A kind of prestressed ground anchor and its method for segmental completion of horizontal well screen pipe

A prestressing and ground anchoring technology, which is applied in cementing, oil drilling, and well completion, can solve problems such as unsatisfactory effect of lifting and eliminating prestress, poor mechanical properties of loose sandstone, and insufficient safety and stability of the process, so as to improve the completion of wells. The effect of pulling the prestress, strengthening the anchoring effect, and improving the effect of the anchoring effect

Active Publication Date: 2022-05-10
DONGYING XIN HUALIAN PETROLEUM MACHINERY
View PDF7 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] 1. The screen completion process is mostly used in unconsolidated sandstone reservoirs that require thermal recovery of heavy oil. However, the cat claws of the above-mentioned prestressed ground anchor device have an unsatisfactory anchoring effect on unconsolidated sandstone. The prestressed ground anchor used in the above method The anchoring is carried out by piercing the anchor fluke into the well wall, but due to the poor physical and mechanical properties of loose sandstone, loose structure, low mechanical strength and other geological characteristics, the anchor flukes that play an anchoring role are prone to slippage, resulting in anchorage failure. Failure, in severe cases, may cause the anchoring layer to break, so the effect of lifting and eliminating prestress is not ideal, and the process is not safe and stable enough;

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A kind of prestressed ground anchor and its method for segmental completion of horizontal well screen pipe
  • A kind of prestressed ground anchor and its method for segmental completion of horizontal well screen pipe
  • A kind of prestressed ground anchor and its method for segmental completion of horizontal well screen pipe

Examples

Experimental program
Comparison scheme
Effect test

specific Embodiment approach

[0068] It should be noted that the structures, proportions, sizes, etc. shown in the drawings attached to this specification are only used to match the content disclosed in the specification, for those who are familiar with this technology to understand and read, and are not used to limit the implementation of the present invention Any modification of structure, change of proportional relationship or adjustment of size shall fall within the range covered by the technical content disclosed in the present invention without affecting the effect and purpose of the present invention. within range.

[0069] At the same time, terms such as "upper", "lower", "left", "right", "middle" and "one" quoted in this specification are only for the convenience of description and are not used to limit this specification. The practicable scope of the invention and the change or adjustment of its relative relationship shall also be regarded as the practicable scope of the present invention without...

Embodiment 1

[0071] combined with Figure 1-4 , a prestressed ground anchor, including a central tube 1 and a housing 2, a piston 3, a connecting ring 4, an anchor body 5 and a first stop ring 6 that are sequentially sleeved outside the central tube 1, the housing 2. The connecting ring 4 and the anchor body 5 form an annular cavity 7 with the central tube 1, and the piston 3 is slidably arranged in the annular cavity 7; The first through hole 11 communicating with the annular cavity 7; one end of the connecting ring 4 is fixedly connected with the housing 2, and the other end is radially slidingly connected with the anchor body 5; the anchor body 5 is composed of several anchors A body unit 51 is formed. Several anchor body units 51 are arranged in a circle and combined into a hollow ring through an elastic tightening ring 52. When the piston 3 moves downward, the anchor body 5 expands radially.

[0072] The inside of the anchor unit 51 is provided with a hollow chute 5104 communicating ...

Embodiment 2

[0080] This embodiment provides another kind of prestressed ground anchor. The structure of the anchor body unit 51 in Embodiment 1 is adjusted to make it more radially expandable and more adaptable. The adjusted technical solution is as follows:

[0081] combined with Figure 5-7 , the anchor body unit 51 is provided with a hollow chute 5104 communicating with the annular cavity 7, and a radially slidable sliding plate 5105 is provided in the hollow chute 5104, and the sliding plate 5105 faces the One side of the outer wall of the anchor unit 51 is provided with an anchor fluke 5107, and the outer wall of the anchor unit 51 is provided with a second through hole 5108 through which the anchor fluke 5107 protrudes; in the initial state, the anchor fluke 5107 accommodates In the hollow chute 5104; in the anchored state, the anchor claw 5107 protrudes from the outer wall of the anchor unit 51; the outer wall of the anchor unit 51 is provided with a tightening ring groove 5113, t...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to the technical fields of oil drilling, well cementing and well completion, in particular to a prestressed ground anchor and a method for segmental completion of horizontal well screen tubes. The housing, piston, connecting ring, anchor body and first limit ring arranged outside the central tube, the housing, connecting ring and anchor body form an annular cavity with the central tube, and the piston is slidably arranged in the annular cavity; the connecting ring One end is fixedly connected with the housing, and the other end is radially slidingly connected with the anchor body; the anchor body is composed of several anchor body units, which are arranged in a circle and combined into a hollow ring through an elastic tightening ring. When moving down, the anchor expands radially. The prestressed ground anchor provided by the present invention and the method for using the prestressed ground anchor to carry out horizontal well screen completion in sections have a wide application range and good anchoring effect, which ensures the casing prestressing effect when the prestressing force is pulled in the well completion. Fully released.

Description

technical field [0001] The invention relates to the technical fields of oil drilling, well cementing and well completion, in particular to a prestressed ground anchor and a method for segmented completion of horizontal well screen pipes. Background technique [0002] Heavy oil (heavy crude oil) refers to degassed crude oil with a viscosity of 100-10000mPas at the original reservoir temperature or a density of 0.9340-1.0000g / cm at 15.6°C and atmospheric pressure 3 , due to the high viscosity of heavy oil, the method of injecting high-temperature steam above 300°C is usually used for thermal recovery, so as to increase the production of heavy oil wells. Due to the influence of high-temperature steam, the casing in the well will be elongated and deformed, and the casing will go out of the wellhead, which will damage the cement sheath between the casing and the well wall, seriously affecting the production life of the oil well. In order to solve the above problems, prestressed ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Patents(China)
IPC IPC(8): E21B23/04E21B7/00E21B43/00E21B43/30E21B33/13E21B17/00
CPCE21B23/04E21B7/00E21B43/00E21B43/305E21B33/13E21B17/00
Inventor 李振华王富涛杨利强冀延民张天保李敬李佃波李妍慧
Owner DONGYING XIN HUALIAN PETROLEUM MACHINERY
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products