Method and system for adjusting train working diagrams on basis of platform redundancy
A technology of train operation diagram and adjustment method, which is applied to the control system of the transportation center, transportation and packaging, railway car body parts, etc., and can solve the problems of idle platform, platform occupancy, platform occupancy, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0146] Such as image 3 A section of railway includes three stations and two sections, and each station includes two platforms. There are three trains going from station 1 to station 3, and one train going from station 2 to station 3.
[0147] Table 1, the original operation diagram
[0148]
[0149] The original running diagram is shown in Table 1. The safe time interval is equal to H=Δ=5min. If u is used to represent the operation time stipulated in the original operation diagram (referring to the station operation time or inter-station operation time), then the minimum stop time is equal to u-3, and the minimum interval operation time is equal to u-5, that is, at the station between stations d ij min = u - 5 .
[0150] Step 1. When the first platform of the first station fails due to equipment failure, the ground signal system reports the failure information ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com