The invention provides a method of using high-pressure water injection to prevent and treat gas
coal dust, and relates to a method of using
coal seam water injection to prevent and treat the gas
coal dust. The method comprises the steps of constructing a
bedding drainage borehole, inserting a drainage tube into the borehole, sealing a hole sealing section of the borehole, and beginning to conduct drainage of the gas in the coal seam; regarding a second borehole as a water injection hole, dismantling a second drainage pipeline and a second
orifice plate flowmeter which are connected to the second drainage tube, and inserting an expansion hole packer into the second drainage tube; connecting the expansion hole packer with a high-pressure valve, a water injection flowmeter, a high-pressure water
injection pump and an underground
water supply pipe sequentially through a high-pressure rubber hose; utilizing the high-pressure water
injection pump to inject water into a second borehole implement coal seam; turning off the high-pressure valve. According to the method, injection-drainage boreholes are utilized to alternately arrange and implement the coal seam water injection, the gas
drainage amount of adjacent drainage boreholes can be increased, the gas gushing amount during digging is reduced, the
water content of the coal seam is increased, the dust concentration during digging is reduced, the
working environment of working staff is improved, and mine gas
coal dust disasters are effectively prevented and treated.