Slip form construction method for rectangular thin and high frame column with prefabricated straining beam

By introducing the repair mechanism of lifting plate, cover plate, scraping assembly and storage box in the sliding form construction method, the concrete surface of the rectangular thin frame column is automatically repaired, and the concrete surface traces caused by friction in the prior art are solved. Problem, reducing manual repair work and realizing concrete recycling.

CN118933337AActive Publication Date: 2024-11-12SINOHYRDO ENG BUREAU 3 CO LTD
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
CN202411320491.8
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-23
Publication Date
2024-11-12
Estimated Expiration
2044-09-23

AI Technical Summary

Technical Problem

The existing sliding form construction method of prefabricated beam rectangular thin frame columns leaves irregular marks on the concrete surface due to friction when the formwork rises, which requires manual repair, which increases labor intensity.

Method used

A sliding form construction method with a repair mechanism is designed, including lifting plates, cover plates, scraping assembly and storage box. The concrete surface is automatically repaired through a spring telescopic cylinder and a drive motor. The scraping assembly is used to fill potholes. , the suction pump recovers the remaining concrete.

Benefits of technology

It realizes automatic repair of the concrete surface when the formwork rises, reduces manual repair workload, reduces labor intensity, and realizes the recycling of concrete.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933337A_ABST
    Figure CN118933337A_ABST
Patent Text Reader

Abstract

The invention discloses a slip form construction method for a rectangular thin and high frame column with a prefabricated straining beam, and relates to the field of fabricated buildings, and the slip form construction method comprises the following steps: S1, mounting the thin and high frame column; s2, assembling a slip form; s3, integrally sliding and lifting; s4, repairing is conducted, specifically, after the formwork slides and rises, a lifting plate in a bottom containing groove is controlled by a spring telescopic cylinder to move along a sliding groove, a cover plate is driven to move out of the formwork, then a cement pump in a material storage box works to spray concrete to the outer wall of the concrete from a material spraying pipe through a pipeline, and at the moment, a second telescopic cylinder of a slicking assembly works; according to the concrete block repairing and leveling device, when the formwork ascends, the scraping plate is pushed to move downwards to scrape concrete, then repairing and leveling are conducted through the scraped concrete when the formwork encounters a pit, when the formwork ascends, automatic repairing can be conducted on the surface of the exposed concrete block, most of pit traces are filled, the manual repairing workload is reduced, and then the labor intensity is reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention mainly relates to the technical field of prefabricated buildings, and specifically to a slipform construction method of rectangular slender tall frame columns with prefabricated tie beams. Background Art

[0002] The slipform construction of prefabricated tie beam rectangular slender frame columns is an advanced construction technology, mainly used in the field of prefabricated buildings. This construction method uses slipforms as the main formwork system, and through hydraulic or mechanical drive, the formwork is staggered from bottom to top in the vertical direction, thereby achieving the purpose of continuous production.

[0003] A super-high rectangular column slipform and operating platform construction method described in the prior art includes the steps of rectangular column construction, slipform installation, operating platform installation, jack installation, guide sleeve installation, anti-drift device installation, overall sliding, and slipform and operating platform removal.

[0004] The above technology can better realize the sliding construction of rectangular columns, greatly reduce the erection of operating frames and high-altitude operations, controllable operation, reduce construction costs, and increase construction efficiency. However, when the formwork rises, the friction will cause the formwork to lift up part of the contacted concrete, causing certain damage, leaving irregular marks on the surface of the concrete block. It is necessary to use a hanging scaffolding for the staff to repair the exposed surface, thereby increasing the labor intensity of the staff. Summary of the invention

[0005] Based on this, the purpose of the present invention is to provide a slipform construction method for rectangular slender frame columns with prefabricated tie beams to solve the technical problems raised in the above background technology.

[0006] To achieve the above object, the present invention provides the following technical solutions: A slipform construction method for a rectangular slender frame column with a prefabricated tie beam comprises the following steps: S1. Installation of slender frame columns: transport the prefabricated frame columns to the construction site and connect and install them with the pre-buried steel plates and steel bars; S2, Slipform assembly, install the three-dimensional frame, lifting rod, lifting baffle, template operation platform, and through-type jack in the slipform device around the slender and tall frame column in sequence, and set a distance between the template and the frame column according to the construction requirements; S3, overall sliding, open the through-type jack and climb up along the lifting rod, drive the operating platform to rise, the operating platform drives the template to rise through the lifting baffle, and after rising to a certain position, continue the pouring construction through the template; S4, repair, after the template slides up, the lifting plate in the bottom receiving groove moves along the sliding groove under the control of the spring telescopic cylinder, and drives the cover plate to move out of the template, then the first telescopic cylinder works to push the push plate to move, and under the action of the connecting plate, the cover plate moves along the square slide groove to cover the exposed concrete outer wall; Then the cement pump in the storage box works to spray concrete from the spraying pipe to the outer wall of the concrete through the pipe. At this time, the second telescopic cylinder of the scraping assembly works to push the scraper down to scrape the concrete, and then when encountering potholes, the scraped concrete is used to repair and level them. Finally, the remaining concrete falls into the receiving pipe through the opening, and is sent back to the storage box through the pipe under the action of the suction pump to complete the repair work.

