Condensate water recycling and feeding device for through-flow steam boiler
By designing a condensate water recovery and feeding device for the through-flow steam boiler, the condensate water is mixed with saturated steam and heated with the waste heat of flue gas, the problem of unused condensate heat is solved, and the recycling and recycling of condensate water is realized, ensuring that The deoxygenation requirements of water reduce resource waste.
Patent Information
- Application Number
- CN202411261303.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-09
- Publication Date
- 2024-11-15
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The heat of condensate water generated by the throughflow steam boiler during use is not effectively utilized, resulting in economic losses and waste of resources.
A condensate recovery water supply device for a through-flow steam boiler is designed, including a condensate recovery tank, a water heating module, a softened water pipe, a steam pipe, a condensate pipe and a sewage pipe. By mixing the condensed water with saturated steam and utilizing the waste heat of the flue gas Heating is carried out to achieve the recycling and recycling of condensate.
The heat of condensate is effectively utilized, and the recovery and heating of condensate is realized, ensuring that the water delivered to the boiler meets the requirements of water supply and deoxygenation, and reducing resource waste and economic losses.
Smart Images

Figure CN118959986A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of energy conservation and emission reduction of industrial boilers, and in particular to a condensate recovery and water supply device for a cross-flow steam boiler. Background Art
[0002] With the industrial structure adjustment, renovation of old districts and construction of industrial zones in large and medium-sized cities, the implementation of coal-free policies in central urban areas, and the promotion of energy-saving and emission-reduction policies such as regional centralized heating and cogeneration, through-flow steam boilers are often used in the field of centralized heating due to their large capacity, stable parameters, obvious efficiency and low emissions. During the use of steam boilers, the high-temperature steam generated by the boiler releases the latent heat of vaporization in various steam-using equipment to form condensed water. The heat of condensed water can reach 20% to 30% of the total heat of steam. If the condensed water is directly discharged to the sewage treatment plant, the heat of the condensed water will be wasted, causing certain economic losses.
[0003] How to utilize the heat of condensed water when the cross-flow steam boiler is working has become an urgent problem to be solved. Summary of the invention
[0004] In view of this, the present application proposes a condensate recovery and water supply device for a cross-flow steam boiler, which is suitable for utilizing the heat of condensate when the cross-flow steam boiler is working.
[0005] According to one aspect of the present application, there is provided a condensate recovery and water supply device for a through-flow steam boiler, comprising: a condensate recovery tank, a water heating module, a softening water pipe, a steam pipe, a condensate pipe, a drain pipe and a boiler feed water pipe;
[0006] The condensate recovery tank is provided with a first water inlet, a second water inlet, and a water outlet; one end of the condensate water pipe is suitable for receiving condensate, and the other end of the condensate water pipe is connected to the first water inlet of the condensate recovery tank; the water outlet of the condensate recovery tank is connected to the boiler feed water pipe;
[0007] One end of the steam pipe is suitable for connecting to saturated steam, and the other end of the steam pipe is inserted into the cavity of the condensate recovery tank, and is suitable for sending the saturated steam into the condensate recovery tank;
[0008] The softened water pipe is connected to one of the water inlets of the water heating module, and is suitable for introducing softened water into the water heating module; the water outlet of the water heating module is connected to the water inlet of the flue gas waste heat recovery device of the cross-flow steam boiler, the water outlet of the flue gas waste heat recovery device is connected to another water inlet of the water heating module, and the water outlet of the water heating module is connected to the second water inlet of the condensate recovery tank;
[0009] The water heating module is provided with a hot water coil, the sewage outlet and the condensed water pipe of the cross-flow steam boiler are connected to the sewage pipe, and the sewage pipe is connected to the hot water coil.
[0010] In one possible implementation, a water quality detector is provided at the water inlet end of the condensate pipe, which is suitable for detecting the water quality of the condensate. When the water quality of the condensate is detected to be qualified, the condensate pipe is connected to the condensate recovery tank to allow the condensate to enter the condensate recovery tank; when the water quality of the condensate is detected to be unqualified, the condensate pipe is connected to the sewage pipe to allow the condensate to enter the sewage pipe.
[0011] In a possible implementation, an ejector is provided at one end of the steam pipe that extends into the condensate recovery tank.
[0012] In a possible implementation, the water heating module includes: a soft water tank and a hot water tank;
[0013] The soft water tank is provided with a first water inlet and a water outlet, the softening water pipe is connected to the first water inlet of the soft water tank, the water outlet of the soft water tank is connected to the water inlet of the flue gas waste heat recovery device, the water outlet of the flue gas waste heat recovery device is connected to the water inlet of the hot water tank; the water outlet of the hot water tank is connected to the second water inlet of the condensate recovery tank;
[0014] The hot water coil is arranged inside the cavity of the hot water tank.
[0015] In a possible implementation, the hot water tank is provided with an overflow port, and the soft water tank is provided with a second water inlet;
[0016] The overflow port of the hot water tank is connected to the second water inlet of the soft water tank.
[0017] In a possible implementation, the water outlet of the soft water tank is connected to the water inlet of the flue gas waste heat recovery device through a first heating pipe, and a first heating device is provided on the first heating pipe.
[0018] In a possible implementation, the water outlet of the hot water tank is connected to the second water inlet of the condensate recovery tank through a second heating pipe, and the second heating pipe is provided with a second heating device.
[0019] In a possible implementation, the condensate recovery tank is provided with an overflow port, and the overflow port of the condensate recovery tank is connected to the interior of the cavity of the hot water tank through an overflow pipe.
[0020] In a possible implementation, the condensate recovery tank is provided with a flash steam discharge port, and the flash steam discharge port is connected to the interior of the cavity of the hot water tank through a flash steam discharge pipe.
[0021] In a possible implementation, the boiler feed water pipe is provided with a pressure boosting device, which is suitable for delivering water in the boiler feed water pipe into the cross-flow steam boiler.
[0022] Beneficial effect: The condensed water generated by the equipment is heated and deoxygenated in the condensed water recovery tank by the saturated steam generated by the cross-flow steam boiler, and is mixed with the water delivered by the water heating module and then delivered to the cross-flow steam boiler. The entire work realizes the cycle process of recovering condensed water, heating the feed water, and then recovering the newly generated condensed water, thereby realizing the effective recycling of condensed water and ensuring that the water delivered to the cross-flow steam boiler meets the feed water deoxygenation requirements.
[0023] Other features and aspects of the present application will become apparent from the following detailed description of exemplary embodiments with reference to the attached drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] The accompanying drawings, which are incorporated in and constitute a part of the specification, illustrate exemplary embodiments, features, and aspects of the present application and, together with the description, serve to explain the principles of the present application.
[0025] Figure 1 A main structural diagram showing a condensate recovery and water supply device for a cross-flow steam boiler according to one embodiment of the present application;
[0026] Figure 2 A general connection diagram showing a condensate recovery and water supply device for a through-flow steam boiler according to one embodiment of the present application;
[0027] Figure 3 A front view of a condensate recovery tank according to an embodiment of the present application is shown;
[0028] Figure 4 Show Figure 2 A partial enlarged view of
[0029] Figure 5 Show Figure 2 A partial enlarged view of
[0030] Figure 6 Show Figure 2 A partial enlarged view of
[0031] Figure 7 Show Figure 2 A partial enlarged view of
[0032] Figure 8 A general connection diagram of a condensate recovery and water supply device for a through-flow steam boiler according to another embodiment of the present application is shown. DETAILED DESCRIPTION
[0033] Various exemplary embodiments, features and aspects of the present application will be described in detail below with reference to the accompanying drawings. The same reference numerals in the accompanying drawings represent elements with the same or similar functions. Although various aspects of the embodiments are shown in the accompanying drawings, the drawings are not necessarily drawn to scale unless otherwise specified.
