Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Reservoir flood-control dispatching optimization method based on flood-control dispatching data adaptive control

A technology of adaptive control and flood control dispatching, applied in the direction of adaptive control, control/regulation system, general control system, etc., can solve problems such as inconvenient operation, reservoir dispatching map cannot be used for flood control dispatching, inconvenient use, etc.

Active Publication Date: 2017-06-20
CHINA INST OF WATER RESOURCES & HYDROPOWER RES
View PDF11 Cites 13 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] 1. The existing dynamic control method of flood limit water level of the reservoir is applied to the real-time dispatching stage of the reservoir. The dispatching rules are complicated and inconvenient to operate in actual application
[0005] 2. The existing reservoir scheduling diagram is more intuitive and easy to apply, and has been widely used in reservoir prosperity scheduling. However, the existing reservoir scheduling diagram cannot be applied in flood control scheduling
[0006] 3. Introduce the incoming water from the reservoir in the flood control dispatching map, but, due to the flood control dispatching Figure 1 Generally, it is designed by the researchers themselves. It is not as good as the uniform and fixed shape of the Xingli dispatching map. When using the flood control dispatching map that introduces water from the reservoir, the user needs to study it first and then organize it into the shape required by the user. Therefore, it is not convenient to use. The problem

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Reservoir flood-control dispatching optimization method based on flood-control dispatching data adaptive control
  • Reservoir flood-control dispatching optimization method based on flood-control dispatching data adaptive control
  • Reservoir flood-control dispatching optimization method based on flood-control dispatching data adaptive control

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0106] The horizontal axis of the general flood control scheduling diagram is the inflow flow increment of the facing period, and the vertical axis is the possible water level at the end of the facing period. For a certain reservoir, analyze the historical runoff law of the reservoir dam site during the flood season, and replace the predicted flow with the measured flow. 3 / s,20938m 3 / s] (1961-2005), while the flood limit water level of the reservoir is 145m, the normal water level is 175m, and the water level normally fluctuates within the range of [145m, 175m], and the upper and lower limits of the value should be appropriately widened. The variable amplitude of the fixed water level is [144.5m, 180m], and it is obtained as follows: Image 6 The general flood control scheduling diagram of the reservoir shown.

[0107] The general flood control scheduling diagram adopts such as Image 6 For the four control lines shown, the corresponding leakage flow (from top to bottom) ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a reservoir flood-control dispatching optimization method based on flood-control dispatching data adaptive control and relates to the technical field of reservoir flood-control dispatching. The method comprises the following steps: establishing a target reservoir general flood-control dispatching chart; establishing a flood-control dispatching model; determining an objective function; according to the number of dispatching lines of the general flood-control dispatching chart and the number of inflection points of each dispatching line, obtaining the total number of optimization variables required by the general flood-control dispatching chart; according to the determined objective function and the optimization variables, carrying out optimization calculation through an NSGA-II algorithm, and carrying out Pareto non-dominated solution analysis on the objective function to obtain an optimized general flood-control dispatching chart; and carrying out flood control service calculation through the optimized general flood-control dispatching chart. Reservoir flood-season dispatching with the general flood-control dispatching chart being introduced can make full use of incoming water of a reservoir while ensuring safety of downstream flood control, thereby improving flood utilization efficiency, and meanwhile, improving solution efficiency of an optimization model.

Description

technical field [0001] The invention relates to the technical field of flood control dispatching of reservoirs, in particular to an optimization method for flood control dispatching of reservoirs based on adaptive control of flood control dispatching data. Background technique [0002] Reservoir flood control scheduling refers to the use of the reservoir's regulating and storage capacity by human beings to store and discharge the inflow runoff in a planned way according to the inflow and storage conditions of the reservoir, and on the premise of ensuring the safety of the reservoir itself and downstream flood control, so as to achieve benefits and eliminate harms. To ensure the safety of people's lives and property and the smooth development of the national economy. At present, traditional reservoir flood control often adopts the method of limiting the reservoir capacity to the flood-limited water level during the flood season. However, the flood regulation flow during the f...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G05B13/04
CPCG05B13/042
Inventor 廖卫红雷晓辉张利敏张云辉田雨权锦殷兆凯蒋云钟王明元
Owner CHINA INST OF WATER RESOURCES & HYDROPOWER RES
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products