Cold plateau earth and rockfill dam slope protection structure and construction method thereof

A construction method and technology of earth-rock dams, applied in the direction of coastline protection, etc., can solve the problems of earth-rock dam slope protection damage, poor anti-frost heave effect, increased maintenance costs, etc. The effect of small swelling deformation

CN106930234AInactive Publication Date: 2017-07-07NANJING HYDRAULIC RES INST
4 Cites 2 Cited by

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Publication Date
2017-07-07
Estimated Expiration
Not applicable · inactive patent

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
Patent Text Reader

Abstract

The invention provides a cold plateau earth and rockfill dam slope protection structure. Three anti-frostbite swelling structures are arranged along a dam body and include a cast-in-place concrete structure paved at the dam bottom, a reinforced concrete wall structure poured and embedded at the position of a dam slope and a grouted rubble structure paved at the dam top; the reinforced concrete wall structure is a reinforced concrete wall body, reinforcing steel bars are embedded in the top of the reinforced concrete wall body, and a galvanized steel sheet is fixedly arranged on the surface of the top of the reinforced concrete wall body. The cold plateau earth and rockfill dam slope protection structure has the beneficial effects that the slope protection anti-frostbite swelling structures are optimized, and the anti-frostbite swelling effect is achieved through different structural manners; and compared with a conventional earth and rockfill dam anti-frostbite swelling structure, non-uniform frostbite swelling deformation is small, the ice pushing and ice pulling resistance capacity is high, and the anti-frostbite swelling effect is good. The invention further provides a construction method of the cold plateau earth and rockfill dam slope protection structure.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The invention relates to the field of water conservancy and hydropower engineering, and more specifically relates to a slope protection structure of an earth-rock dam in an alpine region and a construction method thereof. swelling effect. Background technique

[0002] Frost heave failure of earth-rock dam slope protection is a common problem in water conservancy and hydropower projects in cold regions. The earth-rock dam slope protection will produce frost heave deformation and ice pull damage under the action of negative temperature in winter. In spring, the temperature rises to make it melt and cause thawing deformation. In spring, ice thrust is generated under the action of wind and waves. Earth-rock dam slope protection will cause damage.

[0003] In the prior art, the anti-seepage and anti-frost heave structure is single, and the anti-frost heave effect is poor, and the slope protection of the earth-rock dam is damaged through repeated freezing ...

Examples

Embodiment Construction

[0031] The technical solutions of the present invention will be further described below through specific examples.

[0032] Such as figure 1 , figure 2 Shown is a slope protection structure for an earth-rock dam in an alpine region. The dam body 1 is composed of a dam bottom, a dam slope, and a dam crest, and three anti-frost heave structures are distributed along the dam body 1. The arc-shaped cast-in-place concrete structure at the bottom, the reinforced concrete wall structure poured and buried at the dam slope, and the mortar masonry structure laid on the top of the dam, the cast-in-place concrete structure, the reinforced concrete wall structure, and the mortar masonry structure The outer surface of the structure is on the same plane, the reinforced concrete wall structure is a reinforced concrete wall 2, the top of the reinforced concrete wall 2 is embedded with steel bars 3, and the top surface of the reinforced concrete wall 2 is fixed with a galvanized steel plate 7...