[0034] Among them, it should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application or simplifying the description, and do not indicate or imply that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, and therefore should not be understood as a limitation on the present application.
[0035] In addition, the terms "first" and "second" are used for descriptive purposes only and should not be understood as indicating or implying relative importance or implicitly indicating the number of the indicated technical features. Thus, a feature defined as "first" or "second" may explicitly or implicitly include one or more of the features. In the description of this application, the meaning of "plurality" is two or more, unless otherwise clearly and specifically defined.
[0036] The word “exemplary” is used exclusively herein to mean “serving as an example, example, or illustration.” Any embodiment described herein as “exemplary” is not necessarily to be construed as preferred or advantageous over other embodiments.
[0037] In addition, in order to better illustrate the present application, numerous specific details are given in the following specific embodiments. It should be understood by those skilled in the art that the present application can also be implemented without certain specific details. In some examples, methods, means, components and circuits well known to those skilled in the art are not described in detail in order to highlight the subject matter of the present application.
[0038] Figure 1 The main structure diagram of a condensate recovery and water supply device for a through-flow steam boiler in one embodiment of the present application is shown. Figure 1As shown, the condensate recovery and water supply device for a through-flow steam boiler comprises: a condensate recovery tank 200, a water heating module, a softening water pipe 800, a steam pipe 700, a condensate pipe 600, a drain pipe 120 and a boiler feed water pipe 130; the condensate recovery tank 200 is provided with a first water inlet 201, a second water inlet 202 and a water outlet 203; one end of the condensate pipe 600 is suitable for receiving condensate, and the other end of the condensate pipe 600 is connected to the first water inlet 201 of the condensate recovery tank 200; the water outlet 203 of the condensate recovery tank 200 is connected to the boiler feed water pipe 130; one end of the steam pipe 700 is suitable for receiving saturated steam, and the other end of the steam pipe 700 is inserted into the condensate recovery tank 200; The interior of the cavity of the collecting tank 200 is suitable for delivering saturated steam into the condensate recovery tank 200; the softening water pipe 800 is connected to one of the water inlets of the water heating module, and is suitable for introducing softened water into the water heating module; the water outlet of the water heating module is connected to the water inlet of the flue gas waste heat recovery device 110 of the cross-flow steam boiler 100, the water outlet of the flue gas waste heat recovery device 110 is connected to another water inlet of the water heating module, and the water outlet of the water heating module is connected to the second water inlet 202 of the condensate recovery tank 200; the water heating module is provided with a hot water coil 121, the sewage outlet of the cross-flow steam boiler 100 and the condensate pipe 600 are both connected to the sewage pipe 120, and the sewage pipe 120 is connected to the hot water coil 121.
[0039] Here, it should be noted that the condensate pipe 600 is suitable for collecting the condensate generated by the equipment and collecting it into the condensate recovery tank 200; the steam pipe 700 is suitable for connecting the saturated steam generated by the boiler and conveying it to the condensate recovery tank 200. When the temperature of the condensate received by the condensate recovery tank 200 cannot meet the boiler feed water deoxygenation requirement, the saturated steam conveyed by the steam pipe 700 heats up the water in the condensate recovery tank 200 to achieve deoxygenation for use by the cross-flow steam boiler 100; the water heating module is suitable for receiving and collecting softened water and conveying it to the flue gas waste heat recovery device 110 of the cross-flow steam boiler 100. The cross-flow steam boiler 100 During operation, flue gas is generated, and the flue gas also carries heat. This part of the heat is recovered through the flue gas waste heat recovery device 110 of the cross-flow steam boiler 100. The water heating module transports softened water to the flue gas waste heat recovery device 110, and pre-heats it using the heat carried by the flue gas. The water is then transported back to the water heating module. The water heating module then transports the softened water to the condensate recovery tank 200, where it is heated and deoxygenated together with the internal condensed water by the saturated steam transported by the steam pipe 700. Finally, the water in the condensate recovery tank 200 is transported to the interior of the cross-flow steam boiler 100 through the boiler feed water pipe 130 to be supplied to the cross-flow steam boiler 100 for use. The wastewater generated by the cross-flow steam boiler 100 during operation enters the sewage pipe 120. Since this part of water is polluted and cannot be directly supplied for use, it needs to be discharged through the sewage pipe 120. However, since the wastewater also carries a large amount of heat, the wastewater is first introduced into the hot water coil 121 of the water heating module before being discharged, and the water in the water heating module is heated by heat exchange through the hot water coil 121. Therefore, the water in the water heating module is heated twice by the flue gas waste heat recovery device 110 and the hot water coil 121, which effectively utilizes the flue gas heat generated by the cross-flow steam boiler 100 during operation and the wastewater heat discharged by the cross-flow steam boiler 100 during operation, and realizes the temperature increase and deoxygenation before entering the condensate recovery tank 200. The condensed water generated by the equipment is heated and deoxygenated in the condensed water recovery tank 200 by the saturated steam generated by the cross-flow steam boiler 100, and is mixed with the water delivered by the water heating module and then delivered to the cross-flow steam boiler 100. The entire work realizes the recycling process of condensed water and heated feed water, realizes the effective recycling of condensed water, and ensures that the water delivered to the cross-flow steam boiler 100 meets the feed water deoxygenation requirements.
[0040] It should be noted that the flue gas waste heat recovery device is a built-in equipment of the cross-flow steam boiler, which is installed at the smoke outlet of the boiler. The waste heat of the flue gas can be recovered and the heat of the flue gas can be used to exchange heat with soft water.
[0041] It should be noted that saturated steam is steam at a temperature of 100 degrees under one atmospheric pressure. The temperature cannot be raised any further and it is steam in a saturated state. Due to its high temperature, the present application can recycle this part of the temperature for heating condensed water to save resources and reduce emissions.
[0042] First embodiment:
[0043] In a possible implementation, a first liquid flow meter 615 is provided at the water inlet end of the condensing water pipe 600 , and the first liquid flow meter 615 is suitable for detecting the water flow at the water inlet end of the condensing water pipe 600 .
[0044] In one possible implementation, Figure 5 As shown, the condensate pipe 600 is provided with a filter 610; the first liquid flow meter 615 and the filter 610 are arranged in sequence along the flow direction of the condensate in the condensate pipe 600. The water inlet end of the filter 610 is provided with a valve 611, and the water outlet end is provided with a valve 612, which is suitable for connecting and shutting off the filter 610 by controlling the opening and closing of the valve. Here, it should be noted that the filter 610 is suitable for purifying the condensate and filtering out impurities in the condensate. Furthermore, the condensate pipe 600 is also provided with a bypass pipe 613, and the two ends of the bypass pipe 613 are connected to the condensate pipe 600 and are respectively located at the two ends of the filter 610, and a bypass valve 614 is also provided on the bypass pipe 613; it should be noted here that the two ends of the bypass pipe are directly connected to the water inlet front end and the water outlet rear end of the filter 610, which is suitable for when the condensate flows through the bypass pipe 613 without passing through the filter 610, by controlling the valve 611, the valve 612, and the bypass valve 614, to adjust whether to add the filter 610 to the system process. If it is not necessary to filter and remove impurities from the condensate, the valve 611 at the water inlet end and the valve 612 at the water outlet end of the filter 610 are closed, and the bypass valve 614 of the bypass pipe 613 is opened; if it is necessary to filter and remove impurities from the condensate, the valve 611 at the water inlet end and the valve 612 at the water outlet end of the filter 610 are opened, and the bypass valve 614 of the bypass pipe 613 is closed.
