Mobile Modular Muck Handling System
By deploying a movable modular slag processing system at the underground construction site to process shield slag in real time, the problem of environmental pollution and high costs caused by ground stacking is solved, and low-cost, pollution-free slag treatment is achieved.
Patent Information
- Application Number
- CN202111670534.1
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2021-12-31
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2041-12-31
AI Technical Summary
Existing technologies have problems with environmental pollution and high processing costs when dealing with shield dregs generated in underground construction projects, and require occupying a large amount of ground space.
Provide a movable modular muck treatment system, including muck conveying device, screening device, dehydration device, filter press device and control device, which can handle muck in real time during underground construction, avoid ground stacking, and control through automation Achieve low-cost, pollution-free treatment.
It realizes real-time processing of underground muck, reduces the occupation of ground working space, reduces operating costs, improves processing efficiency, has no environmental pollution, is simple to operate, safe and reliable.
Smart Images

Figure CN114148772B_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of engineering waste treatment, and relates to shield engineering waste soil treatment equipment, and specifically, to a movable modular slag treatment system, which is mainly used for the treatment of slag in subway shield or tunnel excavation or urban pipe gallery construction projects. Background Art
[0002] With the development of science and technology, the construction of a modern infrastructure system has become an inevitable trend of social development. As an important part of the modern infrastructure system, underground construction projects such as subways, tunnels, and urban pipe corridors are in increasing demand. During the construction of underground projects such as subways and tunnels, a large amount of slag will be generated during the excavation process. The shield slag contains a large amount of stones and crushed sand, so it is extremely inconvenient to handle. When handling these slags, they must first be transported to the ground for stacking. Stacking these slags requires a lot of space and will affect the surrounding environment. In the prior art, the commonly used processing methods are:
[0003] (1) Directly transporting the shield excavation waste to a storage site for storage without any treatment. This treatment method, on the one hand, will occupy a large amount of storage space, reducing the land available for human use; on the other hand, the shield excavation waste needs to be transported from the construction site to the storage site, and it will be spilled during transportation. Since the shield excavation waste contains foaming agents, dispersants and other compounds that affect the ecological environment, it is easy to pollute the environment, and the transportation cost is high, and the economic benefits are poor.
[0004] (2) The slag is simply screened and then transported. This method, like the first method, will also take up a large amount of storage space and cause pollution during transportation and high transportation costs.
[0005] (3) The shield slag is slurried, and then the slag is separated. Finally, the treated slag is transported as raw materials for other industries or directly used as filler. This method has secondary pollution in the process of separating and treating the slag. For example, direct screening of the slag is prone to generate dust, and a large amount of wastewater is generated after slurry treatment, which has an adverse impact on the surrounding environment. In addition, a large amount of water resources are consumed in the slurry treatment, resulting in a waste of water resources.
[0006] The above treatment methods all involve first transporting the slag to the ground and then treating the slag. Due to the limited ground space in cities, this not only takes up space and pollutes the environment, but also has high treatment costs. Summary of the invention
[0007] In view of the above-mentioned problems in the existing underground construction project process, such as the environmental pollution caused by the accumulation of slag on the ground and the high cost of slag surface treatment, the present invention provides a movable modular slag treatment system, which can be carried out synchronously with the tunneling of the shield machine during the underground construction, so as to realize the real-time treatment of underground slag, without occupying the ground working space, with low operating cost and no environmental pollution.
[0008] In order to achieve the above object, the present invention provides a movable modular slag processing system, comprising:
[0009] The slag conveying device is placed at the slag outlet of the shield machine, and its front end is connected to the shield machine;
[0010] A screening device is connected to the slag conveying device, and its feed inlet is located below the discharge end of the slag output device;
[0011] Dehydration device, comprising:
[0012] A dewatering screen, the feed port of which is connected to a first slurry pump disposed in a sewage tank at the bottom of the screening device;
[0013] A buffer device is placed on the discharge end side of the dewatering screen and is connected to the lower water tank of the dewatering screen. A second slurry pump is provided in the buffer device;
[0014] A filter press device, the feed port of which is connected to the second slurry pump;
[0015] The continuous slag discharging device comprises a main slag discharging device and three auxiliary slag discharging devices with discharging ends arranged above the main slag discharging device. The front end of the main slag discharging device is flexibly connected to the shield machine. The feeding ends of the three auxiliary slag discharging devices are respectively arranged at the discharging port of the screening device, the discharging port of the dewatering screen, and the discharging port of the filter press device;
[0016] Three moving devices with the same structure cooperate with the track of the shield machine; the first moving device is arranged at the bottom of the screening device, and its front end is connected to the shield machine; the second moving device is arranged at the bottom of the dehydration device, and its front end is connected to the first moving device; the third moving device is arranged at the bottom of the filter press device, and its front end is connected to the second moving device.
