A building supply chain management method based on a 4D building information model and RFID

A supply chain management and supply chain technology, applied in data processing applications, instruments, logistics, etc., can solve problems such as effective, difficult construction supply chain management, and discontinuous construction supply chain.

Inactive Publication Date: 2019-05-31
HKUST SHENZHEN RES INST +1
View PDF0 Cites 3 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] With the development of the construction industry, the idea of ​​supply chain management originally derived from the manufacturing industry was introduced into the construction industry, forming Construction Supply Chain Management (CSCM for short). Design and construction are separated, and its construction supply chain is discontinuous and scattered, making it difficult for construction supply chain management to be as effective as manufacturing

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0037] The embodiment of the present invention provides a construction supply chain management method based on 4D BIM and RFID, which is suitable for execution by a system composed of 4DBIM and RFID. The method may include:

[0038] From the preset 4D BIM system, obtain the information of the construction project to be tested at the construction site (for example: a real estate) and the information of the supplier providing building materials for the construction project to be tested. The information of the construction project to be tested includes: the building of the construction project to be tested The demand information of materials (referred to as building materials), the on-site inventory information of building materials, and the information of the start time plan, and the supplier information includes: the types and prices of building materials supplied.

[0039] In this embodiment, in the preset 4D BIM system, information on the construction project to be tested and ...

Embodiment 2

[0085] An embodiment of the present invention provides a construction supply chain management device based on 4D BIM and RFID, which adopts the construction supply chain management method described in Embodiment 1, and the device may include: an acquisition module 100, a construction module 200, a processing Module 300.

[0086] The obtaining module 100 is used to obtain the information of the construction project to be tested at the construction site (for example: a real estate) and the supplier of building materials for the construction project to be tested from the preset 4D BIM system. The construction project information to be tested includes: The demand information of building materials (referred to as building materials) of the construction project to be tested, the on-site inventory information of building materials, and the start time plan information, and the supplier information include: the types and prices of building materials supplied.

[0087] In this embodimen...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a building supply chain management method and device based on 4D BIM and RFID. The method comprises: acquiring to-be-tested construction project information at a construction site and supplier information for providing building materials for a to-be-tested construction project from a preset 4D BIM system; Obtaining the delivery distance between the supplier and the construction site from a preset RFID system, the delivery distance being used for calculating the delivery cost of each supplier; constructing a first supply chain cost model of a construction project to be tested by considering the delivery cost of building materials, the ordering cost of the building materials, the price cost of the building materials and the on-site inventory cost of the building materials; And calculating the optimal supply chain cost of the first supply chain cost model, and selecting a supplier conforming to the construction project to be tested and a corresponding supply quantity. The method provided by the invention can effectively solve the problems of reasonable selection of suppliers and orders thereof in the CSCM and reasonable construction of the collection and distribution center, and has high practicability.

Description

technical field [0001] The invention relates to the technical field of construction supply chain management, in particular to a construction supply chain management method and device based on 4D BIM and RFID. Background technique [0002] Supply Chain Management (Supply Chain Management, referred to as "SCM") is an integrated management idea and method. Its basic idea is to identify the interdependence between supply chains and improve the supply chain by optimizing inventory, cost performance. [0003] With the development of the construction industry, the idea of ​​supply chain management originally derived from the manufacturing industry was introduced into the construction industry, forming Construction Supply Chain Management (CSCM for short). Design and construction are separated, and its construction supply chain is discontinuous and scattered, making it difficult for construction supply chain management to be as effective as manufacturing. [0004] Therefore, it is...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/08G06Q10/10G06Q50/08
Inventor 邓逸川郑展鹏甘杰龙
Owner HKUST SHENZHEN RES INST
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products