[0007] Specifically, the bottom of the template is provided with a receiving groove, and a repair mechanism is provided in the receiving groove, and the repair mechanism is used to repair the exposed surface of the concrete block; The repair mechanism is composed of a lifting plate, a cover plate, a scraping assembly and a material storage box. A long strip-shaped spraying pipe is horizontally installed on the top of the inner side of the cover plate, and the material storage box is fixed on the top of the outer wall of the template. The cover plate is located on the lower surface of the lifting plate and is slidably connected. The scraping assembly is arranged in the cover plate, and the scraping assembly is located above the spraying pipe.

[0008] The technical solution is specific, the groove walls on both sides of the storage groove are provided with sliding grooves, the two ends of the lifting plate are located in the sliding grooves, the two end walls of the lifting plate are embedded with balls, each of the balls is in contact with the groove wall of the sliding groove and is slidably connected, the upper surface of the lifting plate is connected to the groove top wall of the storage groove through two spring telescopic cylinders, the two spring telescopic cylinders are fixedly connected to the groove top wall of the storage groove by bolts, and the telescopic ends of the two spring telescopic cylinders are fixed to the lifting plate bolts.

[0009] The technical solution is specific in that square slide grooves are provided at both ends of the lifting plate, a groove is provided at the top of the cover plate, connecting plates are welded on both sides of the top of the cover plate, and push plates are installed on the two connecting plates through the square slide groove bolts, and the lower surfaces of the two push plates are slidably connected to the upper surface of the lifting plate, and a first telescopic cylinder is provided on one side of the upper surface of the lifting plate located on the push plate, and the two first telescopic cylinders are fixedly connected to the lifting plate by bolts.

[0010] Specifically, the template is provided with an injection pipe inside, one end of the injection pipe is connected to the material storage box, the other end of the injection pipe is located in the storage groove and is connected to a first telescopic tube, the bottom end of the first telescopic tube is connected to a horizontal main pipe, the lower surface of the main pipe is connected to a plurality of branch pipes, and the plurality of branch pipes all pass through the outer wall of the cover plate and are connected to the injection pipe.

[0011] The technical solution is specific, the scraping assembly includes a scraper, both ends of the scraper are in contact with the inner wall of the cover plate and are slidably connected, a movable slide groove is opened on the lifting plate on one side of the square slide groove, and mounting plates are provided above the two movable slide grooves. The upper surfaces of the two mounting plates are both equipped with second telescopic cylinders by bolts, and the telescopic ends of the two second telescopic cylinders pass through the mounting plate and the movable slide groove in turn and are fixedly connected to the scraper, and the lower surfaces of the two mounting plates are both slidably connected to the upper surface of the lifting plate.

[0012] Specifically, the top of one side wall of the cover plate is provided with a storage groove, and a moving block is provided in the storage groove. A cleaning block is fixed to the top of one end of the moving block close to the surface of the concrete block, the top wall of the storage groove is flush with the lower surface of the scraper, the scraping surface of the cleaning block is arranged in an arc shape, and the top of the cleaning block is in contact with the top wall of the storage groove, a screw rod is provided above the spray pipe, and a parallel sliding rod is provided on one side of the screw rod, and the other end of the moving block is sleeved on the screw rod and the sliding rod.

[0013] The technical solution is specific, a driving motor is installed on the top of the outer wall of one side of the cover plate by bolts, two ends of the screw rod are rotatably connected to the inner wall of the cover plate and the groove wall of the storage groove respectively, the output end of the driving motor is fixedly connected to the screw rod, two ends of the sliding rod are fixedly connected to the inner wall of the cover plate and the groove wall of the storage groove respectively, the width of the cleaning block is the same as the width of the scraper, a through groove is provided at the bottom of the sliding groove, and the through groove is matched with the driving motor, one side of the top wall of the cover plate and one side of the upper surface of the scraper are respectively embedded with matching sensors and sensor blocks, and the sensor is connected to the driving motor.