[0017] Furthermore, it also includes a control device, which includes a controller, and the controller is electrically connected to the slag conveying device, the screening device, the dewatering screen, the first slag pump, the second slag pump, the filter press device, the main slag discharge device and the auxiliary slag discharge device respectively.
[0018] Preferably, the screening device comprises:
[0019] The drum screen is connected to the slag conveying device, and its feed port is located below the discharge end of the slag output device. A first slag pump is provided in the sewage tank at the bottom of the drum screen, and the first slag pump is connected to the dewatering screen through a first pipeline;
[0020] The spray mechanism is arranged above the drum screen;
[0021] The first clean water pump is arranged in the ground clean water tank and is connected with the spray mechanism through the second pipeline. The first clean water pump is electrically connected with the controller.
[0022] Preferably, the filter press device comprises:
[0023] A filter press is electrically connected to the controller, and its feed port is connected to the second slurry pump through a third pipeline;
[0024] A water receiving device is connected to the water outlet of the filter press, and is provided with a second clean water pump connected to the controller, and the second clean water pump is connected to the ground clean water tank through a fourth pipeline;
[0025] The dosing device has a dosing pipeline connected to the third pipeline.
[0026] Preferably, the dosing device includes a dosing container for containing medicine, a metering pump connected to the dosing container, a dosing pipeline connected to the metering pump, and a flow meter arranged on the third pipeline, the metering pump and the flow meter are electrically connected to the controller, and the dosing pipeline is directly connected to the third pipeline.
[0027] Preferably, the main slag discharge device comprises:
[0028] The material receiving belt conveyor comprises a support frame, a belt placed on the support frame, and a belt driving device connected to the belt. The front end of the support frame is flexibly connected to the shield machine, and the rear end of the support frame is a spliced structure formed by splicing a plurality of fixed brackets.
[0029] The belt storage bin is placed on the ground and is provided with a roller assembly and a power output device connected to the roller assembly. The belt of the material receiving belt conveyor is wound around the roller assembly.
[0030] The eccentric adjustment device is arranged on the support frames on both sides of the belt.
[0031] Preferably, the belt drive device includes a drive motor installed at the front end of the support frame and a belt roller connected to the drive motor, the drive motor is electrically connected to the controller, the belt roller shaft is connected to the front end of the support frame, and the belt is wrapped around the belt roller.
[0032] Preferably, the roller assembly comprises two symmetrically arranged sliding frames and a plurality of rollers mounted on the inclined surfaces of the sliding frames and arranged in parallel, and the sliding frames are connected to a power output device; and the eccentric adjustment device is a plurality of rollers arranged at intervals.
[0033] Furthermore, the main slag discharge device also includes a guide balancing device, which includes a sliding bracket rigidly connected to the sliding frame and a plurality of pulley rollers installed on the inclined surface of the sliding bracket. The outer diameter of the pulley roller is smaller than the outer diameter of the roller. The pulley roller is located between the upper and lower belts of the roller and between the belts on two adjacent rollers.
[0034] Preferably, the moving device includes a fixing member and a moving wheel installed at the bottom of the fixing member, and the moving wheel cooperates with the track of the shield machine.
[0035] Compared with the prior art, the advantages and positive effects of the present invention are:
[0036] (1) The processing system of the present invention is used for underground shield construction. During the underground shield construction process, it runs synchronously with the tunneling of the shield machine to achieve real-time processing of underground debris without occupying ground working space, with low operating costs and no environmental pollution.
[0037] (2) The present invention is provided with a control device, and the slag treatment is automatically controlled by the control device. The overall automation degree is high, the operation is simple, safe and reliable, the performance is stable, the labor input is reduced, the labor resources are saved, and the treatment efficiency is improved.
