Ballastless track composite reinforced prestressed bed structure and construction method of high-speed railway
A ballastless track and high-speed railway technology, applied in the direction of track, road, ballast layer, etc., can solve the problem of ballast compaction and reduction of subgrade elasticity, difficulty in ensuring subgrade compaction quality, poor permeability of subgrade surface filler, etc. problems, to achieve the effect of preventing roadbed muddying disease, preventing roadbed disease occurrence, and improving the stability of subgrade
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0039] The present invention will be further described below with reference to the accompanying drawings and specific embodiments.
[0040] like figure 1As shown, a ballastless track composite reinforced prestressed bed structure of a high-speed railway, from top to bottom, comprises a bed surface layer 1, an upper portion of the bed bottom layer 2 and a lower portion of the bed bed bottom layer 3; The lower part is provided with a strip foundation 5; the surface layer 1 of the foundation bed is made of graded crushed stone, and the upper part is provided with a plurality of reinforcing ribs, which form an anti-turning slurry cell; the reinforcing ribs are arranged in an array; The drainage layer, the waterproof and drainage layer is inclined from one side to the other side; figure 2 As shown; the upper part 2 of the subgrade bottom layer is made of foam light soil doped with short fibers, and a geogrid 7 is arranged inside;
[0041] The thickness of the surface layer 1 of ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