[0014] Specifically, the inner bottom of the cover plate is arranged as a material receiving pipe, an opening is provided on the upper surface of the material receiving pipe close to the surface of the concrete block, a suction pump is installed on the side of the material storage box away from the template, the suction end of the suction pump is connected to the suction pipe, the bottom end of the suction pipe is connected to a second telescopic tube, the bottom end of the second telescopic tube is connected to a horizontal cross tube, and the material receiving pipe is connected to the cross tube through a plurality of connecting tubes.

[0015] Specifically, the bottom of the outer wall of the template away from the surface of the concrete block is provided with a plurality of U-shaped grooves, a plurality of the U-shaped grooves are connected to the storage grooves, a plurality of the connecting pipes are matched with the U-shaped grooves, and the opening is the same width as the scraper arranged in the scraping assembly.

[0016] In summary, the present invention mainly has the following beneficial effects: when the template rises, the present invention will automatically repair the exposed surface of the concrete block, fill most of the potholes, reduce the workload of manual repair, and thus reduce labor intensity, and at the same time can realize the recycling of the remaining concrete after repair; First, the prefabricated slender frame columns are installed on the construction site, and then the slipform device is installed on the frame columns. When the template slides up, the spring telescopic cylinder in the bottom receiving groove is activated to push the lifting plate to move down along the sliding groove. The lifting plate that moves down drives the cover plate to move out of the template and stretch the first telescopic tube. Then the first telescopic cylinder works to push the push plate to move, so that the push plate drives the connecting plate to move along the square sliding groove with the cover plate. At this time, the cover plate contacts the exposed surface of the concrete block, and at the same time, the scraping assembly also contacts the surface of the concrete block as the cover plate moves; Then the cement pump in the storage box works to spray concrete from the injection pipe, the first telescopic pipe, the main pipe and multiple branch pipes from the spraying pipe to the surface of the concrete block. Then the first telescopic cylinder of the scraper assembly works to push the scraper down. The scraper pushes the sprayed concrete to move. When passing through the bumpy surface, it is filled with concrete until the scraper moves down to the bottom of the cover plate and is located at the opening of the receiving pipe. The remaining concrete is located in the receiving pipe. At this time, the suction pump works to generate suction in the suction pipe through the suction pipe, the second telescopic pipe, the cross pipe and multiple connecting pipes to send the remaining concrete back into the storage box. Finally, the staff will maintain and clean the exposed surface of the concrete block. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] Figure 1 It is a diagram of the method steps of the present invention; Figure 2 It is a construction schematic diagram of the present invention; Figure 3 It is a schematic diagram of a template of the present invention; Figure 4 It is a cross-sectional structural diagram of the template of the present invention; Figure 5 is a cross-sectional view of the repair mechanism of the present invention; Figure 6 It is a schematic diagram of the cover plate of the present invention; Figure 7 It is the moving block driving diagram of the present invention; Figure 8 It is an enlarged view of point A of the present invention.

[0018] Description of the drawings: 1. Frame column; 2. Sliding mold device; 3. Template; 301. Storage groove; 302. Sliding groove; 3021. Through groove; 303. Injection pipe; 3031. First telescopic pipe; 304. Main pipe; 3041. Branch pipe; 305. U-shaped groove; 4. Repair mechanism; 5. Lifting plate; 501. Ball; 502. Spring telescopic cylinder; 503. Square slide; 504. Moving slide; 6. Cover plate; 601. Groove; 602. Spraying pipe; 603. Receiving pipe; 6031. Open Mouth; 604, connecting plate; 605, push plate; 6051, first telescopic cylinder; 606, storage tank; 7, scraping assembly; 701, scraper; 702, mounting plate; 703, second telescopic cylinder; 704, sensor; 705, drive motor; 706, screw rod; 707, slide bar; 708, moving block; 7081, cleaning block; 709, sensor block; 8, material storage box; 801, suction pump; 802, suction pipe; 8021, second telescopic pipe; 803, horizontal pipe; 804, connecting pipe. DETAILED DESCRIPTION

[0019] The following will be combined with the accompanying drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present invention, and cannot be understood as limiting the present invention.