[0045] In one possible implementation, Figure 5 As shown, the condensate pipe 600 is provided with a condensate pressure reducing discharge pipe 630, and the condensate pressure reducing discharge pipe 630 is provided with a stop valve, which is suitable for opening the stop valve for pressure reducing safety protection when the water flow in the condensate pipe 600 is too large.
[0046] In a possible implementation, a water quality detector 620 is provided at the water inlet end of the condensate pipe 600, and the first liquid flow meter 615, the filter 610, and the water quality detector 620 are arranged in sequence along the flow direction of the condensate in the condensate pipe 600. It should be noted that the cross-flow steam boiler 100 has certain requirements for water quality, and the water quality should meet the industrial boiler water quality standard GB / T1576; the water quality detector 620 is suitable for testing the water quality of the condensate, so as to determine whether the condensate meets the water quality conditions. When the water quality of the condensate is qualified, the condensate enters the condensate recovery tank 200, and when the water quality of the condensate is unqualified, the condensate enters the sewage pipe 120.
[0047] Furthermore, the water quality detector 620 is a conductivity detector, which is mainly used to measure the concentration of ions or salt content in a liquid, and its measurement principle is based on the conductivity of an electrolyte solution.
[0048] Further, such as Figure 5 As shown, the condensate pipe 600 is connected to the drain pipe 120 through a connecting pipe 601, and a stop valve 602, an electric valve 603 and a check valve 604 are arranged on the connecting pipe 601. The stop valve 602, the valve 603 and the check valve 604 are arranged in sequence along the flow direction of the condensate in the connecting pipe 601. Under normal working conditions, the stop valve 602 and the check valve 604 remain in a normally open state; the condensate pipe 600 is provided with a stop valve 621, an electric valve 622 and a check valve 623, and the stop valve 621 , the electric valve 622 and the check valve 623 are arranged in sequence along the flow direction of the condensed water in the condensed water pipe 600. Under normal working conditions, the stop valve 621 and the check valve 623 remain normally open; when the water quality of the condensed water is unqualified, the electric valve 603 is opened, the electric valve 622 is closed, and the condensed water flows from the connecting pipe 601 into the drain pipe 120; when the water quality of the condensed water is qualified, the electric valve 603 is closed, the electric valve 622 is opened, and the condensed water flows from the condensed water pipe 600 into the condensed water recovery tank 200.
[0049] In one possible implementation, Figure 5 As shown, the condensate pipe 600 is also provided with a second liquid flow meter 624, and the check valve 623 and the second liquid flow meter 624 are arranged in sequence along the flow direction of the condensate in the condensate pipe 600; it should be noted that the second liquid flow meter 624 is suitable for measuring the instantaneous flow of condensate with qualified water quality entering the condensate recovery tank 200.
[0050] In one possible implementation, Figure 1 or Figure 7As shown, the water outlet end of the condensate pipe 600 extends from the first water inlet 201 of the condensate recovery tank 200 into the cavity of the condensate recovery tank 200, and a water distributor 640 is provided at the water outlet end of the condensate pipe 600. Under the action of the water distributor 640, the condensate flows evenly into the cavity of the condensate recovery tank 200, which is beneficial to the fusion rate of the condensate and softened water.
[0051] In one possible implementation, Figure 7 As shown, an ejector 720 is provided at one end of the steam pipe 700 that extends into the condensate recovery tank 200; the ejector 720 is placed in water, ejects saturated steam to heat the water, and reduces the noise and vibration generated during the saturated steam heating process.
[0052] In one possible implementation, Figure 1 As shown, the steam pipe 700 is provided with a first valve group 710, which is suitable for controlling the on and off of saturated steam. When the water temperature in the condensate recovery tank 200 reaches the requirement, saturated steam is not needed for heating, and the first valve group 710 is closed to block the saturated steam out; when the water temperature in the condensate recovery tank 200 does not reach the requirement, saturated steam is needed for further heating, and the first valve group 710 is opened, and saturated steam is sprayed into the condensate recovery tank 200.
[0053] Further, such as Figure 7 As shown, the first valve group 710 includes: a stop valve 711, a Y-type filter 712, an electric valve 713, a check valve 714, and a stop valve 715; the stop valve 711, the Y-type filter 712, the electric valve 713, the check valve 714, and the stop valve 715 are arranged in sequence along the direction of saturated steam flow in the steam pipe 700, and under normal working conditions, the stop valve 711, the check valve 714, and the stop valve 715 are all kept in a normally open state.
[0054] Furthermore, the steam pipe 700 is provided with a bypass pipe 716, and both ends of the bypass pipe 716 are connected to both ends of the first valve group 710, which is suitable for when the first valve group 710 fails, the saturated steam enters the condensate recovery tank 200 from the bypass pipe 716. Furthermore, there is a bypass valve 717 on the bypass pipe 716, which is suitable for controlling the on-off of the bypass pipe 716. Under normal working conditions, the bypass valve 717 remains closed.
[0055] In one possible implementation, Figure 1 As shown, the condensate recovery tank 200 is provided with a temperature sensor 290. The detection end of the temperature sensor 290 is located inside the cavity of the condensate recovery tank 200 and is suitable for detecting the temperature of the water in the condensate recovery tank 200, so as to determine whether saturated steam is needed to heat it.
[0056] In a possible implementation, the water heating module includes: a soft water tank 400 and a hot water tank 500; the soft water tank 400 is provided with a first water inlet and a water outlet, the softening water pipe 800 is connected to the first water inlet of the soft water tank 400, the water outlet of the soft water tank 400 is connected to the water inlet of the flue gas waste heat recovery device 110, and the water outlet of the flue gas waste heat recovery device 110 is connected to the water inlet of the hot water tank 500; the water outlet of the hot water tank 500 is connected to the second water inlet 202 of the condensate recovery tank 200; and the hot water coil 121 is arranged inside the cavity of the hot water tank 500. Here, it should be noted that the soft water tank 400 is suitable for receiving and collecting the softened water collected by the softening water pipe 800 and delivering it to the flue gas waste heat recovery device 110, and the hot water tank 500 is suitable for receiving and collecting the softened water heated from the flue gas waste heat recovery device 110 and delivering it to the condensate recovery tank 200.
[0057] In one possible implementation, Figure 4 As shown, the softened water pipe 800 is provided with a hardness detector 810, a stop valve 821, and an electric valve 820. The hardness detector 810, the stop valve 821, and the electric valve 820 are arranged in sequence along the flow direction of the water in the softened water pipe 800. The hardness detector 810 is suitable for detecting the hardness of the water in the softened water pipe 800. If the water hardness (calcium salt, magnesium salt) exceeds the standard, the cross-flow steam boiler 100 is prone to scale, which is very harmful to the safety and economic operation of the boiler; the stop valve 821 and the electric valve 820 are suitable for controlling the opening and closing of the softened water pipe 800. The softened water pipe 800 is provided with a bypass pipe 830, and the through channel 830 is provided with a bypass valve 831, which is suitable for the softened water to directly enter the soft water tank 400 from the bypass pipe 830 when the stop valve 821 and the electric valve 820 fail. Under normal working conditions, the stop valve 821 remains in a normally open state, and the bypass valve 831 remains in a normally closed state.
