Looking for breakthrough ideas for innovation challenges? Try Patsnap Eureka!

Building monitoring method based on BIM

A technology of architecture and ancient buildings, applied in the field of BIM-based building monitoring, can solve the problems of inability to distinguish C/S architecture, inability to monitor a large number of quantities in time, and BIM's inability to provide support for the full life cycle management of engineering projects, etc., to achieve real-time The effect of data monitoring

Pending Publication Date: 2021-12-03
苏州上应科技有限公司
View PDF0 Cites 6 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The purpose of the present invention is to provide a BIM-based building monitoring method, which has the advantages that BIM can provide support for the whole life cycle management of engineering projects, can be distinguished from the current mainstream C / S architecture, and can monitor a large number of quantities in time. It solves the problem that BIM cannot provide support for the full life cycle management of engineering projects, nor can it be distinguished from the current mainstream C / S architecture, and cannot monitor a large number of quantities in time

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0039]The platform maintenance management module manages and maintains the platform system, including the management of platform user accounts, the management of permissions and modules, and the recording of platform operation error logs. The construction of the target building is carried out according to the construction drawings of the building construction, and during the construction process In the construction site, the construction data of the constructed part is collected, the building construction drawing is constructed, and a vertical central axis is set for the target building according to the construction drawing, and the BIM model of the target building is constructed in the computer, BIM model data management module, data structure conversion in Json format for ancient building models generated by digital point cloud and close-range photogrammetry technology, BIM data modeling and analysis module, import of BIM model and surrounding site models, model on the web pla...

Embodiment 2

[0041] The platform maintenance management module manages and maintains the platform system, including the management of platform user accounts, the management of permissions and modules, and the recording of platform operation error logs. The construction of the target building is carried out according to the construction drawings of the building construction, and during the construction process In the construction site, the construction data of the constructed part is collected, the building construction drawing is constructed, and a vertical central axis is set for the target building according to the construction drawing, and the BIM model of the target building is constructed in the computer, BIM model data management module, data structure conversion in Json format for ancient building models generated by digital point cloud and close-range photogrammetry technology, BIM data modeling and analysis module, import of BIM model and surrounding site models, model on the web pl...

Embodiment 3

[0043] The platform maintenance management module manages and maintains the platform system, including the management of platform user accounts, the management of permissions and modules, and the recording of platform operation error logs. The construction of the target building is carried out according to the construction drawings of the building construction, and during the construction process In the construction site, the construction data of the constructed part is collected, the building construction drawing is constructed, and a vertical central axis is set for the target building according to the construction drawing, and the BIM model of the target building is constructed in the computer, BIM model data management module, data structure conversion in Json format for ancient building models generated by digital point cloud and close-range photogrammetry technology, BIM data modeling and analysis module, import of BIM model and surrounding site models, model on the web pl...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a building monitoring method based on BIM. The method comprises the following steps that: a platform maintenance management module carries out management and maintenance of a platform system, including the management of platform user accounts, the management of authority and modules, and the recording of a platform operation error log; the construction of a target building is carried out according to a construction drawing of building construction, and in the construction process, building data of a constructed part are collected on a building construction site; and a building construction drawing is constructed, and a vertical center shaft is erected for the target building according to the constructed construction drawing. According to the method, a BIM model lightweight display method is explored by forming a BIM-based whole-process historic building protection standard and method, construction and monitoring management of historic building engineering projects are realized, the method is different from a current mainstream C / S architecture, a complex historic building engineering BIM platform based on a B / S architecture is established, real-time data monitoring of historic buildings is realized, and powerful technical guarantee is provided for smooth completion of historic building engineering.

Description

technical field [0001] The invention relates to the technical field of building construction, in particular to a BIM-based building monitoring method. Background technique [0002] The whole-process ancient building protection supervision platform based on BIM is a software platform developed based on the standards and methods of the whole-process ancient building protection based on BIM technology, which is applied to the whole process of ancient building protection design, construction, monitoring and management. [0003] In the existing construction supervision methods, engineering and technical personnel make judgments based on the collected construction information and construction experience. The results of this manual judgment often have large deviations, and the final countermeasures are often not Best of all, BIM cannot provide support for the full life cycle management of engineering projects, nor can it be distinguished from the current mainstream C / S architecture...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): G06Q10/06G06Q50/08G06F30/13G06F30/23
CPCG06Q10/06G06Q50/08G06F30/13G06F30/23
Inventor 董文澎
Owner 苏州上应科技有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products