An auxiliary management system and implementation method for subway comprehensive pipeline construction
An integrated pipeline and management system technology, applied in the field of engineering construction, can solve problems such as repetitive construction and unclear progress positioning of pipeline management projects, and achieve the effect of ensuring smooth progress, eliminating inconvenience and even rework, and avoiding rework
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0089] The following is an explanation of the auxiliary management and implementation organization method of subway comprehensive pipeline construction based on 3D visualization in combination with Xi'an Library Station.
[0090] Get the subway design drawings for Xi'an Library Station. Standardize the coordinates of all design drawings without changing the original design drawings. Import the concrete structure of the subway station into 3Ds Max by layer. In the case of maintaining the 1:1 unit between AutoCAD and 3Ds Max, the scene structure is three-dimensionalized. Simultaneously design and implement the 3D scene import class CLoad3DS.
[0091] Analyze the concerns of construction organization and maintenance personnel on the pipeline, extract and separate the physical and business attributes of the pipeline, and divide the pipeline information into two categories: basic attribute business information and spatial location information. Basic attribute business informatio...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 