Double-pulley hanging method for synchronously unfolding ultrahigh-voltage multi-bundled conductor
A multi-split, UHV technology, applied in the direction of overhead lines/cable equipment, etc., can solve problems such as the problem of double trolley setting-out, and achieve significant economic benefits, improve construction efficiency, and save time.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0069] The present invention utilizes the connecting board under the hanging series of insulators. In this embodiment, the connecting board adopts a six-connecting board (for a four-split conductor, it is a four-connected board, and for an eight-split conductor, it is an eight-connected board). , two identical pay-off blocks are suspended, and the parallel hanging plate on the pay-off block adopts a special lengthened parallel hanging plate. Like this, no matter how many split wires, as long as the synchronous deployment is adopted, the method of the present invention can be adopted.
[0070] This embodiment is designed with a six-split wire as a sample, and it is used for trial in a ±800 kV UHV DC transmission project. Other four-split and eight-split wires can be implemented as a reference.
[0071] The present invention utilizes the hanging point hanging holes of the sub-conductors on both sides of the six-connected plate under the V-shaped hanging string of the iron tower ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com