Transition interface method between emergency operating procedures and severe accident management guidelines
A technology for serious accidents and operating procedures, applied in the field of accident management of nuclear power plants, which can solve problems such as it is difficult to meet the requirements of accident management
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0035] Such as figure 1 shown. figure 1 Interface management is described for two scenarios: In scenario 1, when a severe accident occurs with core damage, the TSC is fully in place and ready to provide guidance to the main control room to mitigate the severe accident, so the TSC steps in and implements the TSC guidelines , to guide the main control room to implement mitigation operations; in case 2, the TSC is not in place when the core is damaged, and cannot intervene in accident management, and the main control room executes SACRG-1 until TSC intervenes.
[0036] figure 1 In TSC means: Technical Support Center; SAMG means: Severe Accident Management Guidelines; SAMG is divided into main control room guidelines and TSC guidelines. Is TSC guidelines; ICRG means: severe accident transition period main control room guidelines; SACRG means: main control room serious accident guidelines; SACRG is divided into SACRG-1 and SACRG-2, SACRG-1 means: main control room serious acciden...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com