[0038] (3) The present invention has a compact layout, a reasonable structure, a small footprint, simple installation, low investment cost, high overall energy utilization, low energy consumption, and low operating cost. BRIEF DESCRIPTION OF THE DRAWINGS
[0039] Figure 1-2 This is a schematic structural diagram of a movable modular slag processing system according to an embodiment of the present invention;
[0040] Figure 3 This is a control principle block diagram of the movable modular slag processing system according to an embodiment of the present invention;
[0041] Figure 4 This is a schematic diagram of the installation of a movable modular slag processing system according to an embodiment of the present invention;
[0042] Figure 5 This is a working flow chart of the movable modular slag processing system described in an embodiment of the present invention.
[0043] In the figure, 1, slag conveying device, 2, screening device, 201, sewage tank, 202, drum screen, 203, spray mechanism, 301, dewatering screen, 302, buffer device, 303, lower water tank, 401, first slag pump, 402, second slag pump, 5, filter press device, 501, filter press, 6, main slag discharge device, 701, first auxiliary slag discharge device, 702, second auxiliary slag discharge device, 703, third auxiliary slag discharge device, 8, first mobile Device, 801, first fixed part, 802, first moving wheel, 9, second moving device, 901, second fixed part, 902, second moving wheel, 10, third moving device, 1001, third fixed part, 1002, third moving wheel, 11, controller, 12, first clean water pump, 13, second clean water pump, 14, dosing device, 15, metering pump, 16, flow meter, 17, tunnel, 18, treatment system of the present invention, 19, track. DETAILED DESCRIPTION
[0044] The present invention is described in detail below by way of exemplary embodiments. However, it should be understood that elements, structures, and features in one embodiment may also be beneficially combined in other embodiments without further description.
[0045] In the description of the present invention, it should be noted that the terms "upper", "lower", "left", "right", "inner", "outer", "top", "bottom" and the like indicate positions or positional relationships based on the positional relationships shown in the drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific position, be constructed and operated in a specific position, and therefore cannot be understood as limiting the present invention. In addition, the terms "first", "second", "third", and "fourth" are used for descriptive purposes only, and cannot be understood as indicating or implying relative importance.
[0046] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installation" and "connection" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.
[0047] See also Figures 1 to 3 This embodiment provides a movable modular slag processing system, including:
[0048] The slag conveying device 1 is placed at the slag outlet of the shield machine, and its front end is connected to the shield machine;
[0049] The screening device 2 is connected to the slag conveying device 1, and its feed inlet is located below the discharge end of the slag output device 1;
[0050] Dehydration device, comprising:
[0051] The dewatering screen 301, whose feed port is connected to the first slurry pump 401 arranged in the sewage tank 201 at the bottom of the screening device 2;
[0052] The buffer device 302 is placed at the discharge end side of the dewatering screen 301 and is connected to the lower water box 303 of the dewatering screen 301. A second slurry pump 402 is provided in the buffer device 302;
[0053] The filter press device 5 has a feed port connected to the second slurry pump 402;
[0054] A continuous slag discharging device, comprising a main slag discharging device 6 and three auxiliary slag discharging devices with discharging ends arranged above the main slag discharging device 6, the front end of the main slag discharging device 6 is flexibly connected to the shield machine, the feeding end of the first auxiliary slag discharging device 701 is arranged at the discharging port of the screening device 2, the feeding end of the second auxiliary slag discharging device 702 is arranged at the discharging port of the dewatering screen 301, and the feeding end of the third auxiliary slag discharging device 703 is arranged at the discharging port of the filter press device 5;
[0055] Three moving devices with the same structure cooperate with the track of the shield machine, namely a first moving device 8 arranged at the bottom of the screening device, a second moving device 9 arranged at the bottom of the dehydration device, and a third moving device 10 arranged at the bottom of the filter press device. The front end of the first moving device 8 is connected to the shield machine, the front end of the second moving device 9 is connected to the first moving device 8, and the front end of the third moving device 10 is connected to the second moving device 9.
