Patents
Literature
Patsnap Copilot is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Patsnap Copilot

47results about How to "Solve the problem of site selection" patented technology

Chance constraint planning based optimal configuration method of distributed energy source

The invention provides a chance constraint planning based optimal configuration method of a distributed energy source. The method comprises the following steps of building a comprehensive optimal configuration model of the distributed energy source; determining a chance constraint condition of the comprehensive optimal configuration model of the disturbed energy source; determining an energy storage system configuration principle of the comprehensive optimal configuration module of the distributed energy source; and figuring out the comprehensive optimal configuration model of the distributed energy source. With the method proposed by the invention, the acceptable capability of a power distribution net on the distrusted energy source is effectively improved, the energy efficiency target and the low carbon target of a planning scheme can be met, economic requirement also can be met, the problems of site selection and constant volume of the distributed energy sources in places with different resource levels and economic development degrees can be solved, the application of the distributed energy source at a large scale is ensured, and the environmental pollution and energy crisis caused by fossil energy can be effectively relieved.
Owner:CHINA ELECTRIC POWER RES INST +1

Distributed power supply access power distribution network planning method

The present invention discloses a distributed power supply access power distribution network planning method. The method comprises: establishing the power distribution network extension planning model of a distributed power supply, wherein the power distribution network extension planning model is a mathematic model for the line operation cost, the distributed power supply construction cost and the purchasing electricity cost reduced through the reduction of the access of the distributed power supply, employing a genetic algorithm for solution, employing the adaptive genetic algorithm for planning of the distributed power supply, employing the genetic algorithm for extension planning of the network aiming at the individual of distributed power supply capacity and position generated by each generation in the genetic algorithm, adding the influence of the distributed power supply, and repairing non-feasible solution generated by the intersection and mutation operation in the genetic algorithm, and performing economic evaluation of the integrated planning result of the distributed power supply and the network. According to the actual condition of the distribution network structure and the capacity and the distribution position of the distributed power supply, and the problems of the planning of the distribution network, the site selection and the constant volume of the transformer station and the site selection of the distributed power supply are solved through adoption of the appropriate algorithm.
Owner:HUAIBEI POWER SUPPLY COMPANY OF STATE GRID ANHUI ELECTRIC POWER +1

Electric vehicle energy service station based on SOFC, and running control method thereof

The invention provides an electric vehicle energy service station based on SOFC, which relates to the technical field of new energy application, and comprises a fuel supply sub-system for supplying natural gas, water and air to a power generating sub-system and supplying water to a hydrogen producing sub-system; a power generating sub-system, with a part being supplied to the hydrogen producing sub-system and the other part being supplied to a charging and hydrogen adding sub-system to charge the vehicle; the hydrogen producing sub-system, with one part being supplied to the power generating sub-system when necessary and the other part being supplied to the charging and hydrogen adding sub-system to add hydrogen to the vehicle; a control sub-system, including a central control module, which controls other sub-systems to execute corresponding operations through a bus; the charging and hydrogen adding sub-system, for providing a port for charging vehicle and adding hydrogen. The invention is advantageous in that in areas where land resources are tight, problems of selecting location for charging stations or hydrogen-adding stations and land utilization can be resolved; the energy comprehensive resolution for electrical vehicles is provided. The invention also discloses a running control method of the service station.
Owner:SICHUAN ENERGY INTERNET RES INST TSINGHUA UNIV

Multiport unified power quality conditioner (UPQC) applied to active power distribution network and method

The invention discloses a multiport unified power quality conditioner (UPQC) applied to an active power distribution network and a method. A dynamic voltage restorer is arranged at a bus connection line for connecting adjacent buses; in multiple lines connected with the buses, the head end of each line is serially connected with a corresponding dynamic voltage restorer; each dynamic voltage restorer is in parallel connection with a DC link capacitor; one bus is connected with an active power filter, and the active power filter is connected with the dynamic voltage restorer for providing active power support for each dynamic voltage restorer; the dynamic voltage restorers at the lines comprehensively restore fall or temporary rise of voltage at each node; when transformers operate in a banked mode, output of the transformers is balanced via the dynamic voltage restorers at the bus connection lines; and the multiport unified power quality conditioner can be directly arranged inside a substation. The UPQC can effectively realize control on voltage deviation of each node of the line, power balancing when the transformers operate in a banked mode can be realized, and effective banked operation can be ensured.
Owner:JINING POWER SUPPLY CO OF STATE GRID SHANDONG ELECTRIC POWER CO +1

Small and medium-sized airport site selection and layout method under comprehensive traffic and transportation system