[0020] The following describes an embodiment of the present invention based on its overall structure. Example

[0021] See also Figure 1-8 As shown, a slipform construction method for a rectangular slender frame column with a prefabricated tie beam comprises the following steps: S1, installation of slender frame columns, transporting the prefabricated frame columns 1 to the construction site, and connecting and installing them with the pre-buried steel plates and steel bars; S2, slide form assembly, the three-dimensional frame, lifting rod, lifting baffle, template 3 operating platform, through-type jack in the slide form device 2 are sequentially installed around the thin and tall frame column, and the template 3 is spaced from the frame column 1 according to the construction requirements; S3, overall sliding, open the through-type jack and climb up along the lifting rod, drive the operating platform to rise, the operating platform drives the template 3 to rise by lifting the baffle, and after rising to a certain position, continue the pouring construction through the template 3; S4, repair, after the template 3 slides up, the lifting plate 5 in the bottom receiving groove 301 moves along the sliding groove 302 under the control of the spring telescopic cylinder 502, and drives the cover plate 6 to move out of the template 3, then the first telescopic cylinder 6051 works to push the push plate 605 to move, and under the action of the connecting plate 604, the cover plate 6 moves along the square sliding groove 503 to cover the exposed concrete outer wall; Then the cement pump in the storage box 8 works to spray concrete from the spraying pipe 602 to the outer wall of the concrete through the pipeline. At this time, the second telescopic cylinder 703 of the scraping assembly 7 works to push the scraper 701 downward to scrape the concrete, and then when encountering potholes, the scraped concrete is used to repair and level it. Finally, the remaining concrete falls into the receiving pipe 603 through the opening 6031, and is sent back to the storage box 8 through the pipeline under the action of the suction pump 801 to complete the repair work.

[0022] The inner template 3 of the present application is also provided with a main control board and a top connected power supply line, which is used for power supply and wirelessly connected to an external controller through the main control board to achieve remote control. The application is suitable for slender and tall rectangular columns, in which the sliding formwork device 2 adopts the existing technology, which is not elaborated in the text.

[0023] See also Figure 2-6 As shown, a receiving groove 301 is provided at the bottom of the template 3, and a repair mechanism 4 is provided in the receiving groove 301, and the repair mechanism 4 is used to repair the exposed surface of the concrete block; The repair mechanism 4 is composed of a lifting plate 5, a cover plate 6, a scraping assembly 7 and a storage box 8. A long strip of spray pipe 602 is horizontally installed on the top of the inner side of the cover plate 6. The storage box 8 is fixed to the top of the outer wall of the template 3. The groove walls on both sides of the storage groove 301 are provided with sliding grooves 302. Both ends of the lifting plate 5 are located in the sliding grooves 302. Balls 501 are embedded in the two end walls of the lifting plate 5. Each of the balls 501 contacts the groove wall of the sliding groove 302 and is slidably connected. The upper surface of the lifting plate 5 is connected to the groove top wall of the storage groove 301 through two spring telescopic cylinders 502. The two spring telescopic cylinders 502 are connected to the storage groove 301 by bolts. The slot top wall of the receiving slot 301 is fixedly connected, the telescopic ends of the two spring telescopic cylinders 502 are fixed with bolts to the lifting plate 5, the lifting plate 5 is provided with square slide grooves 503 at both ends, the top of the cover plate 6 is provided with a groove 601, connecting plates 604 are welded on both sides of the top of the cover plate 6, the two connecting plates 604 are bolted through the square slide grooves 503 and are installed with push plates 605, the lower surfaces of the two push plates 605 are slidably connected to the upper surface of the lifting plate 5, the upper surface of the lifting plate 5 is provided with a first telescopic cylinder 6051 on one side of the push plate 605, and the two first telescopic cylinders 6051 are fixedly connected to the lifting plate 5 by bolts; The cover plate 6 is located on the lower surface of the lifting plate 5 and is slidably connected. The scraping assembly 7 is arranged in the cover plate 6. The scraping assembly 7 is located above the spraying pipe 602. An injection pipe 303 is arranged inside the template 3. One end of the injection pipe 303 is connected to the storage box 8. The other end of the injection pipe 303 is located in the storage groove 301 and is connected to a first telescopic pipe 3031. The bottom end of the first telescopic pipe 3031 is connected to a horizontal main pipe 304. The lower surface of the main pipe 304 is connected to a plurality of branch pipes 3041. The plurality of branch pipes 3041 all penetrate the outer wall of the cover plate 6 and are connected to the spraying pipe 602. A cement pump is installed in the storage box 8 and the output port is connected to the injection pipe 303. The inner bottom of the cover plate 6 is set as a material receiving pipe 603, and an opening 6031 is provided on the upper surface of the material receiving pipe 603 close to the surface of the concrete block. A suction pump 801 is installed on the side of the material storage box 8 away from the template 3, and the suction end of the suction pump 801 is connected to the suction pipe 802, and the bottom end of the suction pipe 802 is connected to the second telescopic tube 8021, and the bottom end of the second telescopic tube 8021 is connected to the horizontal cross pipe 803, and the material receiving pipe 603 is connected to the cross pipe 803 through a plurality of connecting pipes 804. A plurality of U-shaped grooves 305 are provided at the bottom of the outer wall of the template 3 away from the surface of the concrete block, and a plurality of the U-shaped grooves 305 are connected to the receiving grooves 301, and a plurality of the connecting pipes 804 are matched with the U-shaped grooves 305, and the opening 6031 has the same width as the scraper 701 provided in the leveling assembly 7.