[0056] Specifically, see Figure 3 In order to realize the automatic control of shield slag processing, the above-mentioned movable modular slag processing system also includes a control device, which includes a controller 11, and the controller 11 is respectively electrically connected to the slag conveying device 1, the screening device 3, the dewatering screen 301, the first slurry pump 401, the second slurry pump 402, the filter press device 5, the main slag discharge device 6, the first auxiliary slag discharge device 701, the second auxiliary slag discharge device 702 and the third auxiliary slag discharge device 703. In the whole processing process, the controller realizes full automatic control, which is simple to operate, safe and reliable, and has high processing efficiency.
[0057] Continue to see Figures 1 to 3 , the screening device comprises:
[0058] The drum screen 202 is connected to the slag conveying device 1, and its feed port is located below the discharge end of the slag output device 1. A first slurry pump 401 is provided in the sewage tank 201 at the bottom thereof, and the first slurry pump 401 is connected to the dewatering screen 301 through a first pipeline;
[0059] The spray mechanism 203 is arranged on one side of the drum screen 202;
[0060] The first clean water pump 12 is disposed in the ground clean water tank and is connected to the spray mechanism 203 through a second pipeline. The first clean water pump 12 is electrically connected to the controller 11 .
[0061] Continue to see Figures 1 to 3 , the filter press device 5 comprises:
[0062] The filter press 501 is electrically connected to the controller 11, and its feed port is connected to the second slurry pump 402 through a third pipeline;
[0063] A water receiving device is connected to the water outlet of the filter press 501, and is provided with a second clean water pump 13 connected to the controller 11, and the second clean water pump 13 is connected to the ground clean water tank through a fourth pipeline;
[0064] The dosing device 14 includes a dosing container for containing medicine, a metering pump 15 connected to the dosing container, a dosing pipeline connected to the metering pump 15, and a flow meter 16 arranged on the third pipeline. The metering pump 15 and the flow meter 16 are electrically connected to the controller 11, and the dosing pipeline is directly connected to the third pipeline.
[0065] The controller controls the metering pump according to the sewage flow detected by the flow meter to pump the liquid medicine in the medicine adding container to the third pipeline through the medicine adding pipeline.
[0066] Specifically, the main slag discharge device comprises:
[0067] The material receiving belt conveyor comprises a support frame, a belt placed on the support frame, and a belt driving device connected to the belt. The front end of the support frame is flexibly connected to the shield machine, and the rear end of the support frame is a spliced structure formed by splicing a plurality of fixed brackets.
[0068] The belt storage bin is placed on the ground and is provided with a roller assembly and a power output device connected to the roller assembly. The belt of the material receiving belt conveyor is wound around the roller assembly.
[0069] The eccentric adjustment device is arranged on the support frames on both sides of the belt.
[0070] It should be noted that the rear end of the support frame is set as a spliced structure. When the material receiving belt conveyor moves along with the shield machine, every time it moves a fixed distance, a fixed bracket is added to the empty position at the rear end to support the belt output from the belt storage bin.
[0071] Specifically, the belt drive device includes a drive motor installed at the front end of the support frame and a belt roller connected to the drive motor, the drive motor is electrically connected to the controller, the belt roller is axially connected to the front end of the support frame, and the belt is wrapped around the belt roller.
[0072] Specifically, the roller assembly comprises two symmetrically arranged sliding frames and a plurality of rollers mounted on the inclined surface of the sliding frames and arranged in parallel, and the sliding frames are connected to a power output device. The power output device can change the distance between the two sliding frames to achieve the purpose of outputting the belt to the material receiving belt machine.
[0073] Specifically, the eccentric adjustment device is a plurality of rollers arranged at intervals. When the belt deviates during transportation, the rollers rotate under the action of the belt, and the belt returns to its original running position under the action of the rollers, thereby achieving the function of adjusting the belt and preventing the belt from deviating.
[0074] Specifically, the main slag discharge device also includes a guide balancing device, which includes a sliding bracket rigidly connected to the sliding bracket and a plurality of pulley rollers installed on the inclined surface of the sliding bracket. The outer diameter of the pulley roller is smaller than the outer diameter of the roller. The pulley roller is located between the upper and lower belts of the roller and between the belts on two adjacent rollers. In the belt storage bin, when the power output device drives the roller assembly to change the spacing to output the belt for the material receiving belt conveyor, in order to prevent the belts between different layers from sticking to each other and causing poor transportation, the pulley rollers are used to separate the adjacent belts, which, on the one hand, play a guiding role to make the belt transportation smooth and prevent the belts from sticking to each other due to their own weight, and on the other hand, can play a supporting role.
