Suspension slewing bridge crane
By designing a suspension slewing bridge crane in the mineral processing plant, the combination of the suspension system and the rotation system solves the problem of insufficient height and flexibility of the crane equipment in the large-span plant, achieves efficient and safe lifting operations, and reduces the cost of infrastructure. Invest in and avoid the mid-bend phenomenon.
Patent Information
- Application Number
- CN201810868819.8
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2018-08-02
- Publication Date
- 2024-10-29
- Estimated Expiration
- 2038-08-02
AI Technical Summary
The installation height of the existing crane equipment in the long-span mineral processing plant is too high, which leads to increased investment in infrastructure. The hook can only move in a fixed direction, lacking flexibility, causing safety hazards and inconvenient loading and unloading.
A suspension slewing bridge crane is designed. The large truck beam is suspended under the load-bearing beam of the workshop roof through the suspension system. A rotation system is set up to achieve 360-degree rotation, which avoids the traditional upward crane arrangement and reduces the installation time. height, and arrange the suspension system every 20 meters to avoid bending in the middle.
It effectively reduces the installation height of the crane, adapts to the needs of large-span factory buildings, improves the flexibility and safety of lifting, reduces infrastructure investment, avoids bending in the middle, and enables flexible walking and shipment of heavy objects at any angle.
Smart Images

Figure CN108584714B_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of ore dressing plant maintenance, and in particular relates to a suspended rotary bridge crane. Background Art
[0002] Ore dressing plants are generally composed of operations such as crushing-grinding-sorting. As a heavy industry, a workshop of ore dressing usually contains many kinds of parts that need to be repaired and other operations that need to be hoisted. Most of the current cranes have their trolley tracks installed on the columns on both sides of the vehicle. The trolley is located on the upper part of the track, and the trolley is located on the upper part of the trolley. This layer-by-layer upward arrangement makes the roof of the workshop continuously increase in order to meet the installation needs of the crane, which eventually leads to the workshop height being too high, greatly increasing the infrastructure investment of the workshop. Moreover, the span of some workshops is particularly large, and some even reach more than 40 meters. At this time, it only relies on the columns on both sides of the workshop to bear the load. When the hook is located in the middle of the trolley, it is easy to cause the middle trolley beam to bend, forming a safety hazard. Therefore, when using this type of crane, the span of the plant rarely exceeds 40 meters, which limits the layout of the plant. In addition, the current crane hook can only move forward and backward or left and right after lifting the heavy object, and the heavy object cannot rotate freely. This requires that the movement and loading of the heavy object can only be in a fixed direction, and the movement and loading are not flexible enough. Summary of the invention
[0003] The purpose of the present invention is to provide a suspended slewing bridge crane which can effectively reduce the installation height of the crane, can meet the maintenance needs of large-span factories, and can rotate freely when lifting heavy objects.
[0004] The objective of the present invention is achieved through the following technical solutions:
[0005] The suspension slewing bridge crane of the present invention is characterized by comprising a suspension system, a slewing system arranged on the suspension system,
[0006] The suspension system includes two trolley beams arranged below the workshop load-bearing beam, a walking channel arranged on each trolley beam, a bridge crane suspended on the two trolley beams through a group of trolley walking wheels, a trolley track arranged on the bottom of the bridge crane, and a trolley suspended on the trolley track through the trolley walking wheels.
[0007] The walking passage includes the vertical beam of the trolley beam, the bottom plate and the side plate connected to the vertical beam,
[0008] The rotating system includes a rotating disc arranged below the trolley frame, a rotating beam arranged inside the rotating disc, an annular channel arranged on the rotating disc, a hook arranged in the middle of the rotating beam, and two rotating gear trains respectively arranged at both ends of the rotating beam, and each rotating gear train moves along the annular channel.
[0009] The cross section of the trolley beam is an I-shaped cross section.
[0010] The group of trolley running wheel groups is composed of four trolley running wheel groups, one trolley running wheel group is arranged on the front and rear of each trolley beam, each trolley running wheel group is composed of two trolley running wheels, and the trolley running wheels are arranged in the walking channel.
[0011] The rotating wheel system comprises an arc-shaped frame whose middle part is welded to the upper edge of the rotating beam, and two rotating wheel groups arranged on the arc-shaped frame.
[0012] The rotating wheel train is provided with a reversible travel motor.
[0013] Advantages of the present invention:
[0014] (1) In the suspended slewing bridge crane of the present invention, the trolley beam is suspended under the load-bearing beam of the workshop roof, and the trolley is suspended under the bridge crane. This method avoids the traditional crane arrangement method of arranging tracks on columns and arranging trolleys on the tracks, so that all components of the entire crane are as close to the roof as possible, saving the height difference required for crane arrangement and reducing investment;
[0015] (2) The suspension slewing bridge crane of the present invention has a suspension system arranged every 20 meters, thereby avoiding the phenomenon of middle bending when the span of a traditional crane is large, realizing the crane arrangement of a large-span factory building, with a simple structure, safety and practicality;
[0016] (3) The suspended slewing bridge crane of the present invention can realize 360-degree rotation of the sling by rotating the main beam, thereby realizing the walking and loading of the hoisted heavy objects at any angle, greatly improving the flexibility of hoisting. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 It is a structural schematic diagram of the present invention.
[0018] Figure 2 It is a structural schematic diagram of the rotating system of the present invention.