[0058] Further, such as Figure 1 As shown, the water outlet of the soft water tank 400 is connected to the water inlet of the flue gas waste heat recovery device 110 through a first heating pipe 410, and a first heating device 440 is provided on the first heating pipe 410. It should be noted that the first heating device 440 is suitable for heating the softened water for the first time before entering the flue gas waste heat recovery device 110. The first heating device 440 includes: a first heating pump 444 and a second valve group; Figure 4As shown, the second valve group includes: a gate valve 441, a Y-type filter 442, a soft connection 443, a soft connection 445, a check valve 446 and a stop valve 447; the gate valve 441, the Y-type filter 442, the soft connection 443, the first heating pump 444, the soft connection 445, the check valve 446 and the stop valve 447 are arranged in sequence along the flow direction of water in the first heating pipe 410, and the first heating pump 444 is arranged between the soft connection 443 and the soft connection 445. Under normal working conditions, the gate valve 441, the check valve 446 and the stop valve 447 are all kept in a normally open state. It should be noted that the first heating pump 444 is suitable for pumping water and heating water, the second valve group is suitable for controlling the on and off of the first heating pipe 410, the Y-type filter 442 is suitable for filtering water to prevent impurities from entering the flue gas waste heat recovery device 110, and the soft connection 443 and the soft connection 445 are suitable for compensation and vibration isolation and noise reduction.
[0059] Further, such as Figure 1 As shown, there are two first heating devices 440, the first heating tube 410 is provided with a branch tube 430, both ends of the branch tube 430 are connected to the first heating tube 410, and the two first heating devices 440 are respectively arranged on the first heating tube 410 and the branch tube 430, and the structures of the two first heating devices 440 are the same. Here, it should be noted that the arrangement of the two pipelines can effectively improve the circulation efficiency of the softened water, and the arrangement of the two first heating devices 440 can effectively improve the heating efficiency of the softened water.
[0060] In one possible implementation, Figure 4 As shown, a gate valve 411 is provided at one end of the first heating pipe 410 connected to the soft water tank 400 , and a valve is also provided at one end of the first heating pipe 410 connected to the flue gas waste heat recovery device 110 , which is suitable for opening and closing the pipeline to control the outflow of softened water from the soft water tank 400 .
[0061] In one possible implementation, Figure 1 As shown, the water outlet of the flue gas waste heat recovery device 110 is connected to the water inlet of the hot water tank 500 through a return pipe 420. Both ends of the return pipe 420 are provided with valves suitable for opening and closing the pipeline to control the flow of softened water into the hot water tank 500.
[0062] In a possible implementation, the hot water tank 500 is provided with an overflow port, and the soft water tank 400 is provided with a second water inlet; the overflow port of the hot water tank 500 is connected to the second water inlet of the soft water tank 400. Figure 1 As shown, an overflow port is provided on the side wall of the hot water tank 500, and a second water inlet is provided on the side wall of the soft water tank 400. The overflow port of the hot water tank 500 is connected to the second water inlet of the soft water tank 400 through a second overflow pipe 520. When the water level line in the hot water tank 500 exceeds the overflow port, the water in the hot water tank 500 flows back into the soft water tank 400 through the second overflow pipe 520.
[0063] Further, such as Figure 6 As shown, a third discharge pipe 550 is provided at the bottom of the hot water tank 500 and a gate valve 551 is provided on the third discharge pipe 550. The third discharge pipe 550 is suitable for discharging water when the water in the hot water tank 500 is full to avoid excessive water pressure from damaging the hot water tank 500.
[0064] In one possible implementation, Figure 4 As shown, an overflow port is also provided on the side wall of the soft water tank 400. The overflow port of the soft water tank 400 is located lower than the second water inlet of the soft water tank 400. When the water level in the soft water tank 400 exceeds the overflow port, the water in the soft water tank 400 flows out of the soft water tank 400 through the third overflow pipe 460.
[0065] Furthermore, a fourth discharge pipe 470 is provided at the bottom of the soft water tank 400 and a gate valve 471 is provided on the fourth discharge pipe 470 . The fourth discharge pipe 470 is suitable for discharging water when the water in the soft water tank 400 is full to avoid damaging the soft water tank 400 due to excessive water pressure.
[0066] In a possible implementation, the water outlet of the hot water tank 500 is connected to the second water inlet 202 of the condensate recovery tank 200 through the second heating pipe 510, and the second heating pipe 510 is provided with a second heating device 540. It should be noted that the second heating device 540 is suitable for heating the water in the hot water tank 500 again before entering the condensate recovery tank 200. The second heating device 540 includes: a second heating pump 544 and a third valve group; Figure 6 As shown, the third valve group includes: a gate valve 541, a Y-type filter 542, a soft connection 543, a soft connection 545, a check valve 546, and a stop valve 547 arranged in sequence along the flow direction of water in the second heating pipe 510; the second heating pump 544 is arranged between the soft connection 543 and the soft connection 545. Under normal working conditions, the gate valve 541, the check valve 546, and the stop valve 547 are all kept in a normally open state.
[0067] Further, such as Figure 1 As shown, there are two second heating devices 540, the second heating pipe 510 is provided with a branch pipe 530, both ends of the branch pipe 530 are connected to the second heating pipe 510, and the two second heating devices 540 are respectively arranged on the second heating pipe 510 and the branch pipe 530, and the structures and valve arrangement of the two second heating devices 540 are the same. Here, it should be noted that the setting of two pipelines can effectively improve the circulation efficiency of water, and the setting of two second heating devices 540 can effectively improve the heating efficiency of water.
[0068] In one possible implementation, Figure 6As shown, a gate valve 511 is provided at one end of the second heating pipe 510 connected to the hot water tank 500. Figure 7 As shown, a gate valve 512 is provided at one end of the second heating pipe 510 connected to the condensed water recovery tank 200, which is suitable for opening and closing the pipeline to control the outflow of water from the hot water tank 500. Further, under normal working conditions, the gate valve 511 and the gate valve 512 remain in a normally open state.
[0069] In one possible implementation, the condensate recovery tank 200 is provided with an overflow port 204, and the overflow port 204 of the condensate recovery tank 200 is connected to the interior of the cavity of the hot water tank 500 through a first overflow pipe 210. When the water level line in the condensate recovery tank 200 exceeds the maximum water level, the water in the condensate recovery tank 200 flows out of the condensate recovery tank 200 and flows back to the hot water tank 500 through the first overflow pipe 210.
[0070] Furthermore, the first overflow pipe 210 is provided with a sixth valve group 230; the sixth valve group 230 is adapted to control the on-off of the first overflow pipe 210. Figure 6 As shown, the sixth valve group 230 includes: a stop valve 231, a Y-type filter 232, an electric valve 233, a check valve 234 and a stop valve 235 arranged in sequence along the flow direction of water in the first overflow pipe 210. Under normal working conditions, the stop valve 231, the check valve 234 and the stop valve 235 are all kept in a normally open state.