[0075] Specifically, see Figure 1 The first moving device 8 includes a first fixing member 801 and a first moving wheel 802 installed at the bottom of the first fixing member 801, the first moving wheel 802 cooperates with the track of the shield machine, and the screening device 2 is installed on the first fixing member 801. The second moving device 9 includes a second fixing member 901 and a second moving wheel 902 installed at the bottom of the second fixing member 901, the second moving wheel 902 cooperates with the track of the shield machine, and the dehydration device is installed on the second fixing member 901. The third moving device 10 includes a third fixing member 1001 and a third moving wheel 1002 installed at the bottom of the third fixing member 801, the third moving wheel 1002 cooperates with the track of the shield machine, and the filter press device 5 is installed on the third fixing member 1001.
[0076] Specifically, in the above-mentioned processing system, the slag conveying device is a slag discharging belt conveyor, and the auxiliary slag discharging device is a material receiving belt conveyor.
[0077] It should be noted that the above treatment system is used for underground shield construction. The installation diagram is shown in Figure 4 .
[0078] See also Figure 5 ,The workflow of the above processing system is as follows:
[0079] The slag generated by the shield machine excavation is transported to the drum screen through the slag conveying device, and is cleaned and screened by high-pressure spraying. The large particles such as stones screened are transported to the main slag discharge device through the first auxiliary slag discharge device, and then transported to the ground slag pool by the slag discharge device. The muddy and sandy sewage generated by screening falls into the sewage tank and is transported to the dewatering screen through the first slag slurry pump. The dewatering screen screens and dewaters the muddy and sandy sewage, and transports small particles such as fine sand to the main slag discharge device through the second auxiliary slag discharge device, which is then transported to the ground slag pool by the slag discharge device. The generated sewage flows into the lower water tank, then enters the buffer device, and is transported to the filter press device through the second slurry pump through the third pipeline. In the process of transporting the sewage to the filter press device, the sewage is doped with drugs through the dosing device, and the sewage after dosing enters the filter press and is filtered by the filter press. The mud cake generated by the filter press is transported to the main slag discharge device through the third auxiliary slag discharge device, and then transported to the ground slag pool by the slag discharge device. The generated clean water is transported to the ground clean water tank by the clean water pump for recycling and standby. The entire process of slag treatment is automatically controlled by the controller.
[0080] It should be noted that, during the operation of the above-mentioned processing system, when the front end of the material receiving belt conveyor advances with the shield machine, every time it moves a fixed distance, a fixed bracket is added to the vacant position at the rear end.
[0081] In addition, it should be noted that when the shield machine is excavating, the slag conveying device, the screening device, the dehydration device and the filter press device move in the direction of the shield machine's excavation.
[0082] The above-mentioned processing system of this embodiment has a reasonable structure and a compact layout, realizes real-time processing of underground slag, does not need to occupy ground working space, has low operating costs, and does not pollute the environment. The continuous output of slag is completed through automatic control of the control device, with a high overall degree of automation, reduced labor input, simple operation, safety and reliability, and good stability.
[0083] The above embodiments are used to explain the present invention rather than to limit the present invention. Any modification and change made to the present invention within the spirit of the present invention and the protection scope of the claims shall fall within the protection scope of the present invention.