The invention provides a small and medium airport site selection and layout method under a comprehensive traffic and transportation system, which comprises the following steps of: defining a multi-airport system region boundary, then establishing a traffic correlation degree model, and carrying out traffic region division on a multi-airport system region; establishing a passenger flow index system, performing reduction on the passenger flow index system, then constructing a neural network model, and predicting the total outward travel amount of each traffic area; introducing a foreground theory, using a Bayesian network to correct a traditional discrete selection model to obtain a civil aviation travel sharing rate; constructing a node importance index system for the nodes of the traffic transportation network based on the airports of the multi-airport system area; and after fuzzy mathematics and clustering analysis are introduced, obtaining an alternative scheme set of the airport site through screening, and establishing an airport layout mathematical model based on the alternative scheme set and the civil aviation travel passenger flow volume to obtain the optimal site selection of the airport. According to the method, based on competition and coordination among airports in a multi-airport system and competition and coordination between civil aviation and other transportation modes, site selection and layout of small and medium-sized airports are achieved.
Owner:CIVIL AVIATION FLIGHT UNIV OF CHINA

Miniaturized multi-system multi-band fusion base station antenna

PendingCN110994201ASmall antenna sizeSolve the problem of base station locationAntenna supports/mountingsRadiating elements structural formsHigh frequency radiationBase station antennas
The invention belongs to the technical field of base station antennas, and especially relates to a miniaturized multi-system multi-band fusion base station antenna. The antenna comprises a bottom plate, and a reflecting plate I and a reflecting plate II are respectively arranged on two long edges of the bottom plate; a reflecting plate III is arranged on one short edge of the bottom plate; the bottom plate is provided with a first high-frequency radiation antenna array, a third high-frequency radiation antenna array, a first low-frequency radiation antenna array, a fifth high-frequency radiation antenna array, a sixth high-frequency radiation antenna array, a second low-frequency radiation antenna array, a fourth high-frequency radiation antenna array and a second high-frequency radiationantenna array which are sequentially arranged in the direction from the first reflecting plate to the second reflecting plate. Each array comprises a plurality of high-frequency oscillators I, high-frequency oscillators II, high-frequency oscillators III, high-frequency oscillators IV, high-frequency oscillators V, high-frequency oscillators VI, low-frequency oscillators I and low-frequency oscillators II which are arrayed into a straight line; and first long isolation strips are arranged between the first high-frequency radiation antenna array and the third high-frequency radiation antenna array and between the fourth high-frequency radiation antenna array and the second high-frequency radiation antenna array.
Owner:江苏泰科微通讯科技有限公司

Logistics node layout optimization method and system based on agricultural product cold-chain logistics requirements

The invention discloses a logistics node layout optimization method and system based on agricultural product cold-chain logistics demands. The method comprises steps of carrying out the variable screening of the obtained agricultural product cold-chain logistics basic data in a historical time range of a to-be-predicted region, and screening a plurality of variables; predicting each variable to obtain predicted values of all the variables; obtaining a first agricultural product cold-chain logistics demand prediction value based on all variable prediction values and the multiple linear regression model; obtaining a second agricultural product cold-chain logistics demand prediction value based on all variable prediction values and a pre-trained BP neural network; performing weighted summation on the first agricultural product cold-chain logistics demand prediction value and the second agricultural product cold-chain logistics demand prediction value to obtain a final agricultural productcold-chain logistics demand prediction value; and based on the final agricultural product cold-chain logistics demand prediction value of the to-be-predicted area, the scale of the existing logisticsnode and the distance between the existing logistics node and the to-be-predicted area, obtaining a scale optimization scheme of the logistics node.
Owner:SHANDONG UNIV OF FINANCE & ECONOMICS

Building supply chain management method and device thereof based on 4D BIM and GIS

InactiveCN108268962ASolve the problem of rational choiceSolve the problem of site selectionForecastingResourcesDelivery costPurchasing
The invention discloses a building supply chain management method and a device thereof based on 4D BIM and GIS. The method comprises the steps of acquiring to-be-tested construction project information at a construction position and information of a supplier who supplies construction materials to the to-be-tested construction project from a preset 4D BIM system; acquiring a cargo delivery distancebetween the supplier and the construction position in a preset GIS system, wherein the cargo delivery distance is used for calculating the cargo delivery cost of each supplier; constructing a first supply chain cost model of the to-be-tested construction project through considering the cargo delivery cost of the construction material, the purchasing cost of the construction material, the price cost of the building material and the field stock cost of the construction material; and selecting the supplier which accords with the to-be-tested construction project and the corresponding cargo supplying number through calculating the optimal supply chain cost of the first supply chain cost model. The building supply chain management method can effectively settle problems of reasonable selectionof the supplier and the order thereof in a CSCM and reasonable construction of a distribution center, and furthermore has high practicability.
Owner:HKUST SHENZHEN RES INST +1

Two-stage scheduling method for multi-period multi-product evanescent product supply chain network design

