Construction method of fast pavement in place with thick and heavy stones

A construction method and technology of stone blocks, which are applied to pavement, roads, and road repairs paved with prefabricated blocks, and can solve problems such as difficulty in ensuring the flatness of the ground, inability to accurately and quickly place stones in place, and difficulty in prying them out. , to achieve the effect of low cost, simple structure and convenient manufacture

Active Publication Date: 2014-10-15
GUANGZHOU NO 1 CONSTR ENG +2
View PDF5 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, when paving stones in the prior art, plane positioning, elevation control and mortar thickness are all realized by repeated operations (for example: if the elevation or position or flatness does not meet the requirements, it is necessary to pry out the stones, add or Reduce the thickness of the mortar and adjust it before placing it again. If you can’t do it once, you have to adjust it several times. For thick stones, it’s very difficult to pry out), the stones cannot be placed in place accurately and quickly, and the ground where the stones are laid It is also difficult to guarantee the flatness of

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of fast pavement in place with thick and heavy stones
  • Construction method of fast pavement in place with thick and heavy stones
  • Construction method of fast pavement in place with thick and heavy stones

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0025] Combine below figure 1 , figure 2 , image 3 An embodiment of the present invention is described in detail.

[0026] figure 1 Shown is a schematic cross-sectional view of the ground treatment laying works. According to the order from bottom to top, the reinforced concrete structural surface 1 is poured first, and then the waterproof mortar leveling layer 2, the polymer membrane waterproof layer 3, the extruded polystyrene heat insulation layer 4, and the fine stone waterproof concrete layer 5 are successively constructed , layer 6, dry hard cement mud 7, stone board 8 that are provided with quick placer.

[0027] specifically, figure 1 In the shown ground treatment and laying project, the construction method for quick in-place paving of heavy stones includes the following steps:

[0028] (1) Make the quick seater 60. The quick positioning device 60 includes a transverse force-bearing part and a longitudinal force-bearing part perpendicular to each other; the...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a fast in-place paving construction method for thick and heavy stone blocks. The fast in-place paving construction method comprises the following steps of: (1) manufacturing a fast in-place device, wherein the fast in-place device comprises a transverse stress part and a longitudinal stress part which are vertical to each other, the transverse stress part is of a plane framework and is used for directly supporting single stone blocks, and the longitudinal stress part is fixedly connected with one side of the plane framework and used for supporting the transverse stress part and the stone blocks thereon; (2) pre-burying a connecting steel bar which is vertically upward in the paving position of each stone block; (3) testing repeatedly to measure the virtual paving height M of mortar for paving the stone blocks, which is further used for paving the stone blocks with the same thickness and size; (4) fixedly connecting the vertical stress part of the fast in-place device with the connecting steel bars to fixedly mount the fast in-place device, and performing the paving control on the stone blocks in a wire hanging mode; (5) enabling the paid mortar to achieve the virtual paving height M; and (6) paving the stone blocks on the transverse stress part of the fast in-place device, and thrashing the stone blocks to compress the mortar which is virtually paved.

Description

technical field [0001] The invention belongs to the field of civil engineering and construction engineering, and in particular relates to a construction method for quick in-place paving of thick and heavy stones. Background technique [0002] With the improvement of living standards, more and more activity squares appear and the demand is still increasing. Large squares generally use thicker stones for ground paving. Granite and other stones are durable, firm and reliable, and are widely used in square ground paving construction. These thicker stones are single The weight of the block is large, and the transportation and handling are difficult. [0003] During paving, the plane positioning of stones, elevation control, mortar thickness and other factors determine the quality, progress and appearance of stone paving in the square. However, when paving stones in the prior art, plane positioning, elevation control and mortar thickness are all realized by repeated operations (...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): E01C5/02E01C19/52
Inventor 关而道邵泉胡志桥吴瑞卿钟文深李麟吴昊
Owner GUANGZHOU NO 1 CONSTR ENG
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products