[0024] When performing the slipform construction of the prefabricated rectangular slender frame column 1, the staff first installs the prefabricated slender frame column 1 on the construction site, and then installs the slipform device 2 on the frame column 1 for pouring. When the template 3 stops sliding, the staff sends a signal to the main control board through the controller. After receiving the signal, the main control board starts the spring telescopic cylinder 502 to work. The telescopic ends of the two spring telescopic cylinders 502 push the lifting plate 5 to move. Both ends of the moving lifting plate 5 move along the sliding groove 302 through the ball bearings 501. At the same time, the lifting plate 5 will also drive the sliding cover plate 6 to move and adjust the first telescopic tube 3. 031 is stretched, so that the cover plate 6 moves out of the storage groove 301 and the second telescopic tube 8021 is stretched, and at the same time, a plurality of connecting tubes 804 are driven to move out of the U-shaped groove 305. At this time, the two first telescopic cylinders 6051 work, and their telescopic ends push the push plate 605 to move. The push plate 605 moves along the square slide groove 503 through the connecting plate 604. The moving connecting plate 604 moves with the cover plate 6, so that the cover plate 6 contacts the exposed surface of the concrete block. When the cover plate 6 moves, it also drives the scraping assembly 7 to move, and the actuator of the scraping assembly 7 also contacts the exposed surface of the concrete block. Then the cement pump works to send the concrete in the storage box 8 into the injection pipe 303, enters the main pipe 304 along the first telescopic pipe 3031, and enters several branch pipes 3041 to be evenly sprayed from the spray pipe 602 to the exposed surface of the concrete block. At this time, the scraping component 7 works to push the concrete to move, and then fills the potholes on the surface of the concrete block until the actuator of the scraping component 7 moves to the opening 6031 of the receiving pipe 603. The remaining concrete is all in the receiving pipe 603. At this time, the suction pump 801 works to form suction in the receiving pipe 603 through the suction pipe 802, the second telescopic pipe 8021, the cross pipe 803 and several connecting pipes 804, and the remaining concrete is sent back into the storage box 8. After the repair is completed, the telescopic ends of the two first telescopic cylinders 6051 are retracted, and the cover plate 6 is driven to reset through the push plate 605 and the connecting plate 604 until the template 3 slides up again, and the above-mentioned repair work is carried out again; Therefore, when the template 3 rises, the present application will automatically repair the exposed surface of the concrete block, fill most of the potholes, reduce the workload of manual repair, and thus reduce labor intensity, while enabling the recycling of the remaining concrete after repair.

[0025] See also Figure 5-8 As shown, the scraping assembly 7 includes a scraper 701, both ends of which are in contact with the inner wall of the cover plate 6 and are slidably connected. A movable slide groove 504 is provided on the lifting plate 5 on one side of the square slide groove 503. A mounting plate 702 is provided above the two movable slide grooves 504. The upper surfaces of the two mounting plates 702 are both installed with second telescopic cylinders 703 by bolts. The telescopic ends of the two second telescopic cylinders 703 successively penetrate the mounting plate 702 and the movable slide groove 504 and are fixedly connected to the scraper 701. The lower surfaces of the two mounting plates 702 are both slidably connected to the upper surface of the lifting plate 5. The sliding form between the rear ends of the scraper 701 and the inner wall adopts the form of a slide rail. A storage groove 606 is provided at the top of one side wall of the cover plate 6, and a moving block 708 is provided in the storage groove 606. A cleaning block 7081 is fixed to the top of one end of the moving block 708 close to the surface of the concrete block. The top wall of the storage groove 606 is flush with the lower surface of the scraper 701. The scraping surface of the cleaning block 7081 is set in an arc shape, and the top of the cleaning block 7081 contacts the top wall of the storage groove 606. A screw rod 706 is provided above the spray pipe 602, and a parallel sliding rod 707 is provided on one side of the screw rod 706. The other end of the moving block 708 is sleeved on the screw rod 706 and the sliding rod 707. A driving motor 705 is installed on the top of the outer wall of one side of the cover plate 6 by bolts. The two ends of the screw rod 706 are respectively connected to the cover The inner wall of the cover plate 6 and the groove wall of the storage groove 606 are rotatably connected, the output end of the drive motor 705 is fixedly connected to the screw rod 706, the two ends of the slide rod 707 are respectively fixedly connected to the inner wall of the cover plate 6 and the groove wall of the storage groove 606, the width of the cleaning block 7081 is the same as the width of the scraper 701, a through groove 3021 is provided at the bottom of the sliding groove 302, and the through groove 3021 matches the drive motor 705, and one side of the top wall of the cover plate 6 and one side of the upper surface of the scraper 701 are respectively embedded with matching sensors 704 and sensor blocks 709, and the sensor 704 is connected to the drive motor 705, wherein when the cover plate 6 moves out of the storage groove 301, the drive motor 705 will also be moved out through the through groove 3021.