Claims
1. A movable modular soil treatment system, placed in a construction tunnel, characterized in that: include: The slag conveying device is placed at the slag outlet of the shield machine, and its front end is connected to the shield machine; A screening device is connected to the slag conveying device, and its feed inlet is located below the discharge end of the slag output device; Dehydration device, comprising: A dewatering screen, the feed port of which is connected to a first slurry pump disposed in a sewage tank at the bottom of the screening device; A buffer device is placed on the discharge end side of the dewatering screen and is connected to the lower water tank of the dewatering screen. A second slurry pump is provided in the buffer device; A filter press device, the feed port of which is connected to the second slurry pump; The continuous slag discharging device comprises a main slag discharging device and three auxiliary slag discharging devices with discharging ends arranged above the main slag discharging device. The front end of the main slag discharging device is flexibly connected to the shield machine. The feeding ends of the three auxiliary slag discharging devices are respectively arranged at the discharging port of the screening device, the discharging port of the dewatering screen, and the discharging port of the filter press device; Three moving devices with the same structure, the moving devices include a fixed part and a moving part installed at the bottom of the fixed part, and the moving part cooperates with the track of the shield machine; the first moving device is arranged at the bottom of the screening device, and its front end is connected to the shield machine; the second moving device is arranged at the bottom of the dehydration device, and its front end is connected to the first moving device; the third moving device is arranged at the bottom of the filter press device, and its front end is connected to the second moving device; It also includes a control device, which includes a controller, and the controller is electrically connected to the slag conveying device, the screening device, the dewatering screen, the first slag pump, the second slag pump, the filter press device, the main slag discharge device and the auxiliary slag discharge device.
2. The movable modular soil handling system according to claim 1, characterized in that: The screening device comprises: The drum screen is connected to the slag conveying device, and its feed port is located below the discharge end of the slag output device. A first slag pump is provided in the sewage tank at the bottom of the drum screen, and the first slag pump is connected to the dewatering screen through a first pipeline; The spray mechanism is arranged above the drum screen; The first clean water pump is arranged in the ground clean water tank and is connected with the spray mechanism through the second pipeline. The first clean water pump is electrically connected with the controller.
3. The movable modular soil handling system according to claim 1, characterized in that: The filter press device comprises: A filter press is electrically connected to the controller, and its feed port is connected to the second slurry pump through a third pipeline; A water receiving device is connected to the water outlet of the filter press, and is provided with a second clean water pump connected to the controller, and the second clean water pump is connected to the ground clean water tank through a fourth pipeline; The dosing device has a dosing pipeline connected to the third pipeline.
4. The movable modular soil handling system according to claim 3, characterized in that: The dosing device includes a dosing container for containing medicine, a metering pump connected to the dosing container, a dosing pipeline connected to the metering pump, and a flow meter arranged on the third pipeline. The metering pump and the flow meter are electrically connected to the controller, and the dosing pipeline is directly connected to the third pipeline.
5. The movable modular soil handling system according to claim 1, characterized in that: The main slag discharging device comprises: The material receiving belt conveyor comprises a support frame, a belt placed on the support frame, and a belt driving device connected to the belt. The front end of the support frame is flexibly connected to the shield machine, and the rear end of the support frame is a spliced structure formed by splicing a plurality of fixed brackets. The belt storage bin is placed on the ground and is provided with a roller assembly and a power output device connected to the roller assembly. The belt of the material receiving belt conveyor is wound around the roller assembly. The eccentric adjustment device is arranged on the support frames on both sides of the belt.
6. The movable modular soil handling system according to claim 5, characterized in that: The belt driving device includes a driving motor installed at the front end of the support frame and a belt roller connected to the driving motor. The driving motor is electrically connected to the controller, the belt roller is axially connected to the front end of the support frame, and the belt is wrapped around the belt roller.
7. The movable modular soil handling system according to claim 5, characterized in that: The roller assembly comprises two symmetrically arranged sliding frames and a plurality of rollers mounted on the inclined surfaces of the sliding frames and arranged in parallel, wherein the sliding frames are connected to a power output device; and the eccentric adjustment device comprises a plurality of rollers arranged at intervals.
8. The movable modular soil handling system according to claim 7, characterized in that: The main slag discharge device also includes a guide balancing device, which includes a sliding bracket rigidly connected to the sliding frame and a plurality of pulley rollers installed on the inclined surface of the sliding bracket. The outer diameter of the pulley roller is smaller than the outer diameter of the roller. The pulley roller is located between the upper and lower belts of the roller and between the belts on two adjacent rollers.
9. The movable modular soil handling system according to claim 1, characterized in that: The moving part is a moving wheel.
Citation Information
Patent Citations
Earth pressure shield slurry treatment device and treatment process thereof
CN111821758A
Shield muck continuous output treatment system and method
CN112777271A
Belt conveying device applied to tunnel construction and tunnel slag discharge system and method
CN113264337A
Earth pressure balance shield construction belt transports out cause of a quarrel device
CN206280078U
Movable modular muck treatment system
CN216836173U
