Progress display board for building construction management
A technology for building construction and display boards, which is applied to display devices, identification devices, signs, etc., can solve the problems of low role of auxiliary building construction management, content duplication and recognition, weakening construction efficiency, etc., to ensure balanced and efficient operation. Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0033] see also Figure 1- Figure 6 The invention provides a progress display board for building construction management, which is structurally composed of a scanning rack panel 1, a date display screen 2, a power plug terminal 3, a hanging lug plate 4, a digital display tube 5 and a display board shell 6, wherein the scanning rack panel 1 is installed on the left side of the display board shell 6 and is on the same vertical plane, and the date display screen 2 is inserted and embedded on the top of the scanning rack panel 1. There are three digital display tubes 5, all of which are installed on the right side of the scanning rack panel 1, the power supply plug-in terminal 3 is electrically connected with the scanning rack panel 1 and is located on the same vertical plane, the hanging lug plate 4 is inserted and embedded on the top of the display panel housing 6, and the scanning rack panel 1 is provided with a counter wheel frame 1A, a damping slider frame 1B, a potential scanning...
Embodiment 2
[0040] see also Figure 1- Figure 6 The present invention provides a progress display board for building construction management. Other aspects are the same as those of Embodiment 1, except that:
[0041] see also Figure 2 The truss turnover wheel 1D is composed of a deflection wheel groove 1D1 and a truss rod 1D2, which is mechanically connected with the truss rod 1D2. The deflection wheel groove 1D1 is installed on the front side of the truss rod 1D2 and is located on the same vertical plane. The deflection wheel groove 1D1 turns up and down at the center end of the truss rod 1D2 to simply indicate the effect that the workers turn up the plate to represent the end of the regional process and turn down the plate to indicate that the construction is still going on.
[0042] see also Figure 6 The deflector groove 1D1 is composed of an ellipsoidal counterweight 1D11, a jaw rod 1D12 and a deflector body 1D13, two jaw rods 1D12 are arranged and respectively inserted in the left and rig...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com