Ship lock flow separation wall and ship lock

By setting the first crown beam and spacer column on the top of the pile foundation of the lock partition wall, and inserting prefabricated insert plates between the columns, the problems of long construction period and inconvenient maintenance of the existing lock partition wall are solved, and the construction efficiency improvement and maintenance cost savings are achieved.

CN222594788UActive Publication Date: 2025-03-11CCCC FOURTH HARBOR ENG CO LTD +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420813481.7
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-18
Publication Date
2025-03-11
Estimated Expiration
2034-04-18

AI Technical Summary

Technical Problem

The pile foundation of the existing lock partition wall is an integral cast structure, which leads to a long construction period and is inconvenient for repair after damage.

Method used

A pile foundation is arranged at intervals. The end of the pile foundation extends into the rock layer. The first crown beam is arranged on the top. The top surface of the first crown beam is connected to multiple columns. The adjacent columns are inserted into prefabricated insert plates. The thickness of the prefabricated insert plate is less than the thickness of the columns.

Benefits of technology

It accelerates construction efficiency, shortens construction period, saves construction costs, and facilitates the replacement of damaged parts, improving the maintenance efficiency of lock flow walls.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222594788U_ABST
    Figure CN222594788U_ABST
Patent Text Reader

Abstract

The utility model relates to the technical field of components of ship locks, in particular to a ship lock flow separation wall and a ship lock. A ship lock flow separation wall comprises a plurality of pile foundations arranged at intervals, the bottom ends of the pile foundations extend into a rock stratum on the lower portion of the flow separation wall, first top beams are arranged at the tops of the pile foundations, the top faces of the first top beams are connected with a plurality of stand columns arranged at intervals, prefabricated insertion plates are connected between every two adjacent stand columns in an inserted mode, and the thickness of the prefabricated insertion plates is smaller than that of the pile foundations. The pile foundation located outside the rock stratum is a permeable area. The prefabricated inserting plates are arranged between every two adjacent stand columns, and compared with a lining which is directly poured for flow isolation, the construction efficiency can be improved. And the thickness of the prefabricated inserting plate is smaller than that of the stand column, the construction cost can be saved, and construction is convenient. And the prefabricated insertion plates are inserted between the two adjacent stand columns, so that when the prefabricated insertion plates are damaged, only the prefabricated insertion plates can be replaced, and compared with the prior art that all the prefabricated insertion plates need to be replaced, the cost is saved, and the replacement efficiency can be improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of components of a ship lock, in particular to a ship lock flow separation wall and a ship lock. Background Art

[0002] A ship lock is a hydraulic engineering facility used to overcome the water level difference between different river sections in a natural water system, allowing ships to sail smoothly between rivers with large water level differences. The basic working principle of a ship lock is similar to the principle of lifting a bucket, that is, the closed lock chamber is used to separate the space where the ship is located from the upstream and downstream, and by regulating the water level in the lock chamber, the ship is like in a huge elevator, achieving a smooth transition from the low water level area to the high water level area.

[0003] The lock includes a lock barrier wall. The lock barrier wall is an important part of the lock facility, which is mainly used to maintain the stability of the water level inside the lock and control the water flow state to ensure the safety and effectiveness of the lock operation. The lock barrier wall is mainly used to: 1. Isolate the pilot channel from the main channel water flow of the external river or lake, 2. Maintain the appropriate water depth in the pilot channel, 3. Guide the ship to travel correctly, 4. Reduce the impact of cross flow on ships, and 5. Maintain the structural stability of the entire lock.

[0004] However, the existing ship lock isolation walls are all integrally cast structures, so the construction period is long. After the isolation walls are damaged in the later stage, it is not easy to repair. Utility Model Content

[0005] The utility model aims to solve the problems in the prior art that the pile foundations of the ship lock isolation wall are all integrally cast structures, the construction period is long, and it is inconvenient to repair after damage, and provides a ship lock isolation wall and a ship lock.

