Transition interface method of emergency operation regulation and severe accident management guide rule
A technology for serious accidents and operating procedures, applied in the field of accident management of nuclear power plants, which can solve problems such as it is difficult to meet the requirements of accident management
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0035] like figure 1 shown. figure 1 Two scenarios are described for interface management: In Scenario 1, when a severe accident occurs due to core damage, the TSC is fully in place and ready to provide the main control room with instructions to mitigate the severe accident, so the TSC steps in and implements the TSC guidelines , instructing the main control room to implement mitigation operations; in case 2, the TSC was not in place when the core was damaged and could not intervene in accident management, and the main control room executed SACRG-1 until the TSC intervened.
[0036] figure 1 In the middle, TSC means: Technical Support Center; SAMG means: Severe Accident Management Guidelines; SAMG is divided into main control room guidelines and TSC guidelines, above the horizontal dotted line in the figure is the main control room guidelines, including ICRG and SACRG, below the horizontal dotted line It is the TSC guideline; ICRG means: the main control room guideline durin...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com