Underground roadway tunneling structure suitable for filling mining method

By setting up the structure of the cushion area, bottom rib mesh, partition and hanging rib in the underground tunnel excavation, the problem of blasting damage to the integrity of the filling body in the filling mining method is solved, and the stability and safety of the filling body is improved, so as to avoid The risk of false roof collapse of the alleyway.

CN222084508UActive Publication Date: 2024-11-29JINCHUAN GROUP NICKEL COBALT CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202420852790.5
Authority / Receiving Office
CN · China
Patent Type
Utility models(China)
Current Assignee / Owner
Filing Date
2024-04-23
Publication Date
2024-11-29
Estimated Expiration
2034-04-23

AI Technical Summary

Technical Problem

In the underground tunnel excavation of metal mines using the filling mining method, blasting operation destroys the integrity of the filling body, increases the risk of false top collapse of the tunnel, and the filling body is insufficient in thickness and poor in stability, which poses safety hazards.

Method used

A structure including upper layered filling tunnel and lower layered tunnel was designed, and a cushion area, bottom rib mesh, partition and hanging rib were set up. Through cushioning and filling, the filling body was ensured to be separated after reaching the designed strength. Avoid blasting damage to the filling body, and use spacers and hanging ribs to enhance the stability of the filling body.

Benefits of technology

It effectively avoids the damage to the filling body by blasting, reduces the phenomenon of separating and delamination of the filling body, enhances the strength and stability of the filling body, reduces safety hazards, and ensures the stability of the tunnel.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN222084508U_ABST
    Figure CN222084508U_ABST
Patent Text Reader

Abstract

The utility model discloses an underground roadway tunneling structure suitable for a filling mining method, and relates to the technical field of mining structures. The structure comprises an upper layered filling roadway and a lower layered tunneling roadway, a pad ore area is arranged at the overlapped part of the upper layered filling roadway and the lower layered tunneling roadway, a wall body is arranged at the right end of the pad ore area, and the top of the wall body is attached to the top of the upper layered filling roadway. An explosive filling body is arranged in the pad ore area. According to site conditions, ore padding is conducted on an ore padding area between an upper layered filling roadway and a lower layered tunneling roadway, then the upper layered filling roadway is filled, the ore padding area is separated out after filling slurry reaches the design strength, and finally normal circulating tunneling is conducted on other sections of the lower layered roadway, so that blasting after filling is avoided, and the working efficiency is improved. The integrity of the filling body is damaged to a certain degree, so that the artificial roof is damaged, the filling body is insufficient in thickness and poor in stability, and potential safety hazards exist.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The utility model relates to the technical field of mining structures, in particular to an underground tunnel excavation structure suitable for a filling mining method. Background Art

[0002] Backfill mining is one of the methods used in underground ore mining. Specifically, it refers to the use of a certain proportion of backfill mortar to fill the goaf after mining, so as to provide an artificial false roof for the mining of the lower layer and play a protective role. In the excavation of underground tunnels in metal mines using backfill mining, blasting of the filled area is often involved, which destroys the integrity of the backfill body and increases the risk of the false roof of the tunnel collapsing. Utility Model Content

[0003] In response to the above technical problems, the utility model provides an underground tunnel excavation structure suitable for the backfill mining method, which is used to solve the problem that the excavation of underground tunnels in metal mines using the backfill mining method often involves blasting of the filled area, which destroys the integrity of the filling body and increases the risk of false roof collapse in the tunnel.

[0004] In order to achieve the above purpose, the technical solution of the utility model is as follows:

[0005] An underground tunnel excavation structure suitable for backfill mining method comprises an upper layer backfill tunnel and a lower layer excavation tunnel, wherein a ore cushioning area is arranged in the overlapping part between the upper layer backfill tunnel and the lower layer excavation tunnel, a wall is built at the right end of the ore cushioning area, the top of the wall is in contact with the top of the upper layer backfill tunnel, and an explosive backfilling body is arranged in the ore cushioning area.

[0006] Furthermore, a bottom reinforcement mesh is provided at the bottom of the upper layered filling tunnel.

[0007] Furthermore, a partition cloth is provided between the bottom reinforcement mesh and the ore padding area.

[0008] Furthermore, a lifting ring is provided at the top of the upper layered filling tunnel, and the lifting ring is connected with a lifting rod, and the lifting rod passes through the filling area of ​​the upper layered filling tunnel and is connected with the bottom reinforcement net.

[0009] Compared with the prior art, the utility model has the following beneficial effects: the utility model has a simple structure and a clear layout. According to the on-site conditions, a padding area is set for the overlapping part between the upper layer filling tunnel and the lower layer excavation tunnel to perform padding, and then the upper layer filling tunnel is filled. After the filling slurry reaches the designed strength, the padding area is separated, and finally the normal cycle excavation of the remaining section of the lower layer tunnel is performed. The part of the filling area that may be involved in blasting is effectively layered to avoid the filling of the upper layer filling tunnel when the lower layer excavation tunnel is blasted. The integrity of the filling body is damaged to a certain extent, resulting in the destruction of the artificial false roof, insufficient thickness of the filling body, poor stability, and potential safety hazards; the bottom reinforcement mesh can avoid the segregation and delamination of the filling body after the upper layer filling tunnel is filled; the partition cloth is used to isolate the filling body and the cushioning area. When the filling body reaches the designed strength, it is convenient to separate the cushioning area and reduce the impact on the overall stability of the filling body; the hanger increases the strength of the filling body and also imposes certain constraints and limits on the bottom reinforcement mesh to avoid detachment of the bottom reinforcement mesh during excavation in the lower layer excavation tunnel. BRIEF DESCRIPTION OF THE DRAWINGS

[0010] Figure 1 It is a structural schematic diagram of the utility model.

