Equipment preventive maintenance and flexible job shop scheduling integrated optimization method

A technology of preventive maintenance and flexible operation, applied in the direction of electrical program control, comprehensive factory control, technical management, etc., can solve the problems of weak local search ability, low local search ability, and little understanding of the global search space status

Inactive Publication Date: 2014-10-22
HUAZHONG UNIV OF SCI & TECH
View PDF1 Cites 25 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] Metaheuristic methods commonly used to solve production control and equipment maintenance planning, including genetic method (GA), simulated annealing method (SA), tabu search method (TS) and particle swarm optimization method (PSO), but genetic method and particle swarm optimization method in In practical applications, disadvantages such as low local search ability and poor convergence are prone to occur. The disadvantages of simulated annealing method and tabu se

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Equipment preventive maintenance and flexible job shop scheduling integrated optimization method
  • Equipment preventive maintenance and flexible job shop scheduling integrated optimization method
  • Equipment preventive maintenance and flexible job shop scheduling integrated optimization method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0033] In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.

[0034] The main purpose of the present invention is to address the deficiencies of existing models and methods, establish an integrated optimization model of flexible job shop control and equipment preventive maintenance considering cost and efficiency, and propose a hybrid chemical reaction method to optimize and solve the model , so as to play a certain guiding role in the workshop control and equipment maintenance of the actual production of the enterprise, and bring higher production efficiency and economic benefits to the enterprise.

[0035] (1) Preventive Maintenance (PM) theory

[0036]By ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses an equipment preventive maintenance and flexible job shop scheduling integrated optimization method. The method is characterized by specifically comprising: first of all, according to an operation sequence, an equipment maintenance period, and a constraint condition of uninterrupted production process of each operation and non-conflict production process and equipment maintenance process of a flexible job shop scheduling problem, establishing an integrated optimization model of a flexible job shop scheduling and equipment maintenance plan, which takes cost and efficiency into consideration; secondary, optimizing multiple targets by use of a hybrid multi-objective chemical-reaction optimization method, the multiple targets comprising maximum completion time, total production cost and total equipment preventive maintenance cost; and finally, obtaining an optimization solving result, such that a flexible job shop scheduling plan can be obtained. The method can realize the goals of reducing the maximum completion time, the production cost and the equipment maintenance cost and can obtain an optimal flexible job shop scheduling scheme.

Description

technical field [0001] The invention belongs to the technical field of automatic production lines, and in particular relates to an optimization method of flexible workshop control technology considering equipment preventive maintenance. Background technique [0002] The Flexible Job Shop Scheduling Problem (FJSP) is a more complex so-called non-deterministic polynomial (NP-hard) problem than the traditional Job Shop Scheduling Problem (JSP). Problems, where NP refers to non-deterministic polynomial (abbreviated as NP), the so-called non-deterministic means that a certain number of operations can be used to solve problems that can be solved within polynomial time. In the flexible job shop control problem, each process of each workpiece can be processed on multiple optional processing machines, and each machine can also process different processes of multiple workpieces, and different machines can process the same The time required for the process is different, which makes th...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G05B19/418
CPCY02P90/80
Inventor 宋文家张超勇邵新宇罗敏刘琼饶运清朱海平张三强林文文金亮亮谢阳
Owner HUAZHONG UNIV OF SCI & TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products