[0071] In a possible implementation, the first overflow pipe 210 is provided with a bypass pipe 236 and the bypass pipe 236 is provided with a bypass valve 237, and both ends of the bypass pipe 236 are respectively connected to both ends of the sixth valve group 230, so that when the sixth valve group 230 fails, water directly enters the hot water tank 500 from the bypass pipe 236. Under normal working conditions, the bypass valve 237 remains in a normally closed state.
[0072] In a possible implementation, the condensate recovery tank 200 is provided with a flash steam discharge port 205, and the flash steam discharge port 205 is connected to the interior of the cavity of the hot water tank 500 through a flash steam discharge pipe 220. When there is too much flash steam in the condensate recovery tank 200, causing the air pressure in the condensate recovery tank 200 to exceed the standard, the flash steam in the condensate recovery tank 200 flows out of the condensate recovery tank 200 and flows into the hot water tank 500 through the flash steam discharge pipe 220.
[0073] Further, such as Figure 6As shown, the flash steam discharge pipe 220 is provided with a first pressure sensor 222 and a fourth valve group 240; the detection end of the first pressure sensor 222 is located inside the cavity of the flash steam discharge pipe 220 and is suitable for detecting the gas pressure in the flash steam discharge pipe 220, and the fourth valve group 240 is suitable for controlling the on-off of the flash steam discharge pipe 220. Furthermore, the fourth valve group 240 includes a stop valve 241, a Y-type filter 242, an electric valve 243, a check valve 244, and a stop valve 245; the first pressure sensor 222, the stop valve 241, the Y-type filter 242, the electric valve 243, the check valve 244, and the stop valve 245 are arranged in sequence along the flow direction of the flash steam in the flash steam discharge pipe 220. Under normal working conditions, the stop valve 241, the check valve 244, and the stop valve 245 remain in a normally open state.
[0074] It should be noted that if Figure 3 As shown, the condensate recovery tank 200 is provided with a pressure measuring pipe 271, which is connected to the interior of the cavity of the condensate recovery tank 200. A second pressure sensor 270 is provided on the pressure measuring pipe 271. The detection end of the second pressure sensor 270 is located inside the pressure measuring pipe 271, and is suitable for detecting the pressure inside the condensate recovery tank 200. When the second pressure sensor 270 detects that the pressure inside the condensate recovery tank 200 exceeds the standard range, the electric valve 243 opens, and the flash gas flows out from the steam discharge pipe 220.
[0075] In one possible implementation, Figure 6 As shown, the flash steam discharge pipe 220 is provided with a bypass pipe 223 and the bypass pipe 223 is provided with a bypass valve 244, and both ends of the bypass pipe 223 are respectively connected to both ends of the fourth valve group 240, so that when the fourth valve group 240 fails, the flash steam directly enters the hot water tank 500 from the bypass pipe 223. Under normal working conditions, the bypass valve 244 remains closed.
[0076] It should be noted that if Figure 1 As shown, the flash steam discharge pipe 220 and the first overflow pipe 210 merge into a main pipe and extend into the cavity of the hot water tank 500, and a water distributor 221 is provided at one end of the main pipe extending into the hot water tank 500. Under the action of the water distributor 221, the flash steam and water flow evenly into the hot water tank 500.
[0077] In a possible implementation, the sewage outlet of the cross-flow steam boiler 100 is connected to the sewage pipe 120, and one end of the sewage pipe 120 is connected to the water inlet end of the hot water coil 121 inside the hot water tank 500. It should be noted that the sewage pipe 120 and the hot water coil 121 are sealed and connected by welding to prevent wastewater from flowing into the hot water tank 500. Furthermore, the main body of the hot water coil 121 is a multi-layered coil structure, which can increase the heat exchange area and heat exchange efficiency. The water outlet end of the hot water coil 121 directly discharges sewage.
[0078] In one possible implementation, Figure 1 As shown, the boiler feed water pipe 130 is provided with a pressurizing device 140, which is suitable for sending water in the boiler feed water pipe 130 into the cross-flow steam boiler 100. Further, as Figure 7 As shown, the boosting device 140 includes: a boosting pump 143 and a fifth valve group; the boosting pump 143 is suitable for applying pressure to convert low-pressure liquid into high-pressure fluid so that it can enter the cross-flow steam boiler 100 more smoothly, and the fifth valve group is suitable for controlling the on-off of the boiler feed water pipe 130. Further, the fifth valve group includes: a gate valve 141, a Y-type filter 142, a check valve 144 and a stop valve 146 arranged in sequence along the flow direction of water in the boiler feed water pipe 130; the boosting pump 143 is located between the Y-type filter 142 and the check valve 144. Under normal working conditions, the gate valve 141, the check valve 144 and the stop valve 146 are all kept in a normally open state.
[0079] In one possible implementation, the boiler feed water pipe 130 is provided with a boiler feed water branch, both ends of the boiler feed water branch are connected to the boiler feed water pipe 130, and the two ends of the boiler feed water branch are respectively located at the two ends of the booster device 140 of the boiler feed water pipe 130. A booster device 140 is also provided on the boiler feed water branch, and a safety valve 148 is provided at the water outlet of the boiler feed water branch.
[0080] In a possible implementation, the boiler feed water pipe 130 and the boiler feed water branch are both provided with a pressure sensor 147 ; and the pressure sensor 147 is disposed between the stop valve 146 and the check valve 144 .
[0081] Further, such as Figure 7 As shown, the boiler water supply pipe 130 is provided with a gate valve 132 and an electric valve 131; the gate valve 132 is arranged at one end of the boiler water supply pipe 130 connected to the condensate recovery tank 200, and in normal working state, the gate valve 132 is kept in a normally open state. The electric valve 131 is arranged at the water outlet end of the booster device 140.
[0082] In summary, if Figure 3As shown, the condensate recovery tank 200 is provided with a first water inlet 201, which is suitable for receiving the condensate from the condensate pipe 600; the condensate recovery tank 200 is provided with a second water inlet 202, which is suitable for receiving the water from the water heating module; the condensate recovery tank 200 is provided with a water outlet 203, which is connected to the boiler feed water pipe 130 and is suitable for supplying water to the cross-flow steam boiler 100; the condensate recovery tank 200 is provided with an overflow port 204, which is connected to the water heating module and is suitable for the condensate in the condensate recovery tank 200. When the amount of water is large, it flows back to the water heating module from the overflow port 204; the condensate recovery tank 200 is provided with a flash steam discharge port 205, which is suitable for releasing the flash steam in the condensate recovery tank 200 to the water heating module; the condensate recovery tank 200 is provided with a first discharge port 206 and a second discharge port 207, which are suitable for relieving pressure through the first discharge port 206 and draining water through the second discharge port 207 when the pressure in the condensate recovery tank 200 is too high or the water volume is full, so as to avoid damage to the condensate recovery tank 200 caused by excessive internal pressure. Furthermore, the first water inlet 201, the flash steam discharge port 205 and the first discharge port 206 are all opened on the top surface of the condensate recovery tank 200 to facilitate the discharge of gas, the second discharge port 207 is opened on the bottom surface of the condensate recovery tank 200 to facilitate the discharge of water, the second water inlet 202, the overflow port 204 and the water outlet 203 are all opened on the side wall of the condensate recovery tank 200, and the overflow port 204 is located at the upper end, and the water outlet 203 is located at the lower end, which is conducive to the water flowing into the boiler feed water pipe 130 under its own pressure.
