A technology for pipe structures and components, which is applied in the field of water dismantling and replacement of support pipe structures, can solve the problems of long occupancy docking period and inability to guarantee the replacement accuracy of support pipes, so as to reduce costs, reduce costs, and save labor and flexibility in replacement construction operations. The effect of structural deformation and even instability
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Publication Date
- 2012-07-04
Smart Images
Figure 1 Figure 2 Figure 3
Abstract
Description
technical field
[0001] The invention relates to a construction method in marine engineering, more specifically, it relates to a process method for dismantling and replacing a supporting pipe structure on water. Background technique
[0002] At present, there are 178 semi-submersible drilling platforms in the world. Most of these platforms were built in the 1980s. By 2010, the service life of 90% of the platforms will exceed 25 years. In order to extend the service life of the platforms, many ship owners Partial transformation and partial renewal are carried out on these platforms. Therefore, the number of renewals of offshore platforms is very large, and the market is very broad. Under the existing technical methods, on marine engineering products, especially the old structural transformation work of large multi-support tube semi-submersible platforms, the removal and replacement of large-scale support tubes is generally carried out in the dock, which requires the use of res...
Examples
Embodiment Construction
[0022] The method of the present invention mainly includes the general process regulations for removing and replacing the support pipe on the water surface, and its specific content is as follows:
[0023] 1. First remove and replace the support tubes that have less influence on the platform deformation, and finally remove and replace the support tubes that have a greater influence on the platform deformation;
[0024] 2. Before the original pipe is cut, in order to prevent the structural deformation of the support pipe, the temporary reinforcement support pipe must be installed in advance, and the new support pipe must be replaced and welded before the temporary reinforcement support pipe can be removed;
[0025] 3. The removal and installation of the switching support tubes on the water surface is carried out by hanging the pulley block as the main method and the chain hoist as the auxiliary method. The removal and the transportation of the new support tubes need to be carrie...