[0006] In order to achieve the above purpose, the technical solution adopted by the utility model is:

[0007] A ship lock flow barrier comprises a plurality of pile foundations arranged at intervals, the lower ends of the pile foundations extend into the rock layer below the flow barrier, a first crown beam is arranged on the top of the pile foundation, a plurality of columns arranged at intervals are connected to the top surface of the first crown beam, a prefabricated plug plate is inserted between two adjacent columns, and the thickness of the prefabricated plug plate is less than the thickness of the pile foundation.

[0008] The pile foundation located outside the rock formation is a permeable area. The first capping beam is arranged at the top of the pile foundation, which can transfer the force of the column to the pile foundation more evenly, facilitating the stability of the cut-off wall. A precast insertion plate is arranged between two adjacent columns. Compared with directly pouring the lining for cut-off, it can improve the construction efficiency and shorten the construction period. Moreover, the thickness of the precast insertion plate is smaller than that of the column, which can save construction costs and is also convenient for construction. And the precast insertion plate is inserted between two adjacent columns. When the precast insertion plate is damaged, only the precast insertion plate needs to be replaced. Compared with the prior art that requires all replacements, it can save costs and improve the replacement efficiency.

[0009] As a preferred embodiment of the present utility model, a bayonet is arranged on one side of the column facing each other, and the size of the bayonet matches the size of the precast insertion plate.

[0010] The bayonet is used for clamping the precast insertion plate, which can ensure the fixation of the precast insertion plate as much as possible and is conducive to ensuring the cut-off effect of the cut-off wall.

[0011] As a preferred embodiment of the present utility model, the cross-section of the bayonet is in the shape of "匚".

[0012] As a preferred embodiment of the present utility model, a recessed component is arranged on the inner side wall of the bayonet, and a protruding component is arranged on the precast insertion plate corresponding to the recessed component on the inner wall of the bayonet.

[0013] The inner side wall of the bayonet refers to the two opposite sides of the bayonet. When a recessed component is arranged on the inner side wall of the bayonet and a protruding component is arranged correspondingly on the precast insertion plate, the positioning of the precast insertion plate when it is placed inside the bayonet can be realized.

[0014] As a preferred embodiment of the present utility model, cement mortar is poured between the bayonet and the precast insertion plate.

[0015] Grouting is arranged in the gap between the bayonet and the precast insertion plate, so that the precast insertion plate and the column are combined into one body, which is conducive to strengthening the overall stability of the component.

[0016] As a preferred embodiment of the present utility model, a second capping beam is further arranged at the top of the column.

[0017] When a second capping beam is arranged between the column and the pile foundation, the uneven settlement of the column can be avoided as much as possible, which affects the stability of the cut-off wall.

[0018] As a preferred embodiment of the present utility model, spiral bars are arranged inside the pile foundation, and the axis of the spiral bars is parallel to the axis of the pile foundation.

[0019] The spiral reinforcement inside the pile foundation can increase the compression, bending and shear resistance of the pile concrete, especially when resisting seismic loads or lateral soil pressure, which can effectively prevent the premature appearance of cracks and limit the expansion of cracks, thereby improving the integrity and bearing capacity of the pile foundation.

[0020] As a preferred solution of the utility model, the distance between two adjacent pile foundations is 2m.

[0021] A ship lock comprises a ship lock flow barrier as described above.

[0022] In summary, due to the adoption of the above technical solution, the beneficial effects of the utility model are:

[0023] 1. A ship lock flow barrier wall, which is provided with a first crown beam on the top of the pile foundation, and a plurality of columns are provided at intervals on the top surface of the first crown beam, and prefabricated plug plates are provided between the columns. Compared with the direct casting of the flow barrier lining, the efficiency of construction can be accelerated and the construction period can be shortened. The thickness of the prefabricated plug plate is less than the thickness of the column, which can save construction costs and facilitate construction. The prefabricated plug plate is plugged between two adjacent columns, so when the prefabricated plug plate is damaged, only the prefabricated plug plate can be replaced, which can save costs and improve replacement efficiency compared with the existing technology that requires all to be replaced. The ship lock flow barrier wall solves the problem that the pile foundation of the ship lock flow barrier wall in the existing technology is an integrally cast structure, the construction period is long, and it is inconvenient to repair after damage.