[0026] When the cover plate 6 moves, the scraper 701 can be pushed to move synchronously through the slide rail. The scraper 701 drives the mounting plate 702 to move on the lifting plate 5 along the moving slide groove 504 through the telescopic end of the second telescopic cylinder 703. When it is necessary to scrape the concrete, the two second telescopic cylinders 703 work, and their telescopic ends push the scraper 701 downward. The downwardly moved scraper 701 pushes the concrete to move along the surface of the concrete block, and then fills the potholes on the surface of the concrete block until the scraper 701 is located at the opening 6031 of the receiving tube 603 to collect the remaining concrete. Then the scraper 701 After upward resetting, the induction block 709 contacts the induction block 704, and the induction block 704 sends an electrical signal to the main control board, which starts the driving motor 705 to work, and its output end drives the screw rod 706 to rotate, so that the moving block 708 moves laterally following the rotation of the screw rod 706 under the restriction of the slide bar 707, and the moving moving block 708 drives the cleaning block 7081, and the cleaning block 7081 cleans the lower surface of the scraper 701, removes the adhered concrete, and falls along the arc surface into the receiving tube 603 below, thereby ensuring that the scraper 701 is clean and the subsequent scraping effect is guaranteed.

[0027] The working principle of the present invention is: When performing the slipform construction of the prefabricated rectangular tall and thin frame column 1, the staff first installs the prefabricated tall and thin frame column 1 on the construction site, and then installs the slipform device 2 on the frame column 1 for pouring. When the template 3 stops sliding, the staff sends a signal to the main control board through the controller. After receiving the signal, the main control board starts the spring telescopic cylinder 502 to work. The telescopic ends of the two spring telescopic cylinders 502 push the lifting plate 5 to move. Both ends of the moving lifting plate 5 move along the sliding groove 302 through the ball bearings 501. At the same time, the lifting plate 5 will also drive the sliding cover plate 6 to move and stretch the first telescopic tube 3031, so that the cover plate 6 moves out of the storage groove 301 and the first telescopic tube 3031. The second telescopic tube 8021 is stretched, and at the same time, several connecting tubes 804 are driven to move out of the U-shaped groove 305. When the cover plate 6 moves, the scraper plate 701 can be pushed to move synchronously through the slide rail. The scraper plate 701 drives the mounting plate 702 to move on the lifting plate 5 along the moving slide groove 504 through the telescopic end of the second telescopic cylinder 703. At this time, the two first telescopic cylinders 6051 work, and their telescopic ends push the push plate 605 to move. The push plate 605 moves along the square slide groove 503 through the connecting plate 604. The moving connecting plate 604 moves with the cover plate 6, so that the cover plate 6 contacts the exposed surface of the concrete block, and the scraper plate 701 also contacts the exposed surface of the concrete block. Then the cement pump works to send the concrete in the storage box 8 into the injection pipe 303, enters the main pipe 304 along the first telescopic pipe 3031, and enters the plurality of branch pipes 3041 to be evenly sprayed from the spray pipe 602 onto the exposed surface of the concrete block. At this time, the two second telescopic cylinders 703 work, and their telescopic ends push the scraper 701 downward. The downwardly moved scraper 701 pushes the concrete along the surface of the concrete block to move, and then fills the bumps on the surface of the concrete block until the scraper 701 is located at the opening 6031 of the receiving pipe 603 to collect the remaining concrete, and then the scraper 701 After upward resetting, the induction block 709 contacts the induction sensor 704, and the induction sensor 704 sends an electrical signal to the main control board, which starts the driving motor 705, and its output end drives the screw rod 706 to rotate, so that the moving block 708 moves laterally following the rotation of the screw rod 706 under the restriction of the slide bar 707, and the moving moving block 708 drives the cleaning block 7081, and the cleaning block 7081 cleans the lower surface of the scraper 701, removes the adhered concrete, and falls along the arc surface into the receiving tube 603 below, thereby ensuring the cleanliness of the scraper 701 and the subsequent scraping effect. At this time, the suction pump 801 works, and suction is formed in the receiving pipe 603 through the suction pipe 802, the second telescopic pipe 8021, the horizontal pipe 803 and several connecting pipes 804, so as to send the remaining concrete back into the storage box 8. After the repair is completed, the telescopic ends of the two first telescopic cylinders 6051 are retracted, and the cover plate 6 is driven to reset through the push plate 605 and the connecting plate 604 until the template 3 slides up again, and the above-mentioned repair work is carried out again.

