Distributed transaction method for multiple virtual power plants and load aggregators
A technology for load aggregators and virtual power plants, which is applied in sales/lease transactions, commerce, data processing applications, etc., and can solve problems such as high transaction costs, uneven resource allocation, privacy security, and information asymmetry
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0162] S1: The transaction period is 24 hours. The participants in the transaction are: 6 load aggregators (LA) and 5 virtual power plants (VPP). The transaction energy is electric energy. The relevant cost parameters of the virtual power plants are shown in Table 1. The time distribution table for participating in the bidding is shown in Table 2.
[0163] Table 1 Cost parameters of virtual power plant
[0164]
[0165]
[0166] In the table, a e and b e is the electricity production cost parameter.
[0167] Table 2 Time distribution of virtual power plants participating in bidding
[0168] time Virtual Power Plant 1 Virtual Power Plant 2 Virtual Power Plant 3 Virtual Power Plant 4 Virtual Power Plant 5 3:00-8:00 √ √ √ 9:00-14:00 √ √ √ √ 15:00-20:00 √ √ √ √ √ 21:00-2:00 √ √ √
[0169] The value function parameters of the load aggregator (LA) are shown in Table 3, and the time distribution table of the l...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com