[0083] Furthermore, the condensed water recovery tank 200 is also provided with a vacuum breaking pipe 251 and a vacuum breaker 250, the vacuum breaking pipe 251 is connected to the inside of the cavity of the condensed water recovery tank 200, and the vacuum breaker 250 is arranged on the vacuum breaking pipe 251, and is suitable for restoring the inside of the condensed water recovery tank 200 to atmospheric pressure when negative pressure is formed in the condensed water recovery tank 200. Furthermore, a valve 252 is provided on the vacuum breaking pipe 251, which is suitable for controlling the on and off of the vacuum breaking pipe 251.
[0084] Furthermore, the first discharge port 206 of the condensate recovery tank 200 is provided with a first discharge pipe 261 on which a safety valve 260 is provided; the second discharge port 207 of the condensate recovery tank 200 is provided with a second discharge pipe on which a valve 208 is provided.
[0085] In a possible implementation, a first liquid level gauge 280 is provided in the condensed water recovery tank 200, which is suitable for detecting the liquid level height in the condensed water recovery tank 200. The highest liquid level detection point of the first liquid level gauge 280 is flush with the height of the overflow port 204 of the condensed water recovery tank 200. The first liquid level gauge 280 and the electric valve 223 of the first overflow pipe 210 are controlled by the controller 150. When the water level exceeds the highest liquid level detection point of the first liquid level gauge 280, the electric valve 233 is opened, and the water in the condensed water recovery tank 200 flows into the hot water tank 500. The first liquid level gauge 280 and the heating pump 540 are controlled by the controller 150. When the water level is lower than the lowest liquid level detection point of the first liquid level gauge 280, the heating pump 540 is turned on, and the water in the hot water tank 500 is injected into the condensed water recovery tank 200 until the water level reaches the highest liquid level detection point of the first liquid level gauge 280 and the water injection is stopped. Furthermore, the ratio of the height of the highest liquid level detection point of the first liquid level gauge 280 to the lowest point of the bottom of the condensate recovery tank 200 to the overall height of the condensate recovery tank 200 is in the range of 50%-80%; the ratio of the height of the lowest liquid level detection point of the first liquid level gauge 280 to the lowest point of the bottom of the condensate recovery tank 200 to the overall height of the condensate recovery tank 200 is in the range of 20%-30%.
[0086] In a possible implementation, the main body of the hot water tank 500 is a rectangular parallelepiped structure, and a second liquid level gauge 550 is provided in the hot water tank 500, which is suitable for detecting the liquid level height in the hot water tank 500. The second liquid level gauge 550 and the first heating pump 444 of the first heating device 440 are controlled in linkage through the controller 150, and are suitable for determining whether it is necessary to inject water into the hot water tank 500 according to the water level measured by the second liquid level gauge 550. When the water level in the hot water tank 500 is lower than the lowest liquid level detection point of the second liquid level gauge 550, the first heating pump 444 is turned on to continuously inject water into the hot water tank 500; when the water level exceeds the highest liquid level detection point of the second liquid level gauge 550, the first heating pump 444 is turned off to stop injecting water into the hot water tank 500. Furthermore, the ratio of the height of the highest liquid level detection point of the second liquid level gauge 550 from the bottom of the hot water tank 500 to the overall height of the hot water tank 500 is in the range of 80%-90%; the ratio of the height of the lowest liquid level detection point of the second liquid level gauge 550 from the bottom of the hot water tank 500 to the overall height of the hot water tank 500 is in the range of 30%-50%.
[0087] In a possible implementation, the main body of the soft water tank 400 is a rectangular parallelepiped structure, and a third liquid level gauge 450 is provided in the soft water tank 400, which is suitable for detecting the liquid level height in the soft water tank 400. The third liquid level gauge 450 and the electric valve 820 of the softening water pipe 800 are controlled in linkage through the controller 150, and are suitable for when the water level in the soft water tank 400 is lower than the lowest liquid level detection point of the third liquid level gauge 450, the electric valve 820 is opened, and water is continuously injected into the soft water tank 400; when the water level in the soft water tank 400 is higher than the highest liquid level detection point of the third liquid level gauge 450, the electric valve 820 is closed, and water injection into the soft water tank 400 is stopped. Furthermore, the ratio of the height of the highest liquid level detection point of the third liquid level gauge 450 from the bottom of the soft water tank 400 to the overall height of the soft water tank 400 is in the range of 80%-90%; the ratio of the height of the lowest liquid level detection point of the third liquid level gauge 450 from the bottom of the soft water tank 400 to the overall height of the soft water tank 400 is in the range of 30%-50%.
[0088] Furthermore, the first liquid level gauge 280, the second liquid level gauge 550 and the third liquid level gauge 450 are all magnetic flap level gauges.
[0089] The cross-flow steam boiler 100 is an intermittent water supply, and the cross-flow steam boiler 100 needs to keep the water volume within a preset liquid level range. When the liquid level in the cross-flow steam boiler 100 drops to a low liquid level, the booster pump 143 is turned on, and water is continuously injected into the cross-flow steam boiler 100 through the boiler water supply pipe 130; when the cross-flow steam boiler 100 rises to a high liquid level, the booster pump 143 is turned off, and the boiler water supply pipe 130 stops injecting water into the cross-flow steam boiler 100. Based on this, the working process of the first embodiment of the present application is described in detail:
[0090] First, the condensed water is introduced into the condensed water pipe 600, and the condensed water flows through the filter 610 for filtering, and the water quality parameters of the condensed water are detected by the water quality detector 620, and then the controller 150 determines whether the condensed water enters the condensed water recovery tank 200 according to the water quality parameters detected by the water quality detector 620;
[0091] It should be noted that if the water quality parameters of the condensed water detected by the water quality detector 620 meet the water use standard of the cross-flow steam boiler 100, the controller 150 controls the electric valve 603 on the connecting pipe 601 to be closed and the electric valve 622 to be opened, and the condensed water can enter the condensed water recovery tank 200 from the condensed water pipe 600; if the water quality parameters of the condensed water detected by the water quality detector 620 do not meet the water use standard of the cross-flow steam boiler 100, the controller 150 controls the electric valve 622 to be closed and the electric valve 603 on the connecting pipe 601 to be opened, and the condensed water enters the hot water coil 121 of the water heating module from the sewage pipe 120;
[0092] At the same time, the softened water pipe 800 is connected to the softened water, and the hardness detector 810 of the softened water pipe 800 detects the hardness parameters of the softened water; in the initial state, there is no water in the soft water tank 400, and the third liquid level gauge 450 in the soft water tank 400 detects that the water level in the soft water tank 400 is lower than the minimum water level. At this time, the controller 150 controls the electric valve 820 on the softened water pipe 800 to open, and the softened water in the softened water pipe 800 enters the soft water tank 400;
[0093] At the same time, in the initial state, there is no water in the hot water tank 500, and the third liquid level gauge 450 in the soft water tank detects that the water level in the hot water tank 500 is lower than the minimum water level. At this time, the controller 150 controls the first heating pump 444 to turn on, and the softened water in the soft water tank 400 enters the first heating tube 410 under the action of the first heating pump 444 and is heated for the first time when flowing through the first heating pump 444, and then flows into the flue gas waste heat recovery device 110 for the second heating, and finally flows from the flue gas waste heat recovery device 110 into the hot water tank 500.
