On-site manufacturing, installing and constructing method for bottom filling cone protection plate of rotational flow well
Through on-site calculation and welding assembly, the single piece of isosceles trapezoidal cone guard plate is solved, which solves the problem of cumbersome installation process of the bottom guard plate of the swirl well, achieves process simplification and cost saving, and meets the flexibility and functional requirements of construction.
Patent Information
- Application Number
- CN202411103024.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-13
- Publication Date
- 2024-10-01
AI Technical Summary
The on-site production and installation process of the cone guard plate at the bottom of the swirl well is cumbersome, resulting in extended construction period and increased cost. The existing arc rolling and assembly methods are not suitable for rapid on-site installation.
On-site calculation and measurement of the structural dimensions of the truncated table were used to calculate the size of the single piece of the cone guard plate, and the isosceles trapezoid blanking and welding assembly were carried out to simplify the process. Steel plates were used as standard unit pieces, and installation was achieved through temporary support fixation and welding connections.
It simplifies the manufacturing process of the cone guard plate, shortens the construction period, reduces losses and costs, and meets the flexibility and functional requirements of construction.
Smart Images

Figure CN118720664A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of vortex well construction, and in particular to a method for on-site manufacturing and installation of a filling cone guard plate at the bottom of a vortex well. Background Art
[0002] In the field of metallurgical construction, the vortex well is an important building, which is indispensable as a public auxiliary water system for steel rolling and steelmaking. The vortex well is generally a circular reinforced concrete structure with a large diameter (18~35m), a thick cylinder wall (1~1.5m), a deep burial (20~35m), and a thick bottom plate (1.2~2.5m). It is a key and difficult point in construction. Common construction methods include large excavation, reverse construction, caisson, etc. Among them, the caisson method is more common. When the outer cylinder wall caisson is in place, the bottom plate is sealed, and then the bottom cone concrete is filled on the bottom plate around the inner side of the cylinder wall to form an inverted truncated cone space structure in the middle. The grab crane is lowered from the inner cylinder to clean the steel slag at the bottom of the cylinder. The bottom plate guard plate and the cone guard plate are protective plates set to protect the concrete from being hit by the grab crane. The cone-filled concrete guard plate is an inverted truncated cone structure, which often needs to be decomposed into several pieces. The guard plate is arc-rolled in the factory, and then assembled on site by a team. The process is cumbersome. Summary of the invention
[0003] In order to solve the above technical problems, the present invention provides an on-site production and installation construction method for a filling cone guard plate at the bottom of a vortex well, which can meet the use function and construction process, simplify the process and shorten the construction period.
[0004] To achieve this technical purpose, the present invention adopts the following scheme: A method for on-site production and installation of a filling cone guard plate at the bottom of a vortex well, comprising the following steps: The first step is to calculate / measure the size of the inverted cone structure at the bottom of the vortex well; The second step is to calculate the single-piece size parameters of the cone guard plate according to the size of the inverted truncated cone structure in the first step; The third step is to cut the cone guard plate according to the single piece size of the cone guard plate in the second step; The fourth step is to assemble the guard plates and install the cone guard plate single piece at the bottom of the vortex well for connection.
[0005] Furthermore, the dimensions of the inverted truncated cone structure include the bottom diameter of the inverted truncated cone structure, the angle between the cone guard plate and the bottom plate, and the height of the inverted truncated cone structure.
[0006] Furthermore, the single piece of the cone guard plate is an isosceles trapezoid, and the size and quantity of the single piece of the cone guard plate are calculated according to the size of the inverted frustum structure.
[0007] Furthermore, the dimensions of the single piece of cone guard plate include the upper base width, lower base width and height of an isosceles trapezoid.
[0008] Furthermore, when the guard plates are assembled, temporary support and fixation are adopted on the back of the cone guard plates to ensure the angle between the cone guard plates and the bottom plate.
[0009] Furthermore, the guard plates are assembled by welding.
[0010] Compared with the prior art, the present invention has the following beneficial effects: 1. The cone guard plate does not need to be processed into an arc-shaped structure, which simplifies the production process and shortens the construction period.
[0011] 2. The width of the steel plate is used as the upper bottom width of the standard unit cone guard plate, and the guard plate height is measured in sequence along the length direction of the steel plate for layout, which reduces the loss and saves costs.
[0012] 3. Flexible and optimized design to meet functional and process requirements. BRIEF DESCRIPTION OF THE DRAWINGS
[0013] Figure 1 This is a schematic elevation diagram of a vortex well according to an embodiment of the present invention; Figure 2 A top view of a cone guard plate according to an embodiment of the present invention; Figure 3 for Figure 2 Medium AA view; Figure 4 This is a cutting diagram of a cone guard plate according to an embodiment of the present invention; Figure 5 Schematic diagram of a single piece of cone guard plate according to an embodiment of the present invention Marked in the figure: 1. Bottom plate guard; 2. Cone guard. DETAILED DESCRIPTION
[0014] In order to fully understand the purpose, features and effects of the present invention, the present invention is described in detail through the following specific implementation methods, but the present invention is not limited thereto.
[0015] The present invention provides a technical solution: a method for on-site production and installation of a filling cone guard plate at the bottom of a vortex well, comprising the following steps: The first step is to calculate / measure the dimensions of the inverted frustum structure at the bottom of the vortex well, including the bottom diameter, top diameter, angle between the cone guard plate 2 and the bottom plate guard plate 1, and the height of the inverted frustum structure.