[0028] Although an embodiment of the present invention has been shown and described, this specific embodiment is merely an explanation of the present invention and is not a limitation of the invention. The specific features, structures, materials or characteristics described may be combined in a suitable manner in any one or more embodiments or examples. After reading this specification, those skilled in the art may make modifications, substitutions and variations to the embodiments without creative contributions as needed without departing from the principles and purpose of the present invention. However, as long as they are within the scope of the claims of the present invention, they are protected by patent law.

Claims

1. A slipform construction method for rectangular slender frame columns with prefabricated tie beams, characterized in that , including the following steps: S1. Installation of slender frame columns: transporting the prefabricated frame columns (1) to the construction site and connecting and installing them with the pre-buried steel plates and steel bars; S2, slide form assembly, the three-dimensional frame, lifting rod, lifting baffle, template (3) operating platform, and through-type jack in the slide form device (2) are sequentially installed around the slender and tall frame column, and a spacing is set between the template (3) and the frame column (1) according to the construction requirements; S3, the whole is lifted up, the through-type jack is turned on and it climbs up along the lifting rod, driving the operating platform to rise, and the operating platform drives the template (3) to rise through the lifting baffle, and after it rises to the designated position, the pouring construction is continued through the template (3); S4, repair, after the template (3) slides up, the lifting plate (5) in the bottom receiving groove (301) moves along the sliding groove (302) under the control of the spring telescopic cylinder (502), and drives the cover plate (6) to move out of the template (3), and then the first telescopic cylinder (6051) works to push the push plate (605) to move, and under the action of the connecting plate (604), drives the cover plate (6) to move along the square sliding groove (503) to cover the exposed concrete outer wall; Then, the cement pump in the storage box (8) works to spray concrete from the spraying pipe (602) to the outer wall of the concrete through the pipeline. At this time, the second telescopic cylinder (703) of the scraping assembly (7) works to push the scraper (701) downward to scrape the concrete. Then, when encountering potholes, the concrete is repaired and leveled by the scraped concrete. Finally, the remaining concrete falls into the receiving pipe (603) through the opening (6031) and is re-sent to the storage box (8) through the pipeline under the action of the suction pump (801), completing the repair work. A receiving groove (301) is provided at the bottom of the template (3), and a repair mechanism (4) is provided in the receiving groove (301), and the repair mechanism (4) is used to repair the exposed surface of the concrete block; The repair mechanism (4) is composed of a lifting plate (5), a cover plate (6), a scraping assembly (7) and a material storage box (8); a long strip-shaped spraying pipe (602) is horizontally installed on the top of the inner side of the cover plate (6); and the material storage box (8) is fixed to the top of the outer wall of the template (3); The cover plate (6) is located on the lower surface of the lifting plate (5) and is slidably connected thereto, the scraping assembly (7) is arranged in the cover plate (6), and the scraping assembly (7) is located above the spraying pipe (602); The scraping assembly (7) comprises a scraper (701), both ends of which are in contact with the inner wall of the cover plate (6) and are slidably connected. A movable slide groove (504) is provided on the lifting plate (5) at one side of the square slide groove (503). Two mounting plates (702) are provided above the two movable slide grooves (504). The upper surfaces of the two mounting plates (702) are both mounted with second telescopic cylinders (703) by bolts. The telescopic ends of the two second telescopic cylinders (703) pass through the mounting plate (702) and the movable slide groove (504) in sequence and are fixedly connected to the scraper (701). The lower surfaces of the two mounting plates (702) are both slidably connected to the upper surface of the lifting plate (5). The cover plate (6) A storage groove (606) is provided at the top of one side wall, a moving block (708) is provided in the storage groove (606), a cleaning block (7081) is fixed to the top of one end of the moving block (708) close to the surface of the concrete block, the groove top wall of the storage groove (606) is flush with the lower surface of the scraper (701), the scraping surface of the cleaning block (7081) is arranged in an arc shape, and the top of the cleaning block (7081) contacts the groove top wall of the storage groove (606), a screw rod (706) is provided above the spraying pipe (602), a parallel sliding rod (707) is provided on one side of the screw rod (706), and the other end of the moving block (708) is sleeved on the screw rod (706) and the sliding rod (707); A driving motor (705) is installed on the top of the outer wall of one side of the cover plate (6) by means of bolts; two ends of the screw rod (706) are rotatably connected to the inner wall of the cover plate (6) and the groove wall of the storage groove (606) respectively; the output end of the driving motor (705) is fixedly connected to the screw rod (706); two ends of the sliding rod (707) are fixedly connected to the inner wall of the cover plate (6) and the groove wall of the storage groove (606) respectively; the width of the cleaning block (7081) is the same as the width of the scraper (701); a through groove (3021) is provided at the bottom of one of the sliding grooves (302); the through groove (3021) matches the driving motor (705); a matching sensor (704) and a sensor block (709) are respectively embedded on one side of the top wall of the cover plate (6) and one side of the upper surface of the scraper (701); the sensor (704) is connected to the driving motor (705).

