BIM construction work amount simulation management method and system, equipment and storage medium
A technology of engineering quantity and construction stage, applied in data processing applications, special data processing applications, instruments, etc., can solve problems such as incomplete consideration
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0041] In order to make the purpose, technical solutions and advantages of the embodiments of the present application clearer, the technical solutions in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application.
[0042] On the one hand, this application provides a BIM construction quantity simulation management method, referring to figure 1 , the method includes the following steps:
[0043] Step S110: Acquiring the total construction quantity, construction time and construction location information.
[0044] Step S120: Use BIM to simulate multiple construction stages according to the total construction quantity and construction time, and determine the resource demand, time nodes and procedures of each construction stage.
[0045] Step S130: Determine the raw material information, equipment information, transportation information, and personnel information of each ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com



