Progress plan quick compilation method based on BIM and big data

A schedule plan and big data technology, applied in data processing applications, calculations, instruments, etc., can solve the problems of different schedule plans, insufficient construction time, and construction team delays, etc., to facilitate tracking and query, and improve executable Sexuality, the effect of improving scientific

Inactive Publication Date: 2017-02-01
NO 1 CONSTR ENG CO LTD OF CHINA CONSTR THIRD ENG BUREAU CO LTD
View PDF2 Cites 8 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] At present, there are many construction projects, and the construction schedule plan is an important reference in the whole process of project construction. The preparation of the construction schedule plan often takes a lot of time, and the preparation of the project schedule plan is often based on the personal work experience of the compiler. However, everyone's experience is uneven, and the quality of the prepared schedules is often different. In addition, in the actual project, there are also many phenomena such as insufficient construction time and partial construction teams due to inaccurate construction schedules. Greatly affect the construction progress of the project

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Progress plan quick compilation method based on BIM and big data
  • Progress plan quick compilation method based on BIM and big data

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0020] In order to make the object, technical solution and advantages of the present invention more clear, the present invention will be further described in detail below in conjunction with the examples. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention.

[0021] Such as figure 1 As shown, the project schedule preparation method includes the following contents.

[0022] The graded naming of components, because different majors have different amounts of component information extraction, the graded naming can facilitate the graded extraction of component information, each takes what is needed, and avoids the redundancy of information. Secondly, through the unified model component naming and schedule Sub-item naming and list naming in the process of business calculation realize the sharing of inter-professional information and eliminate the barriers to inter-professional inform...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a progress plan quick compilation method based on BIM and big data. The method comprises the following steps: 1) hierarchical naming management of project components; 2) project working day quota and component construction process standardization; 3) automatic generation of a progress plan based on BIM; 4) collection and analysis of actual construction progress; and 5) automatic updating of a progress plan automatic compilation quota database. The progress plan quick compilation method based on BIM and big data improves project progress plan compilation efficiency, improves project progress plan compilation scientificity and feasibility and ensures traceability of the whole process of the construction process information.

Description

technical field [0001] The present invention relates to building construction technology, in particular to a method for quickly compiling schedule plans based on BIM and big data. Background technique [0002] At present, there are many construction projects, and the construction schedule plan is an important reference in the whole process of project construction. The preparation of the construction schedule plan often takes a lot of time, and the preparation of the project schedule plan is often based on the personal work experience of the compiler. However, everyone's experience is uneven, and the quality of the prepared schedules is often different. In addition, in the actual project, there are also many phenomena such as insufficient construction time and partial construction teams due to inaccurate construction schedules. Greatly affect the construction progress of the project. Contents of the invention [0003] The technical problem to be solved by the present inven...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q10/10G06Q50/08
CPCG06Q10/06316G06Q10/103G06Q50/08
Inventor 王能林楼跃清汪小东张欣李娟
Owner NO 1 CONSTR ENG CO LTD OF CHINA CONSTR THIRD ENG BUREAU CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products