[0024] 2. A ship lock, which uses a ship lock flow barrier wall as described above, is conducive to shortening the construction period and is also convenient for replacement after damage, which is conducive to improving the quality of the ship lock. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 is a front view of a ship lock cutoff wall in Example 1;

[0026] Figure 2 yes Figure 1 Sectional view in the AA direction;

[0027] Figure 3 yes Figure 1 Cross-sectional view in the BB direction;

[0028] Figure 4 It is a large-scale drawing of the connection between the plug board and the end column;

[0029] Figure 5 This is a large-scale drawing of the connection between the plug-in plate and the non-end column.

[0030] Icon: 1-pile foundation, 2-column, 3-prefabricated plug plate, 4-first crown beam, 5-second crown beam, 6-bayonet. DETAILED DESCRIPTION

[0031] The utility model is described in detail below in conjunction with the accompanying drawings.

[0032] In order to make the purpose, technical solution and advantages of the utility model more clear, the utility model is further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model and are not used to limit the utility model.

[0033] In the description of the following specific embodiments, the terms indicating the orientation or position relationship such as "upper", "lower", "left", "right", "center", "inside", "outside", etc. are all based on the expression of the orientation or position relationship shown in the drawings, or the orientation or position relationship when the device / apparatus is usually used. These terms of orientation or position relationship are only for the convenience of description or simplification of the description in the specific embodiments, so that technicians can quickly understand the scheme, rather than indicating or implying that a specific device / component / element must have a specific orientation, or be constructed and operated in a specific position relationship, and therefore cannot be understood as a limitation of the present invention.

[0034] The terms "horizontal" and "vertical" and the like do not mean that the corresponding devices / components / elements are required to be absolutely horizontal or vertical or suspended, but can be slightly tilted. For example, "horizontal" only means that its direction is more horizontal than "vertical", and does not mean that the structure must be completely horizontal, but can be slightly tilted. Alternatively, it can be simplified to mean that the corresponding devices / components / elements are set in specific directions such as "horizontal" and "vertical", and can have an error / deviation of ±10% relative to the corresponding direction setting, more preferably an error / deviation within ±8%, more preferably an error / deviation within ±6%, more preferably an error / deviation within ±5%, and more preferably an error / deviation within ±4%. As long as the corresponding device / component / element is within the error / deviation range, it can still achieve its role in the solution of the utility model.

[0035] The terms “first”, “second”, “third”, etc. are merely used to distinguish the same or similar components and should not be understood as emphasizing or implying the relative importance of specific components.

[0036] The terms "set", "installed", "connected" and "connected" should be understood in a broad sense. For example, it can be a fixed connection, a detachable connection, or an integral connection. It can be welding, riveting, bolting, threaded connection and other commonly used connection methods in the field. It can be directly connected or indirectly connected through an intermediate medium. It can also be the internal connection of two elements.

[0037] Example 1

[0038] like Figure 1-Figure 5As shown in the figure, a lock guide wall includes multiple piles 1 arranged at intervals. The bottom ends of the piles 1 extend into the rock stratum at the lower part of the guide wall. A first capping beam 4 is provided at the top of the piles 1. Multiple columns 2 arranged at intervals are connected to the top surface of the first capping beam 4. A precast insert plate 3 is inserted between two adjacent columns 2. The thickness of the precast insert plate 3 is smaller than that of the piles 1.

[0039] The piles 1 located outside the rock stratum are permeable areas. A precast insert plate 3 is arranged between two adjacent columns 2. Compared with directly pouring the lining for flow isolation, it can improve the construction efficiency and is conducive to shortening the construction period. Moreover, the thickness of the precast insert plate 3 is smaller than that of the columns 2, which can save construction costs and is also convenient for construction. And the precast insert plate 3 is inserted between two adjacent columns 2. When the precast insert plate 3 is damaged, only the precast insert plate 3 needs to be replaced. Compared with the prior art where all need to be replaced, it can save costs and also improve the replacement efficiency.

