Method for analyzing overflow leakage early-warning trend during trip-out operation and trip-in operation of well drilling
A technology of trend analysis and overflow, applied in wellbore/well components, earthwork drilling, measurement, etc., can solve problems such as untimely and complex calculations
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0068] Such as Figure 1~3 As shown, the method for performing early warning trend analysis of overflow and leakage during drilling and tripping operations provided in this embodiment may, but is not limited to, include the following steps.
[0069] S101. Obtain the actual grouting amount after each string of drill pipes is pulled out, and calculate the grouting difference of each string of drill rods according to the following formula: grouting difference Δ=actual grouting amount−theoretical grouting amount.
[0070] In the step S101, as figure 1 As shown, when drilling and tripping, it can be based on image 3 The workflow shown enables the signal acquisition controller 7 to automatically identify and judge a series of tripping actions such as the state of pulling out of the drill and unblocking, the degree of lifting, the lifting of the position, and the jamming, so that the drill pipe can be automatically counted when it is lifted to the position number of bars. Optimal...
Embodiment 2
[0085] Such as figure 1 with 4 As shown in ~ 5, this embodiment provides a method with the same inventive concept as the technical solution of Embodiment 1 and performing overflow and leakage early warning trend analysis during drilling operations, which may but not be limited to include the following steps.
[0086] S601. Obtain the actual displacement of each column of drill pipe after running in, and calculate the difference in drainage of each string of drill pipe according to the following formula:
[0087] In the step S601, as figure 1 As shown, when drilling downhole, it can be based on Figure 5 The workflow shown enables the signal acquisition controller 7 to automatically identify and judge a series of drilling actions such as the state of drilling and unblocking, lowering height, lowering to the position, and sitting stuck, so that the number of drill pipe strings can be automatically counted when the lowering is in place. Optimally, in the step S601, it is pos...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


