycle elevation;

[0036] 2) Install the grouting lead-out PE pipe 2 and lead the vertical pipe to the next cycle concrete pouring surface 7;

[0037] 3) Use quick-drying cement 5 to seal the gaps around the drill hole;

[0038] 4) pouring the cycle concrete well lining 3, and before pouring the next cycle concrete well lining 3, after the cycle concrete has reached the design requirements, grouting operation is performed using a concrete slipform platform;

[0039] 5) The grouting equipment is arranged outside the wellhead and connected to the pipe opening of the grouting outlet PE pipe 2, and the consolidation grouting is performed according to the designed pressure.

[0040] Contact Grouting:

[0041] 1) While constructing a certain cycle consolidation grouting, a contact grouting annular PE pipe 8 is installed synchronously using a concrete slipform platform and fixed by an iron sheet hoop 12, which is fixed to the primary sprayed concrete 4 by rivets 13;

[0042] 2) Contact grouting: The contact grouting holes 11 are arranged at equal intervals along the annular PE pipe 8 and sealed with PVC tape;

[0043] 3) Setting the slurry inlet pipe 9 and the slurry outlet pipe 10 outside the wellbore (the slurry inlet pipes 9 on different contact grouting annular PE pipes 8 are staggered, and the slurry outlet pipes 10 on different contact grouting annular PE pipes 8 are staggered to avoid pipeline concentration);

[0044] 4) After the concrete well lining 3 is completely poured and reaches the designed strength, a grouting device is used outside the well to connect the grouting inlet pipe and the grouting outlet pipe to carry out contact grouting. The pressure will break the PVC tape to fill the gap between the initial shotcrete 4 and the concrete well lining 3.

[0045] The above-mentioned specific implementation methods are used to explain the present invention and are only preferred embodiments of the present invention, rather than limiting the present invention. Any modifications, equivalent substitutions, improvements, etc. made to the present invention within the spirit of the present invention and the protection scope of the claims shall fall within the protection scope of the present invention.

Claims

1. A pipe-type grouting structure for a vertical shaft, comprising primary shotcrete (4), characterized in that: The primary shotcrete (4) is drilled along the vertical shaft from bottom to top to form a plurality of rows of consolidation grouting holes (1), and a grouting outlet PE pipe (2) is provided at the opening of the consolidation grouting holes (1); A plurality of contact grouting annular PE pipes (8) are fixed on the surface of the primary shotcrete (4) from bottom to top along the vertical shaft, each contact grouting annular PE pipe (8) is connected to at least one grouting inlet PE pipe (9) and at least one grouting outlet PE pipe (10), and a plurality of contact grouting holes (11) are provided on the contact grouting annular PE pipe (8), and the contact grouting holes (11) are sealed with PVC tape.

2. The pipe-type grouting structure for a vertical shaft according to claim 1, characterized in that: Quick-drying cement (5) is arranged in the gap between the consolidation grouting hole (1) and the grouting outlet PE pipe (2).

3. The pipe-type grouting structure for a vertical shaft according to claim 1, characterized in that: The upper end opening of the grouting outlet PE pipe (2) is slightly higher than the upper surface of the concrete well lining to be poured in the current cycle.

4. The pipe-type grouting structure for a vertical shaft according to claim 1, characterized in that: The contact grouting annular PE pipe (8) is fixed to the surface of the primary sprayed concrete (4) via an iron sheet hoop (12) and a rivet (13).

5. The pipe-type grouting structure for a vertical shaft according to claim 1, characterized in that: The contact grouting holes (11) on the contact grouting annular PE pipe (8) are arranged at equal intervals.

6. The pipe-type grouting structure for a vertical shaft according to claim 1, characterized in that: The grout inlet pipes (9) on the different contact grouting annular PE pipes (8) are arranged in a staggered manner.

7. The pipe-type grouting structure for a vertical shaft according to claim 1, characterized in that: The slurry outlet pipes (10) on the different contact grouting annular PE pipes (8) are arranged in a staggered manner.