[0019] Figure 3 It is an enlarged view of part I of the present invention.
[0020] Figure 4 It is an enlarged view of part II of the present invention. DETAILED DESCRIPTION
[0021] The specific implementation of the present invention is further described below in conjunction with the accompanying drawings.
[0022] like Figure 1 , 2 , 3 and 4, the suspended slewing bridge crane of the present invention is characterized in that it includes a suspension system, a slewing system arranged on the suspension system,
[0023] The suspension system includes two trolley beams 1 arranged below the workshop load-bearing beam 3, a walking channel arranged on each trolley beam 1, a bridge crane 2 suspended on the two trolley beams 1 through a group of trolley walking wheels, a trolley track 10 arranged on the bottom of the bridge crane 2, and a trolley 8 suspended on the trolley track 10 through the trolley walking wheels 9.
[0024] The walking passage includes the vertical beam 5 of the trolley beam 1, the bottom plate 6 and the side plate 7 connected to the vertical beam 5,
[0025] The rotating system includes a rotating disc 11 arranged under the frame of the trolley 8, a rotating beam 12 arranged in the rotating disc 11, an annular channel 16 arranged on the rotating disc 11, a hook 13 arranged in the middle of the rotating beam 12, and two rotating gear trains respectively arranged at both ends of the rotating beam 12, and each rotating gear train moves along the annular channel 16.
[0026] The cross section of the truck beam 1 is an I-shaped cross section.
[0027] The group of trolley running wheel groups is composed of four trolley running wheel groups, one trolley running wheel group is arranged on the front and rear of each side of the trolley beam, each trolley running wheel group is composed of two trolley running wheels 4, and the trolley running wheels 4 are arranged in the walking channel.
[0028] The rotating wheel system includes an arc-shaped frame 14 whose middle part is welded to the upper edge of the rotating beam 12 , and two rotating wheel sets 15 arranged on the arc-shaped frame 14 .
[0029] The rotating wheel train is provided with a reversible travel motor.
[0030] The present invention is composed of a suspension system and a rotation system. In the suspension system, a trolley beam 1 is located below a load-bearing beam 3. A suspension system is arranged every 20 meters in the width direction of the workshop. Each trolley beam 1 is bolted to the load-bearing beam 3 arranged at equal intervals below the roof. The trolley beam 1 is arranged along the length of the workshop. The trolley 8 of each bridge crane 2 is suspended below its own trolley track 10 through the trolley running wheels 9.
[0031] The rotating system consists of a rotating disc 11 welded under the frame of the trolley 8, a rotating beam 12 arranged in the rotating disc, a hook 13 arranged in the middle of the rotating beam 12, and two rotating gear trains arranged at both ends of the rotating beam 12. Both rotating gear trains move along the annular channel 16.
[0032] The suspended slewing bridge crane of the present invention has a trolley beam 1 suspended under a load-bearing beam 3 on a workshop roof, and a trolley 8 suspended under a bridge crane 2. This method avoids the traditional crane arrangement method of arranging tracks on columns and arranging trolleys 8 on the tracks, so that all components of the entire crane are as close to the roof as possible, saving the height difference required for the crane arrangement and reducing investment; the suspension system is arranged in one group every 20 meters, thereby avoiding the phenomenon of middle bending when the span of a traditional crane is large, and realizing the crane arrangement of a large-width factory building, with a simple structure, safety and practicality; the sling can be rotated 360 degrees by rotating the beam 12, thereby realizing the walking and loading of the lifted heavy object at any angle, greatly improving the flexibility of lifting.
Claims
1. Suspension slewing bridge crane, characterized by It includes a suspension system, a rotating system arranged on the suspension system, The suspension system includes two trolley beams arranged below the workshop load-bearing beam, a walking channel arranged on each trolley beam, a bridge crane suspended on the two trolley beams through a group of trolley walking wheels, a trolley track arranged on the bottom of the bridge crane, and a trolley suspended on the trolley track through the trolley walking wheels. The walking passage includes the vertical beam of the trolley beam, the bottom plate and the side plate connected to the vertical beam, The rotating system comprises a rotating disc arranged below the trolley frame, a rotating beam arranged in the rotating disc, an annular channel arranged on the rotating disc, a hook arranged in the middle of the rotating beam, and two rotating gear trains respectively arranged at both ends of the rotating beam, each rotating gear train moves along the annular channel. The group of trolley running wheel groups is composed of four trolley running wheel groups. A trolley running wheel group is arranged on the front and rear of each trolley beam. Each trolley running wheel group is composed of two trolley running wheels. The trolley running wheels are arranged in the walking channel. The rotating wheel system includes an arc-shaped frame whose middle part is welded to the upper edge of the rotating beam, and two rotating wheel groups arranged on the arc-shaped frame. The suspended slewing bridge crane can realize 360-degree rotation of the hoisting device by rotating the beam, thereby realizing the movement and transportation of the hoisted load at any angle.
2. The suspension slewing bridge crane according to claim 1, characterized in that The cross section of the truck beam is an I-shaped cross section.
3. The suspension slewing bridge crane according to claim 1, characterized in that The rotating wheel train is provided with a reversible travel motor.
Citation Information
Patent Citations
Rotatable electric hoist type crane
CN106006378A
Telescopic annular hanging crane
CN201825650U
Large-span multi-support point hanging type crane
CN202080829U
Trolley structure of crane
CN202220049U
Monorail crane
CN202594652U