[0016] The second step is to calculate the size parameters of the single piece of cone guard plate 2 according to the size of the inverted truncated cone structure in the first step; the single piece of cone guard plate 2 is an isosceles trapezoid, and the size and quantity of the single piece of cone guard plate 2 are calculated according to the size of the inverted truncated cone structure. The size of the single piece of cone guard plate 2 includes the upper base width, lower base width and height of the isosceles trapezoid. The third step is to cut the cone guard plate 2 according to the size and quantity of the cone guard plate 2 in the second step; Step 4: Guard plate assembly. When the guard plates are assembled, temporary support is taken on the back of the cone guard plate 2 to ensure the angle between the cone guard plate 2 and the bottom plate guard plate 1. The guard plates are assembled by welding.
[0017] See also Figures 1 to 5 In the embodiment of the present invention, the diameter of the bottom of the inverted truncated cone structure is 8000mm, the cone guard plate 2 forms an angle of 50° with the bottom plate guard plate 1, the height of the inverted truncated cone structure is 2100mm, and the length and width of the steel plate used are: 12000mm*1500mm.
[0018] Trigonometric functions: sin50°=0.766, tg50°=0.8727.
[0019] The first step is to calculate the size of the inverted cone structure at the bottom of the vortex well.
[0020] The upper circumference of the inverted truncated cone structure is C1 = 3.14*(8000+2*2100 / tg50°) = 40232mm, and the lower circumference is C2 = 3.14*8000 = 25120mm.
[0021] Step 2: Calculate the single-piece size parameters of the cone guard plate 2.
[0022] According to the size and angle of the inverted truncated cone structure, the length of the inclined surface of the inverted truncated cone structure guard plate is: 2100 / sin50°=2742mm, which is the height of the cone guard plate 2. The number of cone guard plates 2 required is: C1 / 1500=26.8 pieces; the lower size of the cone guard plate 2 is: C2 / 26.8=937mm. That is, the single piece of cone guard plate 2 is an isosceles trapezoid, with an upper base width of 1500mm, a lower base width of 937mm, and a height of 2742mm, and a total of 26.8 pieces are required.
[0023] Step 3: Cutting the cone guard plate 2.
[0024] (1500-937) / 2=282mm The steel plate is cut into small pieces with equal intervals of 2742mm in length along the length direction. The width of 1500mm is used as the upper base size of the cone guard plate 2, and the lower base size is 937mm. The excess 282mm wide triangular strips on both sides are cut to form an isosceles trapezoidal standard unit piece.
[0025] The size of the non-standard unit chip is as follows: the upper base and the lower base are 0.8 times the size of the standard unit chip, and the height is the same as the standard chip.
[0026] Step 4: Guard plate team.
[0027] Loft a circle with a diameter of 8000mm on the bottom plate guard plate 1, measure the chord length of 937mm 26 times in sequence and intersect it with the circumference of the circle, and then connect the intersection points in sequence to form a polygon.
[0028] Place the lower bottom of the cone guard plate 2 in the polygonal size position in sequence, and temporarily support and fix the back of the cone guard plate 2 to ensure that the angle between the cone guard plate 2 and the bottom plate guard plate 1 is 50°.
[0029] The adjacent guard plate sides of the standard unit pieces are welded and connected in sequence, and the last non-standard unit piece is used as a cross-loop.
[0030] Finally, it should be noted that the above are only preferred embodiments of the present invention. Of course, those skilled in the art can make changes and modifications to the present invention. If these modifications and variations fall within the scope of the claims of the present invention and their equivalent technologies, they should be considered to be within the scope of protection of the present invention.
Claims
1. A method for on-site production and installation of a cone guard plate filled at the bottom of a cyclone well. It is characterized in that The following steps are involved: The first step is to calculate / measure the size of the inverted cone structure at the bottom of the vortex well; The second step is to calculate the single-piece size parameters of the cone guard plate according to the size of the inverted truncated cone structure in the first step; The third step is to cut the cone guard plate according to the single piece size of the cone guard plate in the second step; The fourth step is to assemble the guard plates and install the cone guard plate single piece at the bottom of the vortex well for connection.
2. The on-site manufacturing and installation construction method of the filling cone guard plate at the bottom of the vortex well according to claim 1, It is characterized in that The dimensions of the inverted truncated cone structure include the bottom diameter of the inverted truncated cone structure, the angle between the cone guard plate and the bottom plate, and the height of the inverted truncated cone structure.
3. The on-site manufacturing and installation construction method of the filling cone guard plate at the bottom of the vortex well according to claim 1, It is characterized in that The single piece of cone guard plate is an isosceles trapezoid, and the size and quantity of the single piece of cone guard plate are calculated according to the size of the inverted frustum structure.
4. The on-site manufacturing and installation construction method of the filling cone guard plate at the bottom of the vortex well according to claim 1, It is characterized in that The dimensions of a single piece of the cone guard plate include the upper base width, lower base width and height of an isosceles trapezoid.
5. The on-site manufacturing and installation construction method of the filling cone guard plate at the bottom of the vortex well according to claim 1, It is characterized in that When the guard plates are assembled, temporary support is provided on the back of the cone guard plates to ensure the angle between the cone guard plates and the base plate.
6. The on-site manufacturing and installation construction method of the filling cone guard plate at the bottom of the vortex well according to claim 1, It is characterized in that The guard plates are connected by welding.
Citation Information
Patent Citations
Method for implementing hot rolling swirl pool constructional engineering by top-down method
CN101372872A
Construction technology of large-span network steel structure roofing
CN106812236A
Construction method of prefabricated pressure relief cone of rebar concrete silo structure
CN108035594A
Rotational flow well open caisson method bottom waterproof construction method
CN116905571A
Rotational flow shaft wall open caisson and reverse construction integrated construction method
CN117211321A