Construction method for green exploration groove in low mountain and hill areas
A construction method and technology for hills, applied in the field of geological exploration, can solve problems such as poor repair effect and soil layer damage, and achieve good protection effect.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0029] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0030] see Figure 1-6 , the present invention provides a technical solution: a construction method for green exploration trenches in low mountain and hilly areas, comprising the following steps:
[0031] Step 1. Enter the exploration area, select the trench construction site, transport the drilling equipment and landfill equipment in place, first look for the prospecting projects and mine pits left by the predecessors for secondary cleaning and cataloging, an...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com