[0094] Secondly, after the condensed water enters the condensed water recovery tank 200, the temperature sensor 290 of the condensed water recovery tank 200 detects the temperature of the water in the condensed water recovery tank 200, and then the controller 150 determines whether the water in the condensed water recovery tank 200 needs to be heated according to the water temperature data detected by the temperature sensor 290;
[0095] It should be noted that if the water temperature detected by the temperature sensor 290 does not reach the water temperature standard of the cross-flow steam boiler 100, the controller 150 controls the electric valve 713 to open, and the saturated steam can enter the condensate recovery tank 200 from the steam pipe 700 to heat the water in the condensate recovery tank 200. If the water temperature detected by the temperature sensor 290 reaches the water temperature standard of the cross-flow steam boiler 100, the controller 150 controls the electric valve 713 to close, and the saturated steam in the steam pipe 700 does not need to enter the condensate recovery tank 200.
[0096] Then, in the initial state, the liquid level in the cross-flow steam boiler 100 is lower than the minimum liquid level and needs to be supplied with water. The controller 150 of the cross-flow steam boiler 100 controls the boost pump 143 to operate and the electric valve 131 to open, and the water in the condensate recovery tank 200 enters the cross-flow steam boiler 100 through the boiler feed water pipe 130.
[0097] At the same time, the first liquid level gauge 280 of the condensed water recovery tank 200 detects the real-time water level parameters in the condensed water recovery tank 200 in real time, and then the controller 150 determines whether the water in the hot water tank 500 needs to be injected into the condensed water recovery tank 200, and whether the water in the condensed water recovery tank 200 needs to be introduced into the first overflow pipe 210 according to the water level height data detected by the first liquid level gauge 280;
[0098] It should be noted that if the real-time water level in the condensed water recovery tank 200 detected by the first liquid level gauge 280 does not reach the minimum water level, the controller 150 controls the second heating pump 544 of the second heating device 540 to be turned on, and the controller 150 controls the electric valve 233 of the first overflow pipe 210 to be closed, and the water in the hot water tank 500 enters the second heating pipe 510 under the action of the second heating pump 544 and is reheated when flowing through the second heating pump 544 and then flows into the condensed water recovery tank 200; the water in the hot water tank 500 is heated again when flowing through the second heating pump 544, and then flows into the condensed water recovery tank 200; the water in the hot water tank 500 is heated again when flowing through the second heating pump 54 ... If the real-time water level height in the condensate recovery tank 200 detected by the first liquid level gauge 280 reaches the maximum water level height, the controller 150 controls the second heating pump 544 of the second heating device 540 to turn off and stop injecting water into the condensate recovery tank 200; if the real-time water level height in the condensate recovery tank 200 detected by the first liquid level gauge 280 exceeds the maximum water level height, the controller 150 controls the electric valve 233 of the first overflow pipe 210 to open, and the water in the condensate recovery tank 200 flows back to the hot water tank 500 through the first overflow pipe 210.
[0099] At the same time, the second pressure sensor 270 of the condensate recovery tank 200 detects the gas pressure in the condensate recovery tank 200 in real time, and then the controller 150 determines whether it is necessary to introduce the flash steam in the condensate recovery tank 200 into the flash steam discharge pipe 220 according to the pressure data detected by the second pressure sensor 270;
[0100] It should be noted that if the real-time pressure in the condensate recovery tank 200 detected by the second pressure sensor 270 is within the standard pressure range (0.35-0.40 MPa), the controller 150 controls the electric valve 243 of the flash steam discharge pipe 220 to be closed; if the real-time pressure in the condensate recovery tank 200 detected by the second pressure sensor 270 exceeds the standard pressure range (0.35-0.40 MPa), the controller 150 controls the electric valve 243 of the flash steam discharge pipe 220 to be opened, and the flash steam in the condensate recovery tank 200 flows into the hot water tank 500 through the flash steam discharge pipe 220;
[0101] At the same time, the second liquid level gauge 550 in the hot water tank 500 detects the water level parameters in the hot water tank 500 in real time, and then the controller 150 determines whether it is necessary to inject softened water into the hot water tank 500 according to the water level height data detected by the second liquid level gauge 550. It should be noted that if the real-time liquid level height in the hot water tank 500 detected by the second liquid level gauge 550 is lower than the maximum water level height, the controller 150 controls the first heating pump 444 to operate, and the water in the soft water tank 400 is injected into the hot water tank 500; if the real-time liquid level height in the hot water tank 500 detected by the second liquid level gauge 550 exceeds the maximum water level height, the controller 150 controls the first heating pump 444 to stop operating, and the water in the soft water tank 400 stops injecting into the hot water tank 500;
[0102] At the same time, the third liquid level gauge 450 in the soft water tank 400 detects the water level parameters in the soft water tank 400 in real time, and then the controller 150 determines whether it is necessary to continue to inject softened water into the soft water tank 400 according to the water level height data detected by the third liquid level gauge 450. It should be noted that if the real-time liquid level height in the soft water tank 400 detected by the third liquid level gauge 450 is lower than the minimum water level height, the controller 150 controls the electric valve 820 of the softening water pipe 800 to open, and softened water is injected into the soft water tank 400; if the real-time liquid level height in the soft water tank 400 detected by the third liquid level gauge 450 exceeds the maximum water level height, the controller 150 controls the electric valve 820 of the softening water pipe 800 to close, and the softened water stops being injected into the soft water tank 400.
[0103] Afterwards, when the water level in the cross-flow steam boiler 100 reaches the preset maximum water level, the cross-flow steam boiler 100 does not need to continue to be supplied with water, and the controller 150 of the cross-flow steam boiler 100 simultaneously controls the boost pump 143, the first heating pump 444, and the second heating pump 544 to stop running and the electric valve 131 to close; when the water level in the cross-flow steam boiler 100 drops to the preset minimum water level, water is re-injected into the cross-flow steam boiler 100 to form a water supply cycle.
[0104] Finally, the cross-flow steam boiler 100 generates saturated steam when working, a part of which is transported from the steam pipe 700 to the condensate recovery tank 200 for water heating, and the other part is transported to the production process heat exchanger for heat exchange, and then condensate is generated and transported back to the condensate recovery tank 200 from the condensate pipe 600.
[0105] It should be noted that the controller 150 of the present application adopts a PLC control system.
[0106] Second embodiment:
[0107] In the second embodiment of the present application, the water heating module is a common water tank 900; that is, the hot water tank 500 and the soft water tank 400 of the first embodiment are integrated into a common water tank 900. Such a design can make the volume of the overall device smaller and effectively reduce the equipment footprint. Figure 7 As shown, the public water tank 900 is provided with a first water inlet, a second water inlet, a third water inlet and a water outlet; the softening water pipe 800 is connected to the first water inlet of the public water tank 900, and is suitable for injecting softened water into the public water tank 900; the first overflow pipe 210 of the condensate recovery tank 200 and the flash steam discharge pipe 220 of the condensate recovery tank 200 are both connected to the second water inlet, and are suitable for when the water level in the condensate recovery tank 200 exceeds the maximum water level, the water in the condensate recovery tank 200 enters the public water tank 900 through the first overflow pipe 210, and is suitable for when the gas pressure in the condensate recovery tank 200 exceeds the standard , the flash steam in the condensate recovery tank 200 enters the public water tank 900 through the flash steam discharge pipe 220; the water outlet of the public water tank 900 is connected to the flue gas waste heat recovery device 110 through the first heating pipe 410, and is connected to the second water inlet 202 of the condensate recovery tank 200 through the second heating pipe 510, and the third water inlet of the public water tank 900 is connected to the return pipe 420, so that the water in the public water tank 900 enters the first heating pipe 410, flows through the first heating pump 444 and the flue gas waste heat recovery device 110 in sequence, and then enters the return pipe 420, and returns to the public water tank 900 from the return pipe 420. The hot water coil 121 is arranged in the public water tank 900, and the sewage pipe 120 is connected to the hot water coil 121 in the public water tank 900.