2. A slipform construction method for rectangular slender frame columns with prefabricated tie beams according to claim 1, characterized in that: The groove walls on both sides of the storage groove (301) are provided with sliding grooves (302), and both ends of the lifting plate (5) are located in the sliding grooves (302). Ball bearings (501) are embedded in the two end walls of the lifting plate (5), and each of the balls (501) is in contact with the groove wall of the sliding groove (302) and is slidably connected. The upper surface of the lifting plate (5) is connected to the groove top wall of the storage groove (301) through two spring telescopic cylinders (502), and the two spring telescopic cylinders (502) are fixedly connected to the groove top wall of the storage groove (301) by bolts, and the telescopic ends of the two spring telescopic cylinders (502) are fixed to the lifting plate (5) by bolts.

3. A slipform construction method for rectangular slender frame columns with prefabricated tie beams according to claim 2, characterized in that: The lifting plate (5) is provided with square slide grooves (503) at both ends, the top of the cover plate (6) is provided with a groove (601), connecting plates (604) are welded on both sides of the top of the cover plate (6), and the two connecting plates (604) are bolted with push plates (605) through the square slide grooves (503), and the lower surfaces of the two push plates (605) are slidably connected to the upper surface of the lifting plate (5), and the upper surface of the lifting plate (5) is provided with a first telescopic cylinder (6051) on one side of the push plate (605), and the two first telescopic cylinders (6051) are fixedly connected to the lifting plate (5) by bolts.

4. The slipform construction method of a rectangular slender frame column with prefabricated tie beams according to claim 1, characterized in that: The template (3) is provided with a material injection pipe (303) inside, one end of the material injection pipe (303) is connected to the material storage box (8), the other end of the material injection pipe (303) is located in the storage groove (301) and is connected to a first telescopic pipe (3031), the bottom end of the first telescopic pipe (3031) is connected to a horizontal main pipe (304), the lower surface of the main pipe (304) is connected to a plurality of branch pipes (3041), and the plurality of branch pipes (3041) all penetrate the outer wall of the cover plate (6) and are connected to the material injection pipe (602).

5. The slipform construction method of a rectangular slender frame column with prefabricated tie beams according to claim 1, characterized in that: The inner bottom of the cover plate (6) is provided with a material receiving pipe (603), and an opening (6031) is provided on the upper surface of the material receiving pipe (603) close to the surface of the concrete block. A suction pump (801) is installed on the side of the material storage box (8) away from the template (3), and the suction end of the suction pump (801) is connected to the suction pipe (802), and the bottom end of the suction pipe (802) is connected to a second telescopic pipe (8021), and the bottom end of the second telescopic pipe (8021) is connected to a horizontal cross pipe (803), and the material receiving pipe (603) is connected to the cross pipe (803) through a plurality of connecting pipes (804).

6. A slipform construction method for rectangular slender frame columns with prefabricated tie beams according to claim 5, characterized in that: A plurality of U-shaped grooves (305) are provided at the bottom of the outer wall of the template (3) away from the surface of the concrete block, and the plurality of U-shaped grooves (305) are connected to the receiving grooves (301), and the plurality of connecting pipes (804) are matched with the U-shaped grooves (305). The opening (6031) has the same width as a scraper (701) provided in the scraping assembly (7).

Citation Information

Patent Citations

  • Clinker warehouse cylinder slip-form construction device

    CN108560907A

  • Bridge thin-wall high pier hydraulic slip-form construction method

    CN108914780A

  • Slip form platform for beam and slab concrete structure construction

    CN113530217A

  • Ultrahigh rectangular column slip form and operation platform construction method

    CN115898010A

  • Construction device and method for integrally forming radiation-proof wall of medical radiation department

    CN117738459A