Fabricated foam concrete post-grouting floor engineering construction method
Through assembly construction methods and foam concrete injection technology, the problems of low efficiency and deviation of joints in the existing technology of block materials are solved, and efficient and high-quality floor construction is achieved.
Patent Information
- Application Number
- CN202411528724.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-30
- Publication Date
- 2024-12-13
AI Technical Summary
In existing construction projects, the construction efficiency of the block-like floor building construction methods is low, and it is difficult to adjust the deviation of the joints, which is prone to hollowing, affecting the construction quality and appearance.
Using the assembled construction method, the block floor material is installed overhead on the floor structure surface and foam concrete is injected. After it solidifies, the floor project is completed.
Improve construction efficiency, adjust the height of the joints, avoid the deviation of the height of the joints and hollowing, ensure the close integration of the floor materials with foam concrete, and improve the construction quality.
Smart Images

Figure CN119122222A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to a construction method of a floor engineering of block materials in a building project, in particular to a construction method of a floor engineering of block materials which can be constructed by an assembly construction process. Background Art
[0002] The current construction technology for the construction of block-shaped materials in building projects is to use cement mortar as the bonding material to lay the floor one by one. This method has low construction efficiency, and the construction quality depends entirely on the operation level of skilled workers. When hollowing and the height deviation of the joints exceed the standard, it is difficult to rectify. In actual construction, grinding is often used to deal with the height deviation of the joints, but the brightness of the polished surface is not as good as that of the original material, which often leaves a flaw in the appearance of the floor project. Summary of the invention
[0003] In order to overcome the shortcomings of the current construction technology, the present invention provides a construction method, which can not only improve the construction efficiency of block material floor engineering, but also ensure the construction quality.
[0004] The technical solution adopted by the present invention to solve its technical problem is: adopt an assembled construction method to install block floor materials overhead on the floor structure surface, and then inject foam concrete into the cavity between the block floor materials and the floor structure. When the foam concrete solidifies, the floor project is completed.
[0005] The beneficial effects of the present invention are that the assembly construction method is adopted with high construction efficiency; and the height of the joints can be adjusted before grouting, and the height deviation of the joints will not exceed the standard. The post-grouting construction can ensure that the floor blocks and the foam concrete are fully and tightly combined, avoiding the occurrence of hollowing. BRIEF DESCRIPTION OF THE DRAWINGS
[0006] The present invention is further described below in conjunction with the accompanying drawings and embodiments.
[0007] Figure 1 It is the completed structural drawing of the assembled floor.
[0008] Figure 2 It is the floor support.
[0009] In the picture, 1. floor blocks, 2. floor supports. DETAILED DESCRIPTION
[0010] The position of the floor support (2) is determined by laying out the lines, the floor base at the position of the floor support (2) is leveled, the floor support (2) is fixed on the floor base, and then the floor block (1) is placed on the floor support (2), and then foam concrete is injected into the cavity between the floor block (1) and the floor base. After the concrete solidifies, the floor project is completed.
Claims
1. A method for the construction of assembled foam concrete post-grouting floor engineering, which is suitable for the construction of block material floor engineering, especially a method for the construction of block material floor engineering that can be constructed by an assembled construction process, and is characterized by: Fix the floor support on the floor base, then place the floor blocks on the floor support, and then fill the cavity between the floor blocks and the floor base with foam concrete. After the foam concrete solidifies, the floor project is completed.