[0011] Description of reference numerals:

[0012] 1. Upper layer filling tunnel; 2. Lifting ring; 3. Lifting rod; 4. Filling area; 5. Partition cloth; 6. Bottom reinforcement net; 7. Mining pad area; 8. Wall; 9. Round wood; 10. Locking anchor rod; 11. Lower layer excavation tunnel; 12. Lower layer bottom plate; 14. Peripheral tunnel. DETAILED DESCRIPTION

[0013] In order to make the purpose, technical solution and advantages of the utility model clearer, the utility model is further described in detail below in combination with specific implementation methods and with reference to the accompanying drawings. It should be understood that these descriptions are only exemplary and are not intended to limit the scope of the utility model. In addition, in the following description, the description of well-known structures and technologies is omitted to avoid unnecessary confusion of the concept of the utility model.

[0014] An underground tunnel excavation structure suitable for backfill mining method includes an upper layer backfill tunnel 1 and a lower layer excavation tunnel 11. A padding area 7 is set in the overlapped part between the upper layer backfill tunnel 1 and the lower layer excavation tunnel 11. A wall 8 is built on the right end of the padding area 7. The top of the wall 8 is in contact with the top of the upper layer backfill tunnel 1. An explosive backfill body is set in the padding area 7. According to the on-site conditions, the padding area 7 between the upper layer backfill tunnel 1 and the lower layer excavation tunnel 11 is padded with ore, and then the upper layer backfill tunnel 1 is filled. After the filling slurry reaches the designed strength, the padding area 7 is separated. Finally, the normal cycle excavation of the remaining section of the lower layer tunnel is carried out. Loose ore is used for padding, so that the new excavation area and the filling area 4 are effectively layered, and explosion after filling is avoided, which damages the integrity of the filling body to a certain extent, resulting in the destruction of the artificial false roof, insufficient thickness of the filling body, poor stability, and potential safety hazards.

[0015] The bottom of the upper layered filling tunnel 1 is provided with a bottom reinforcement net 6. The bottom reinforcement net 6 can prevent the segregation and delamination of the filling body after the upper layered filling tunnel 1 is filled.

[0016] A partition 5 is provided between the bottom reinforcement net 6 and the ore padding area 7. The partition 5 is used to isolate the filling body and the ore padding area 7. When the filling body reaches the designed strength, it is convenient to separate the ore padding area 7 and reduce the impact on the overall stability of the filling body.

[0017] A lifting ring 2 is provided at the top of the upper layered filling tunnel 1, and the lifting ring 2 is connected to a lifting rod 3, and the lifting rod 3 passes through the filling area 4 of the upper layered filling tunnel 1 and is connected to the bottom reinforcement net 6. The lifting rod 3 increases the strength of the filling body and also restricts and limits the bottom reinforcement net 6 to a certain extent, so as to prevent the bottom reinforcement net 6 from being separated when the lower layered excavation tunnel 11 is excavated.

[0018] The wall 8 is built with fly ash bricks.

[0019] Embodiment 1,

[0020] First, a wall 8 is built on the right end of the cushioning area 7. Logs 9 and locking anchor rods 10 are arranged in the wall 8 to strengthen the stability of the filling plate wall. The filling slurry and the loose ore filled in the cushioning area 7 are limited to prevent spreading to the outer tunnel 14. Then, according to the formal construction drawing, the cushioning of the upper layer filling tunnel 1 and the lower layer excavation tunnel 11 is carried out in the overlapping area. Secondly, the upper layer filling tunnel 1 is prepared for filling, the upper layer filling tunnel 1 is filled, and the cushioning area 7 is separated after the filling slurry reaches the design strength. Finally, the excavation work of the lower layer excavation tunnel 11 is carried out along the direction of the lower layer bottom plate 12.

[0021] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.

Claims

1. An underground tunnel excavation structure suitable for backfill mining method, characterized in that: The invention comprises an upper layer filling tunnel (1) and a lower layer excavation tunnel (11), wherein a cushioning area (7) is arranged in the overlapped part between the upper layer filling tunnel (1) and the lower layer excavation tunnel (11), a wall (8) is arranged at the right end of the cushioning area (7), the top of the wall (8) is in contact with the top of the upper layer filling tunnel (1), and an explosive filling body is arranged in the cushioning area (7).

2. An underground tunnel excavation structure suitable for backfill mining method according to claim 1, characterized in that: The bottom of the upper layered filling tunnel (1) is provided with a bottom reinforcement mesh (6).

3. The underground tunnel excavation structure suitable for backfill mining method according to claim 2, characterized in that: A partition cloth (5) is provided between the bottom reinforcement net (6) and the ore padding area (7).

4. The underground tunnel excavation structure suitable for backfill mining method according to claim 1, characterized in that: A lifting ring (2) is provided at the top of the upper layered filling tunnel (1), and the lifting ring (2) is connected to a lifting rod (3). The lifting rod (3) passes through the filling area (4) of the upper layered filling tunnel (1) and is connected to the bottom reinforcement net (6).