[0108] A fourth liquid level gauge 910 is provided in the public water tank 900; the fourth liquid level gauge 910 is suitable for detecting the water level in the public water tank 900; the ratio of the height of the highest water level detection point of the fourth liquid level gauge 910 from the bottom of the public water tank 900 to the overall height of the public water tank 900 is 80%; the ratio of the height of the lowest water level detection point of the fourth liquid level gauge 910 from the bottom of the public water tank 900 to the overall height of the public water tank 900 is 50%; the ratio of the height of the ultra-low water level detection point of the fourth liquid level gauge 910 from the bottom of the public water tank 900 to the overall height of the public water tank 900 is 30%. When the water level in the public water tank 900 is lower than the lowest water level detection point of the fourth liquid level gauge 910, the controller 150 controls the electric valve 820 to open and starts to inject softened water into the public water tank 900; when the water level in the public water tank 900 is higher than the highest water level detection point of the fourth liquid level gauge 910, the controller 150 controls the electric valve 820 to close and stops injecting water into the public water tank 900; when the water level in the public water tank 900 is lower than the ultra-low water level detection point of the fourth liquid level gauge 910, the controller 150 controls the second heating pump 544 to stop running, and the public water tank 900 cannot inject water into the condensate recovery tank 100.
[0109] It should be noted that according to Figure 1 and Figure 7 , the second embodiment of the present application is different from the first embodiment in the following ways: 1. In Embodiment 2, the public water tank 900 is directly connected to the first heating pipe 410, the second heating pipe 510, and the return pipe 420, and the water in the public water tank 900 is heated by the flue gas waste heat recovery device 110 and then flows back to the public water tank 900; while in Embodiment 1, the soft water tank 400 is separately connected to the first heating pipe 410, the hot water tank 500 is separately connected to the second heating pipe 510, and the return pipe 420 is separately connected to the hot water tank 500, so that the water in the soft water tank 400 enters the flue gas waste heat recovery device 110 for heating and then enters the hot water tank 500; 2. In Embodiment 2, the softening water pipe 800 is directly connected to the public water tank 900, while in Embodiment 1, the softening water pipe 800 is connected to the soft water tank 400, and the soft water tank 400 and the hot water tank 500 are connected via the third overflow pipe 460. Except for the above differences, the remaining structures and connection relationships of the two embodiments are the same. Users can choose any implementation method according to different usage requirements.
[0110] The embodiments of the present application have been described above, and the above description is exemplary, not exhaustive, and is not limited to the disclosed embodiments. Many modifications and changes will be apparent to those of ordinary skill in the art without departing from the scope and spirit of the described embodiments. The selection of terms used herein is intended to best explain the principles of the embodiments, practical applications, or improvements to the technology in the market, or to enable other persons of ordinary skill in the art to understand the embodiments disclosed herein.
Claims
1. A condensate recovery water supply device for a through-flow steam boiler, characterized in that: include: Condensate recovery tank, water heating module, softening water pipe, steam pipe, condensate pipe, sewage pipe and boiler feed water pipe; The condensate recovery tank is provided with a first water inlet, a second water inlet, and a water outlet; One end of the condensate water pipe is suitable for receiving condensate water, and the other end of the condensate water pipe is connected to the first water inlet of the condensate water recovery tank; the water outlet of the condensate water recovery tank is connected to the boiler feed water pipe; One end of the steam pipe is suitable for receiving saturated steam, and the other end of the steam pipe is inserted into the cavity of the condensate recovery tank, and is suitable for delivering saturated steam into the condensate recovery tank; The softened water pipe is connected to one of the water inlets of the water heating module, and is suitable for introducing softened water into the water heating module; the water outlet of the water heating module is connected to the water inlet of the flue gas waste heat recovery device of the cross-flow steam boiler, the water outlet of the flue gas waste heat recovery device is connected to the other water inlet of the water heating module, and the water outlet of the water heating module is connected to the second water inlet of the condensed water recovery tank; The water heating module is provided with a hot water coil, the sewage outlet of the cross-flow steam boiler and the condensed water pipe are both connected to the sewage pipe, and the sewage pipe is connected to the hot water coil.
2. The condensate recovery water supply device for a through-flow steam boiler according to claim 1, characterized in that: A water quality detector is provided at the water inlet end of the condensate water pipe, and the water quality detector is suitable for detecting the water quality of the condensate water. When the water quality of the condensate water is detected to be qualified, the condensate water pipe is connected with the condensate water recovery tank to allow the condensate water to enter the condensate water recovery tank; when the water quality of the condensate water is detected to be unqualified, the condensate water pipe is connected with the sewage pipe to allow the condensate water to enter the sewage pipe.
3. The condensate recovery water supply device for a through-flow steam boiler according to claim 1, characterized in that: An ejector is arranged at one end of the steam pipe which extends into the condensate recovery tank.
4. The condensate recovery water supply device for a through-flow steam boiler according to claim 1, characterized in that: The water heating module includes: a soft water tank and a hot water tank; The soft water tank is provided with a first water inlet and a water outlet, the softened water pipe is connected to the first water inlet of the soft water tank, the water outlet of the soft water tank is connected to the water inlet of the flue gas waste heat recovery device, the water outlet of the flue gas waste heat recovery device is connected to the water inlet of the hot water tank; the water outlet of the hot water tank is connected to the second water inlet of the condensed water recovery tank; The hot water coil is arranged inside the cavity of the hot water tank.
5. The condensate recovery and water supply device for a through-flow steam boiler according to claim 4, characterized in that: The hot water tank is provided with an overflow port, and the soft water tank is provided with a second water inlet; The overflow port of the hot water tank is connected to the second water inlet of the soft water tank.
6. The condensate recovery water supply device for a through-flow steam boiler according to claim 4, characterized in that: The water outlet of the soft water tank is connected to the water inlet of the flue gas waste heat recovery device through a first heating pipe, and a first heating device is provided on the first heating pipe.
7. The condensate recovery and water supply device for a through-flow steam boiler according to claim 4, characterized in that: The water outlet of the hot water tank is connected to the second water inlet of the condensed water recovery tank through a second heating pipe, and a second heating device is provided on the second heating pipe.
8. The condensate recovery and water supply device for a cross-flow steam boiler according to claim 5, characterized in that: The condensed water recovery tank is provided with an overflow port, and the overflow port of the condensed water recovery tank is connected to the interior of the cavity of the hot water tank through an overflow pipe.
9. The condensate recovery and water supply device for a through-flow steam boiler according to claim 4, characterized in that: The condensate recovery tank is provided with a flash steam discharge port, and the flash steam discharge port is connected to the interior of the cavity of the hot water tank through a flash steam discharge pipe.
10. The condensate recovery and water supply device for a cross-flow steam boiler according to claim 1, characterized in that: The boiler water feed pipe is provided with a pressure boosting device, which is suitable for sending the water in the boiler water feed pipe into the cross-flow steam boiler.