Unlock instant, AI-driven research and patent intelligence for your innovation.

BIM construction work amount simulation management method and system, equipment and storage medium

A technology of engineering quantity and construction stage, applied in data processing applications, special data processing applications, instruments, etc., can solve problems such as incomplete consideration

Pending Publication Date: 2022-01-14
北京金河水务建设集团有限公司
View PDF0 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] In order to solve the problem of incomplete consideration in the early stage of construction, this application provides a BIM construction engineering quantity simulation management method, system, equipment and storage medium

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • BIM construction work amount simulation management method and system, equipment and storage medium
  • BIM construction work amount simulation management method and system, equipment and storage medium
  • BIM construction work amount simulation management method and system, equipment and storage medium

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0041] In order to make the purpose, technical solutions and advantages of the embodiments of the present application clearer, the technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application.

[0042] On the one hand, this application provides a BIM construction quantity simulation management method, referring to figure 1 , the method includes the following steps:

[0043] Step S110: Acquiring the total construction quantity, construction time and construction location information.

[0044] Step S120: Use BIM to simulate multiple construction stages according to the total construction quantity and construction time, and determine the resource demand, time nodes and procedures of each construction stage.

[0045] Step S130: Determine the raw material information, equipment information, transportation information, and personnel information of each ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention provides a BIM construction work amount simulation management method and system, equipment and a storage medium, and relates to the technical field of building construction work amount management. The method comprises the following steps: acquiring total construction work amount, construction time and construction position information; simulating a plurality of construction stages by utilizing BIM according to the total construction work amount and the construction time, and determining the resource demand quantity, the time node and the working procedure of each construction stage; determining raw material information, equipment information, transportation information and personnel information of each construction stage according to the construction position information, the resource demand quantity of each construction stage, the time node and the working procedure; assigning the raw material information, the equipment information, the transportation information and the personnel information to a three-dimensional model built by using the BIM; and guiding construction according to the three-dimensional model assigned the information. In this way, the problem that consideration is not comprehensive in the early stage of construction can be solved.

Description

technical field [0001] The present application relates to the technical field of building construction quantity management, and in particular to a BIM construction quantity simulation management method, system, equipment and storage medium. Background technique [0002] Building construction has the characteristics of complexity, large resource consumption, many processes, and the need for mutual cooperation between processes. Therefore, it is necessary to simulate and plan the construction quantity in the early stage of construction. However, when using the existing planning methods to plan the construction quantity, There are often many problems in the construction process due to incomplete consideration in the early stage, which will affect the construction process and cause waste of resources. Contents of the invention [0003] In order to solve the problem of incomplete consideration in the early stage of construction, this application provides a BIM construction engi...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06Q10/06G06Q50/08G06F30/13
CPCG06Q10/06316G06Q10/06315G06Q10/06313G06Q50/08G06F30/13
Inventor 王梓任刘松宇于定章魏云鹏赵凯宁乔桂鑫张朔鑫高宁高启龙戴葱葱
Owner 北京金河水务建设集团有限公司
Features
  • R&D
  • Intellectual Property
  • Life Sciences
  • Materials
  • Tech Scout
Why Patsnap Eureka
  • Unparalleled Data Quality
  • Higher Quality Content
  • 60% Fewer Hallucinations
Social media
Patsnap Eureka Blog
Learn More