Transportation method for constructing high mountain building
A transportation method and technology for structures, applied in the directions of transportation, packaging, storage devices, etc., can solve the problems of difficult transportation of materials and construction equipment, and achieve the effects of novel design ideas, convenient use and improved efficiency.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0029] The construction and transportation method of alpine structures is realized by the following steps:
[0030] (1) Excavate the earthwork of the construction site on the mountain, select a relatively gentle slope around the construction site, and use the excavated earthwork on the construction site to naturally slip into a virtual soil base 1 on the above-mentioned relatively gentle slope, And manually level the virtual soil base on the slope and tamp it twice (due to the large slope, it is impossible to use tamping equipment for construction); figure 1 shown;
[0031] (2) Build C20 plain concrete buttresses 2 every 6m on the treated virtual soil base 1, and the C20 plain concrete buttresses 2 take root in the original soil layer of the mountain. The section of the C20 plain concrete buttresses is 2000×1000mm, (Slopes with the same inclination angle as the base layer) reserve steel plate embedded parts; Concrete support platforms 3 are respectively constructed at the bot...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com