[0040] As Figure 2 and Figure 4-Figure 5 shown in the figure, on the mutually facing sides of the columns 2, there are bayonet openings 6, and the size of the bayonet openings 6 matches the size of the precast insert plate 3. The cross-section of the bayonet openings 6 is in the shape of "匚". Cement mortar is poured between the bayonet openings 6 and the precast insert plate 3. As a further preferred solution, on the inner side wall of the bayonet openings 6, there are recessed parts (not shown in the figure), and on the precast insert plate 3, there are protruding parts (not shown in the figure) corresponding to the recessed parts on the inner wall of the bayonet openings 6.

[0041] As Figure 1 shown in the figure, a first capping beam 4 is arranged between the columns 2 and the piles 1. A second capping beam 5 is also provided at the top of the columns 2.

[0042] Spiral bars (not shown in the figure) are arranged inside the piles 1, and the axis of the spiral bars is parallel to the axis of the piles 1.

[0043] The distance between two adjacent piles 1 is 2m.

[0044] In this embodiment, the lock guide wall has a total of 43 piles 1 with a diameter of φ2000mm, all of which are cast-in-place piles. The part of the piles 1 below -9.7m is the rock-socketed section, that is, it extends into the rock stratum below the guide wall; the section from -9.70m to -2.70m is the open section, which allows water flow through; the section from -2.70m to -0.6m is the first capping beam 4, the section from -0.6 to 6.4 is the precast insert plate 3 and the columns 2, and the section from 6.4 to 8.5 is the second capping beam 5.

[0045] For the cast-in-place piles in the rock-socketed section of the piles 1 below -9.7m, a rotary drilling rig is used for construction, and for the open section from -9.7m to -2.7m, a formwork is erected for cast-in-place pile splicing technology.

[0046] -2.7m~-0.6m is the first crown beam 4 where the side formwork is constructed with steel formwork, -0.6m~6.4m columns are constructed with cast-in-place formwork technology, the plug plates are constructed with prefabricated installation technology, and the second crown beam 5 is constructed with the bottom formwork supported by the embedded platform nut bracket tripod method.

[0047] Example 2

[0048] A ship lock, comprising a ship lock flow barrier as described in Example 1, which is beneficial to shortening the construction period and is also convenient for replacement after damage, thereby helping to improve the quality of the ship lock.

[0049] The above are only preferred embodiments of the present invention and are not intended to limit the present invention. Any modifications, equivalent substitutions and improvements made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. A ship lock flow barrier, characterized in that: It includes multiple pile foundations (1) arranged at intervals, the bottom ends of the pile foundations (1) extend into the rock stratum at the lower part of the flow isolation wall, a first capping beam (4) is arranged at the top of the pile foundations (1), multiple columns (2) arranged at intervals are connected to the top surface of the first capping beam (4), a precast insert plate (3) is inserted between two adjacent columns (2), and the thickness of the precast insert plate (3) is less than the thickness of the pile foundation (1).

2. A ship lock flow barrier according to claim 1, characterized in that: A bayonet (6) is arranged on one side of the column (2) facing each other, and the size of the bayonet (6) matches the size of the precast insert plate (3).

3. A ship lock flow barrier according to claim 2, characterized in that: The cross-section of the bayonet (6) is in the shape of "匚".

4. A ship lock flow barrier according to claim 2, characterized in that: Cement mortar is poured between the bayonet (6) and the precast insert plate (3).

5. A ship lock flow barrier according to any one of claims 1 to 4, characterized in that: A second capping beam (5) is further arranged at the top of the column (2).

6. A ship lock flow barrier according to any one of claims 1 to 4, characterized in that: Spiral bars are arranged inside the pile foundation (1), and the axis of the spiral bars is parallel to the axis of the pile foundation (1).

7. A ship lock flow barrier according to any one of claims 1 to 4, characterized in that: The distance between two adjacent pile foundations (1) is 2m.

8. A ship lock, characterized in that: It includes a ship lock flow isolation wall according to any one of claims 1-7.