Resource scheduling method and system

A resource scheduling and resource unit technology, applied in resource allocation, multi-programming devices, etc., can solve the problems of cumbersome implementation and achieve high adaptability and speed improvement

Inactive Publication Date: 2009-02-04
ZTE ITS CO LTD
View PDF0 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0006] The embodiment of the present invention provides a resource scheduling method and system to solve the problem that the existing resource scheduling method requires the operator to determine the resource scheduling situation of each working day and the implementation is cumbersome

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Resource scheduling method and system
  • Resource scheduling method and system
  • Resource scheduling method and system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0021] Embodiments of the present invention provide a resource scheduling method and system.

[0022] Before describing the technical solution of the present invention, the following concepts are clearly defined at first:

[0023] Resource unit: A single entity among the resources that participate in the work, such as: it can be a computer, a worker, a bus, a camera, etc.

[0024] Job: Resource units will perform some jobs, and each job is called a job. For example: a computer, sometimes it is required to run an anti-virus program, and sometimes it is required to run a calculation program, then running an anti-virus program and running a calculation program are the two jobs of this computer; a driver, sometimes he is required to drive, sometimes he is required to repair the car, and sometimes If you want him to wash the car, then driving, repairing the car, and washing the car are the three jobs of the driver.

[0025] Position rotation order: The order in which resource uni...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a resource scheduling method and a system which solve the problems of the resource scheduling method in the prior art that the operator determines the resource scheduling situation of each workday; the implementation of the resource scheduling method is complicated. The method includes that the resource scheduling system captures the post rotation sequence information, the post replacement cycle and the rest rule information of the resource unit provided by the user; the post rotation sequence parameter, the post replacement cycle parameter and the rest rule parameter are respectively determined according to the captured post rotation sequence information, the post replacement cycle and the rest rule information; the work time and the idle time of the resource unit within the reference time segment are determined according to the rest rule parameter; the work time is sequentially divided into a plurality segments of post time according to the post replacement cycle parameter; the initial post executed by the resource unit in the first post time is determined; meanwhile, the corresponding post executed by the resource unit in each post time segment is determined according to the post rotation sequence parameter.

Description

technical field [0001] The invention relates to the field of computer software, in particular to a resource scheduling technology. Background technique [0002] In the prior art, manual scheduling or computer-aided scheduling is usually used for resource scheduling. [0003] Among them, the implementation process of manual scheduling is as follows: firstly, determine the number of resource units that need to participate in the work each working day, make grids that can place resource unit identification plates in units of shifts, and group the grids according to work types; , put the resource unit identification plate into the corresponding grid to form the initialized resource scheduling result. From now on, each working day and each group will move the resource unit identification plate in the grouping grid according to certain rules to form the result of resource scheduling. If there is a scheduling change, the position of the resource unit identification plate can be a...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G06F9/50
Inventor 贾琳翟东伟刘海峰
Owner ZTE ITS CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products