Support-free long-distance compensation method and system for ground-burying type pipe
A compensation method and buried technology, applied in the field of compensation methods and corresponding pipeline systems, can solve the problems of short safety life and large investment, and achieve the effect of simplifying the installation process, simple installation process and wide application range.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0038] The following structural drawings and embodiments further illustrate the present invention.
[0039] As shown in Figure 1 and 2.
[0040] The unsupported and long-distance compensation method for buried pipelines of the present invention is to firstly place the pipelines to be auxiliary directly on the untreated soft ground below the ground; secondly, at the set compensation position (two adjacent The distance between the compensation positions can be up to 500 meters) or at the turn to install two or more rotary compensators to compensate for the change in the length of the pipeline due to thermal expansion and contraction. The rotary compensators are installed in In the hollow buried concrete structure or steel structure installation foundation, the hollow buried concrete structure or steel structure installation foundation is either a hollow structure without any filler added, or filled with compressible materials or soft soil The solid structure of the buried concr...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com