method for optimizing tunnel construction based on improved Topsis method
A technology for tunnel construction and planning, applied in the direction of instruments, data processing applications, forecasting, etc., can solve problems such as lack, strong subjectivity, and inability to fully consider the relationship
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0154] 1. Data source
[0155] In this embodiment, Qinhuangdao Laolongtou Highway Tunnel is taken as the research background, and the deformation dimensions of each evaluation index corresponding to each construction method are obtained through large-scale finite element software ANSYS calculation and related monitoring data, as shown in Table 2.
[0156] Table 2 Construction methods and corresponding requirements
[0157]
[0158] 2. Determine the weight
[0159] (1) AHP method. The AHP method is used to determine the subjective weight of each evaluation index. It establishes a hierarchical structure based on 7 evaluation indicators of tunnel deformation, constructs a judgment matrix of evaluation indicators, and conducts a consistency check at the same time, and then obtains the subjective weight W of each evaluation indicator. 1 (j), where j=1, 2...7.
[0160] ① Establish a judgment matrix A based on the elements of each layer (k) .
[0161] The value of the judgme...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com