[0162] S1: The transaction period is 24 hours. The participants in the transaction are: 6 load aggregators (LA) and 5 virtual power plants (VPP). The transaction energy is electric energy. The relevant cost parameters of the virtual power plants are shown in Table 1. The time distribution table for participating in the bidding is shown in Table 2.
[0163] Table 1 Cost parameters of virtual power plant
[0164]
[0165]
[0166] In the table, a e and b e is the electricity production cost parameter.
[0167] Table 2 Time distribution of virtual power plants participating in bidding
[0168] time Virtual Power Plant 1 Virtual Power Plant 2 Virtual Power Plant 3 Virtual Power Plant 4 Virtual Power Plant 5 3:00-8:00 √ √ √ 9:00-14:00 √ √ √ √ 15:00-20:00 √ √ √ √ √ 21:00-2:00 √ √ √
[0169] The value function parameters of the load aggregator (LA) are shown in Table 3, and the time distribution table of the l...