Maintenance device and method for road inspection well and road surface around well
A technology for inspection wells and roads, which is applied in the directions of roads, roads, and road repair, etc., can solve the problems of adding prefabricated structures and substructures, as well as the integrity of new and old pavement structures, low efficiency, and poor maintenance quality of inspection wells and surrounding roads. , to achieve good physical and chemical properties, reduce the cost of use, reduce settlement and structural damage
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0045]In a typical embodiment of the present invention, such as Figure 1-Figure 9 As shown, a maintenance device for road inspection wells and pavement around wells is proposed, including: a prefabricated reinforced concrete structure layer 6 (ie, the second structure layer) and a prefabricated fiber composite modified asphalt concrete structure layer 5 (ie, the first a structural layer).
[0046] The reinforced concrete structure layer is a cement concrete structure with continuous reinforcement, which is the main load-bearing part of the vehicle load. The main function of the fiber composite modified asphalt concrete structure layer is to ensure the driving comfort of the inspection well and the road around the well.
[0047] The reinforced concrete structure layer is located at the lower part of the fiber composite modified asphalt concrete structure layer, which are produced in the factory according to the design size, and the two form a prefabricated structure for the ma...
Embodiment 2
[0091] This embodiment proposes a method for using a maintenance device for road inspection wells and road surfaces around the wells, specifically as follows:
[0092] Step 1: Carry out disease range detection on the inspection wells and pavement around the wells that need to be maintained, and provide data support for selecting the size of the assembled structure of the inspection wells and the pavement around the wells;
[0093] Step 2: On the basis of the data obtained in Step 1, prepare prefabricated blocks of road inspection wells and pavement prefabricated structures around the wells with suitable dimensions in the factory and transport them to the construction site;
[0094] Step 3: Use a milling machine to mill the pavement around the well. The milling radius is slightly larger than the radius of the prefabricated block in step 2, so as to facilitate the installation of the prefabricated block;
[0095] Step 4: After the milling is completed, remove the road waste, tri...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com