Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Resource allocation method and resource allocation system for line walking shortcut building project

A resource allocation and project technology, which is applied in the field of resource allocation of the line patrol road construction project, can solve problems such as difficulty in meeting the requirements of the line patrol road construction task, low allocation efficiency, and error-prone manual estimation methods

Active Publication Date: 2013-10-02
ELECTRIC POWER RES INST OF GUANGDONG POWER GRID
View PDF3 Cites 1 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] The above-mentioned technical means rely on manual methods, the configuration efficiency is low, and the manual estimation method is prone to errors, and it is difficult to meet the requirements of a large number of construction tasks for patrol roads. In addition, because the work content, terrain conditions and construction Due to factors such as length, the configuration results cannot accurately reflect the objective quota determination requirements of the construction project of the patrol road, and the configuration accuracy is low.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Resource allocation method and resource allocation system for line walking shortcut building project
  • Resource allocation method and resource allocation system for line walking shortcut building project
  • Resource allocation method and resource allocation system for line walking shortcut building project

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0031] The present invention will be further described below in conjunction with the embodiments and drawings, but the implementation of the present invention is not limited thereto.

[0032] see figure 1 As shown, it is a schematic flow chart of an embodiment of the method for resource allocation of the line patrol road construction project of the present invention. like figure 1 As shown, in this embodiment, the resource allocation method for the line inspection sidewalk construction project includes the following steps:

[0033] Step S101: Determine the granularity of the line patrol road construction project according to the project information of the line patrol road construction project;

[0034] In an embodiment of the present invention, the granularity is one of roadbed reinforcement and repair, access road construction, and obstacle removal, or a pairwise combination of roadbed reinforcement and repair, access road construction, and obstacle removal, or roadbed rein...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a resource allocation method and a resource allocation system for a line walking shortcut building project. The method comprises the steps that the granularity of the line walking shortcut building project is determined; sample data is drawn from a historical database; a sample vector is obtained according to a terrain increase coefficient and the building length in the sample data; a target vector is obtained according to historical cost data in the sample data; a preestablished BP artificial neural network is trained according to the sample vector and the target vector; the trained BP artificial neural network and a connection weight of a network input layer are obtained; an input testing sample is received; a cost value of the line walking shortcut building project is obtained according to the trained BP artificial neural network, the connection weight and the testing sample; an adjustment factor is determined according to preset rates; a line walking shortcut building quota is determined according to the cost value and the adjustment factor; and resources of the line walking shortcut building project are allocated according to the quota. The efficiency and the accuracy of resource allocation are improved.

Description

technical field [0001] The invention relates to the technical field of line patrol road construction, in particular to a resource allocation method and system for a line patrol road construction project. Background technique [0002] In the power grid enterprises, there are a large number of construction tasks of patrol roads every year. In order to tap the internal factors of the enterprise, effectively reduce costs and improve efficiency, and evaluate the construction quota of patrol roads according to the principle of the average advanced level, in the implementation of patrol roads When constructing a task, it is first necessary to determine the quota for the construction project of the patrol road, and then allocate related resources according to the quota of the construction project of the patrol road, for example, according to the quota of the construction project of the patrol road, reasonably allocate Maintenance personnel and engineering vehicles to achieve the pur...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06N3/02G06F9/50
Inventor 骆洁艺杨晓东陈海涵潘璠曾彤赖绮瑄李端娇张慧翔宋明波游维扬欧琳王秀娜
Owner ELECTRIC POWER RES INST OF GUANGDONG POWER GRID
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products