The invention relates to the technical field of evanescent supply chain networks, in particular to a two-stage scheduling method for multi-period multi-product evanescent supply chain network design.The method comprises a site selection model step, a configuration model formulating step based on the site selection model and a cyclic feedback program constructing step according to the site selection model and the configuration model. Aiming at the multi-period multi-product evanescent product supply chain network design problem, the invention provides a two-stage scheduling solving method, which comprises the following steps of: in the first stage, establishing a facility site selection model in the whole supply chain network on a strategic decision-making level; tactical configuration decision of the material configuration level is carried out in the second stage, so that a configuration model is established, and the site selection model and the configuration model are integrated intoone model for solving the site selection and configuration problems of suppliers, a mixed production inspection center, a mixed storage recovery center, a disposal and recycling center and retailers.
Owner:ZHEJIANG GONGSHANG UNIVERSITY

Underground nuclear power station with low and medium radioactive waste disposal system and disposal method thereof

The invention relates to the technical field of underground nuclear power plants, and discloses an underground nuclear power plant with a low-medium radioactive waste disposal system, which comprisesa power generation area and a waste disposal area, wherein the power generation area comprises a plurality of single-pile nuclear power systems, and each single-pile nuclear power system comprises a plurality of power plants, the waste disposal area comprises an SRTF site radioactive waste treatment facility which is connected with a power generation area traffic tunnel through a waste transfer tunnel, the bottom of the SRTF site radioactive waste treatment facility is provided with a discharge water tank communicated with a site waste water discharge system of the power generation area, the SRTF site waste discharge treatment facility is also connected with a low radioactive waste treatment tunnel, a medium radioactive waste disposal tunnel and a spent fuel dry storage area. The inventionfurther discloses a disposal method of the underground nuclear power station with the low-medium radioactive waste disposal system. According to the underground nuclear power station with the low-medium-radioactive waste disposal system and the disposal method thereof, the problem of site selection of the low-medium-radioactive disposal site is solved, meanwhile, the centralization of the waste disposal function is achieved, the excavation of a cave is reduced, and the problem of nuclear security in the process of outward transportation of radioactive waste is avoided.
Owner:CHANGJIANG SURVEY PLANNING DESIGN & RES

Multi-scene multi-commodity chain convenience store site selection optimization method in competitive environment

The invention discloses a multi-scene multi-commodity chain convenience store site selection optimization method in a competitive environment, and the method comprises the following steps: determiningthe constraint of a chain convenience store site selection problem for the consideration of the travel cost of enterprise commodity distribution and vehicle dispatching; describing a store site selection process of the consumer by using a random utility theory, and determining influence factors and specific parameters influencing decision making of the consumer; establishing a multi-commodity chain convenience store site selection model under the constraint of the store number, and maximizing the store area popularity of a convenience store enterprise; considering the influence of the consumer characteristic difference on the convenience store site selection strategy, and establishing a multi-commodity chain convenience store site selection model based on user portrait subdivision in twotypical scenes; designing a linearization conversion method of a target function, and converting the nonlinear site selection model into a mixed integer programming model; searching basic parameters of a to-be-selected site, a competitive storefront position, consumer demands and other site selection problems; and performing calculating to obtain the optimal site selection point and the corresponding store area popularity in various scenes.
Owner:BEIJING UNIV OF CHEM TECH

Method for predicting business scale of business hall by utilizing big data

InactiveCN105956721AEstimating the size of the businessSolve the problem of site selectionForecastingData predictionNo reference
The invention discloses a method for predicting the business scale of a business hall by using big data, which is characterized in that the method counts the number of users who change their business habits within each distance step after each new business hall is completed in history. The proportion of the total number of users within the step length. Based on these changes, it is predicted that when the new business hall is completed in the future, the proportion of the number of users who change their business habits within each distance step is predicted. Based on the total probability formula, the proportion of the number of people who will go to the new business hall is calculated. The number of people handling business in the business hall. After adopting the method of the invention, the business scale of the new business hall can be effectively estimated, thereby reasonably providing a basis for determining the investment in construction and operation of the new business hall. The invention solves the problem of site selection for a new business hall, and the problem that when the site is selected for a new business hall, there is no reference basis for the business scale, and mistakes in input lead to the problem that the business hall is too large to cause waste or too small to meet the needs of residents in the area.
Owner:NANJING LINYANG POWER TECH +1

Garbage land deployment modeling method based on urban population movement

PendingCN113869606AEfficient use ofCapacity load balancingForecastingResourcesOriginal dataData mining
The invention discloses a garbage land deployment modeling method based on urban population movement. The method comprises the following steps of: firstly, collecting and preprocessing population of community points and related data of garbage yield to obtain an original data set; then establishing a grey prediction model and introducing a multiple linear regression model to predict the garbage yield; and finally, according to the prediction result of the garbage yield, combining the garbage yield over the years in the original data set, carrying out capacity threshold evaluation on the garbage stations governing the community point, thus achieving effective utilization of the garbage stations and balanced capacity load. According to the method, the grey prediction model and the multiple regression model are combined, the prediction effect is improved, meanwhile, the prediction result and historical data are integrated to obtain capacity threshold evaluation, effective utilization of urban garbage station construction resources and capacity load balancing can be achieved, the garbage station site selection problem is well solved, and the environment influence caused by garbage treatment is avoided while the living requirements of residents in surrounding communities are met as much as possible.
Owner:NANJING UNIV OF POSTS & TELECOMM +1

