Method and device for carrying out hot backup on services

A hot backup and business technology, applied in the communication field, can solve the problems of business hot backup time extension, business interruption, etc.

Inactive Publication Date: 2011-09-21
DATANG MOBILE COMM EQUIP CO LTD
View PDF2 Cites 13 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0030] In view of the above-mentioned technical problems existing in the prior art, the embodiments of the present invention provide a method and device for service hot backup, so as to quickly and effectively realize service hot backup in the case of RRU ring connection, and overcome the problem of implementing service hot backup in the prior art. The problem of service interruption due to long delay

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Method and device for carrying out hot backup on services
  • Method and device for carrying out hot backup on services
  • Method and device for carrying out hot backup on services

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0061] In view of the above-mentioned technical problems existing in the prior art, the embodiments of the present invention provide a method and device for service hot backup, so as to quickly and effectively realize service hot backup in the case of RRU ring connection, and overcome the problem of implementing service hot backup in the prior art. The problem of service interruption due to long delay. In the technical solution of the present invention, the BBU establishes a channel after the RRU is accessed, and calculates the first delay measurement value and the second time delay when the RRU accesses the BBU from the first link and the second link. and the BBU and RRU perform service interaction on the first link; when the subsequent first link fails, the BBU only needs to enable the IQ configuration corresponding to the first link and enable the corresponding IQ configuration of the second link. The IQ configuration on the BBU side can complete the link switching on the B...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a method and a device for carrying out hot backup on services, by which the service hot backup under the condition of RRU (radio remote unit) annular connection is realized quickly and effectively, and the problem of service interruption caused by that the time delay for realizing the service hot backup is long in the prior art is solved. The method comprises the following steps that: after an RRU accesses to a BBU (building base band unit), the BBU establishes a channel, and calculates and allocates a first delay measurement value and a second delay measurement value, wherein the first delay measurement value refers to a value of time delay that the RRU accesses to the BBU from a first link, and the second delay measurement value refers to a value of time delay that the RRU accesses to the BBU from a second link; after carrying out parameter configuration and cell configuration on the RRU, the BBU carries out service interaction on the first link; when determining that the first link is at fault, the BBU enables an IQ (intelligent) configuration corresponding to the first link and enables an IQ configuration corresponding to the second link; and after the RRU switches a clock from the first link to the second link and configures the time delay value from the first delay measurement value to the second delay measurement value, the BBU continues to perform the service above with the RRU.

Description

technical field [0001] The invention relates to the communication field, in particular to a method and device for service hot backup. Background technique [0002] At present, according to the definition of "2GHz TD-SCDMA Digital Cellular Mobile Communication Network - Ir Interface Technical Requirements for Distributed Base Stations" (hereinafter referred to as "TD-S Ir Interface Technical Requirements"), in the RRU (Radio Remote Unit, remote radio module) In the ring connection process, only link cold backup can be realized, and link hot backup cannot be realized; figure 1 Shown is a flow chart of realizing link cold backup of RRU ring connection in the prior art, and the process includes the following steps: [0003] Step 101, the RRU is connected to a BBU (Building Base band Unit, baseband processing unit) in a broadcast access manner. [0004] Step 102, establishing a channel between the RRU and the BBU, and enabling heartbeat detection. [0005] Step 103, the BBU me...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): H04W24/04H04W36/00
Inventor 陶磊朱莉森
Owner DATANG MOBILE COMM EQUIP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products