Metro engineering pile foundation underpinning construction method
What is Al technical title?
Al technical title is built by PatSnap Al team. It summarizes the technical point description of the patent document.
A construction method and technology of engineering piles, applied in the direction of infrastructure engineering, construction, etc., can solve the problems of large investment, complex construction process, affecting the surrounding environment, etc., and achieve the effect of saving investment.
Active Publication Date: 2009-02-25
CHINA RAILWAY 18TH BUREAU GRP CO LTD
View PDF4 Cites 0 Cited by
Summary
Abstract
Description
Claims
Application Information
AI Technical Summary
This helps you quickly interpret patents by identifying the three key elements:
Problems solved by technology
Method used
Benefits of technology
Problems solved by technology
[0002] At present, in municipal underground projects, there are many situations where spaces intersect with bridges and passage facilities or pass by. Most of the solutions adopted are to demolish and modify existing bridges and passage facilities. This method has complex construction process, poor safety and large investment. and seriously affect the surrounding environment
Method used
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more
Image
Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
Click on the blue label to locate the original text in one second.
Reading with bidirectional positioning of images and text.
Smart Image
Examples
Experimental program
Comparison scheme
Effect test
Embodiment Construction
[0014] The tunnel at the Yike South Road Station Section of Huangzhuang Station of Beijing Subway Line 10 (hereinafter referred to as the Huangke Section) is constructed using the shallow-buried underground excavation method. The tunnel passes through Zhichun Road and runs east-west along Zhichun Road. The tunnel on the right line of the section passes under the pedestrian bridge of Zhichun Building at k2+629.983, and the section tunnel crosses the pile foundation of the bridge in space. This section is the bell-mouth separation section of the interval line, and the tunnel structure is in the form of a double-arch section, which is constructed by the middle-hole method. The main girder of the upper structure of Zhichun Building Pedestrian Bridge is a three-span continuous two-chamber closed steel girder, the ladder girder is a simply supported steel step plate, and the bridge piles are φ1000 bored piles with a length of 15.2m. The buried depth of the tunnel roof at this place i...
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More
PUM
Login to View More
Abstract
The invention relates to a railway engineering pile foundation underpinning construction method, the procedures comprise reinforcing the ground, namely, a pedestrian bridge is supported by a steel pipe scaffold on the ground, and processing in a cave, firstly, concrete which is distributed on the surface layer of a pile is removed, secondly, enciphering grids are set up, thirdly, muscles are planted and formwork lining umbrella arch is poured, fourthly, piles are sectionalized and secondary lining concrete is poured, namely, when the formwork lining on the lower portion of support at primary stage achieves the intensity which is designed, base piles in tunnel lining is removed, and boundary agent is brushed, and a foam board bedding layer is further arranged, and a water-protecting layer is made, and space interval structure formwork lining is poured. The invention has the advantages that firstly, the monitor measure data of on site construction shows that the largest sedimentation of pile accumulation is 8047mm, and the largest discrepancy sedimentation is 291mm. Cracks are not founded during the construction period though the observation of a hat beam, and sedimentation of piles and bending deflection of the hat beam is designed in the regulated scope, and the deformation rule conforms to the design account, which fully shows that underpinning design of piles is reliable and safe, secondly, the invention saves investment.
Description
Technical field: [0001] The invention belongs to a building construction method, in particular to a subway engineering pile foundation underpinning construction method. Background technique: [0002] At present, in municipal underground projects, there are many situations where spaces intersect with bridges and passage facilities or pass by. Most of the solutions adopted are to demolish and modify existing bridges and passage facilities. This method is complicated in construction process, poor in safety, and large in investment. And seriously affect the surrounding environment. Invention content: [0003] The purpose of the present invention is to overcome the shortcomings in the above-mentioned prior art, and provide a construction method for pile foundation underpinning in subway engineering, the construction process of which is simple, safe and reliable. [0004] The technical solution of the present invention is: a subway engineering pile foundation underpinning const...
Claims
the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More
Application Information
Patent Timeline
Application Date:The date an application was filed.
Publication Date:The date a patent or application was officially published.
First Publication Date:The earliest publication date of a patent with the same application number.
Issue Date:Publication date of the patent grant document.
PCT Entry Date:The Entry date of PCT National Phase.
Estimated Expiry Date:The statutory expiry date of a patent right according to the Patent Law, and it is the longest term of protection that the patent right can achieve without the termination of the patent right due to other reasons(Term extension factor has been taken into account ).
Invalid Date:Actual expiry date is based on effective date or publication date of legal transaction data of invalid patent.