Power system edge cloud data center site selection method and device, equipment and medium

The invention discloses an electric power system edge cloud data center site selection method and device, equipment and a medium. The method comprises the steps of acquiring electric power system siteinformation; modeling the power system station to obtain a station model; constructing a site selection optimization variable according to the site model; constructing a site selection cost objectivefunction according to the site model parameters and the site selection optimization variables; constructing a site selection constraint condition according to the site model parameters and the site selection optimization variable; linearizing the site selection cost objective function and the site selection constraint condition, and converting a site selection problem into a linearized problem; and solving the linearization problem to obtain the number of the edge cloud data centers, the site selection positions of the edge cloud data centers and a communication connection construction schemeso as to form a power system edge cloud data center optimization site selection scheme. The problem of site selection of the edge cloud data center for the power system service is solved, and the economy of operation and construction of the edge cloud data center can be effectively improved.
Owner:SOUTH CHINA UNIV OF TECH

Double-reactor T-shaped nuclear power plant group integrally provided with low-intermediate-level waste disposal field

The invention relates to the technical field of underground nuclear power plants, and discloses a double-reactor T-shaped nuclear power plant group integrally provided with a low-intermediate-level waste disposal field. The plant group comprises a disposal field, two reactor plant cavities and a combined plant cavity; the combined plant cavity comprises a safety plant, a fuel plant, a safety plantand a nuclear auxiliary plant which are sequentially arranged from outside to inside along the space of the underground cavity; the disposal field communicates with the nuclear auxiliary plant; eachof the reactor plant cavities is connected with an electric plant cavity and a pressure relief cavity; the reactor plant cavities, the electric plant cavities and the pressure relief cavity are all indouble-reactor T-shaped mirror arrangement with the axes of the combined plant cavity as a center; and the reactor plant cavities are both connected with fuel plant, the safety plants and the nuclearauxiliary plant. According to the double-reactor T-shaped nuclear power plant group integrally provided with the low-intermediate-level waste disposal field, the whole excavation amount of underground cavities is reduced, the problem of disposal of low-intermediate-level wastes after operation and decommissioning of nuclear power plants is solved, and whole economy is improved.
Owner:CHANGJIANG SURVEY PLANNING DESIGN & RES

A method for selecting a location for a mobile battery swapping device

The invention discloses a method for selecting a site for a mobile battery exchange device, comprising the following steps: dividing all roads in a road network into road sections, and calculating the actual length L of each road section ai ; Calculate the area AREA covered by the road network; Calculate the transportation demand parameter L of each road section bi ; Calculate the length L of each section i ;Calculate the average length L of all road segments C and the average length L d ; Using the annealing algorithm mode, with the average length L d As the basic resolution of road network nodes, the road network nodes are simplified; with the basic size L f As a zoning standard, the entire road network is divided into multiple sub-regional road networks; various practical factors are comprehensively considered to optimize and adjust the divided sub-regions, and the geometric center point of the sub-region is used as the reference point for regional power replacement operations for site selection. On the premise of low cost, the present invention realizes the preliminary screening function of the battery swap operation site of the mobile battery swap equipment, and solves the problem of location selection of the battery swap operation site which consumes the most computing power in the operation of the mobile battery swap equipment.
Owner:XIAMEN KING LONG UNITED AUTOMOTIVE IND CO LTD

An optimal allocation method for distributed energy resources based on chance-constrained programming

The invention provides a chance constraint planning based optimal configuration method of a distributed energy source. The method comprises the following steps of building a comprehensive optimal configuration model of the distributed energy source; determining a chance constraint condition of the comprehensive optimal configuration model of the disturbed energy source; determining an energy storage system configuration principle of the comprehensive optimal configuration module of the distributed energy source; and figuring out the comprehensive optimal configuration model of the distributed energy source. With the method proposed by the invention, the acceptable capability of a power distribution net on the distrusted energy source is effectively improved, the energy efficiency target and the low carbon target of a planning scheme can be met, economic requirement also can be met, the problems of site selection and constant volume of the distributed energy sources in places with different resource levels and economic development degrees can be solved, the application of the distributed energy source at a large scale is ensured, and the environmental pollution and energy crisis caused by fossil energy can be effectively relieved.
Owner:CHINA ELECTRIC POWER RES INST +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products