A construction method for the communication channel of the broken stratum in the shield tunnel crossing the river

A communication channel and shield tunnel technology, which is applied in the construction field of the communication channel of the broken ground of shield tunnels across the river, can solve the problems of ground reinforcement failure, poor construction quality, and high construction cost, and achieve controllable construction safety, environmental protection, and The effect of high degree of mechanization

Active Publication Date: 2011-12-21
CHINA RAILWAY 12TH BUREAU GRP +1
View PDF4 Cites 29 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] In order to solve the problems of stratum reinforcement failure, long construction period, high construction cost and poor construction quality in the construction of the existing river-crossing shield tunnel broken stratum communication channel, the present invention provides a new river-crossing shield tunnel broken stratum communication channel. Construction method

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

example

[0061] Shiziyang Tunnel is the first extra-long underwater railway mud-water shield tunnel in my country, with a total length of 10,800m and a distance of 10.4m between the two tunnels. There are 23 connecting passages between the two tunnels, 80% of which are located in the high-water-pressure broken rock mass Among them, there are a large number of water gushing channels behind the formed tunnel segments. When the traditional construction method is used to construct the first communication channel, water gushing, landslides, and deformation of adjacent tunnel segments will occur. The construction is difficult and risky. Finally, concrete backfilling is used. Control the risk.

[0062] The remaining communication channels are constructed using the construction method described in the present invention, which speeds up the construction speed of the communication channels, ensures the safe and efficient construction of the 23 communication channels of the Shiziyang Tunnel, realize...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a construction method for an underground tunnel, in particular to a construction method for a river-crossing shield tunnel crushed stratum communication channel, which is used for solving the problems of failure of stratum reinforcement, long working period, high cost, poor quality and the like existing in the construction process of the conventional river-crossing shieldtunnel crushed stratum communication channel. The method comprises the following steps of: determining the position of the communication channel; before opening, performing pre-grouting to integrallyconsolidate broken rock outside the excavation outline of the communication channel; forming a high-strength waterproof curtain; before excavation, performing stress conversion; drilling and partitioning to remove a left line pipe sheet, brushing the top, performing tunnel excavation with a combined damping burst technology, and timbering; and drilling and partitioning to remove a right line pipesheet, brushing the top, and performing second lining construction by adopting a combination template. Due to the adoption of the construction method, water seepage is avoided after excavation, the technology is advanced, the blank of a communication channel pre-grouting technology is fulfilled, the working period is short, the mechanical degree is high, the process is simple, construction is environmentally-friendly, collapse is avoided, and over-excavation is greatly lowered; and the method has a wide application range.

Description

technical field [0001] The invention relates to a construction method of an underground passage, in particular to a construction method of a communication passage in a broken stratum of a river-crossing shield tunnel. Background technique [0002] Communication channel construction is usually carried out in shield tunneling projects, so that during subway operation, when a fire or accident occurs in one of the interval tunnels, passengers can immediately and safely evacuate to another tunnel through the set communication channel. In the previous projects, the ground reinforcement method of the communication channel in the shield tunneling project was reinforced by one or more combinations of stirring pile reinforcement, rotary grouting pile reinforcement, grouting reinforcement or freezing method reinforcement methods, and mine method for excavation. However, when constructing communication channels in the fractured zone across the river, due to the abundant groundwater, st...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E21D9/00E21D9/08E21D11/00E21D11/10E21D11/38F42D3/04
Inventor 王宗勇雷军宋津喜刘广钧高治双张金柱徐家定赵常煜杨耀福刘建佳唐龙
Owner CHINA RAILWAY 12TH BUREAU GRP
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products