Method and device for predicating demand of goods and materials for power distribution network construction
A technology for demand forecasting and power distribution network, applied in the field of forecasting
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0022] see figure 1 , is a schematic flowchart of Embodiment 1 of another method for forecasting demand for materials for power distribution network construction according to the present invention, including steps:
[0023] Step S101: Obtain the parameters of the preset attributes of the historical items and the material usage of various historical items, use the clustering algorithm to group the historical item material usage, determine the cluster group, and use the keyword frequency analysis method for the cluster group to determine the item Type attribute, which standardizes the material usage of various historical projects within the preset range;
[0024] Step S102: According to the parameters of the preset attributes of historical projects, the standardized material usage of various historical projects, the number of preset hidden nodes and the attribute of the project type, a predictive model is constructed using a preset algorithm, and weight parameters of hidden node...
Embodiment 2
[0058] see figure 2 , is a schematic flow diagram of Embodiment 2 of the method for forecasting demand for materials for power distribution network construction according to the present invention, including steps:
[0059] Step S201: Obtain the parameters of the preset attributes of the historical items and the material usage of various historical items, use the clustering algorithm to group the historical item material usage, determine the cluster group, and use the keyword frequency analysis method for the cluster group to determine the item Type attribute, which standardizes the material usage of various historical projects within the preset range;
[0060] Step S202: According to the parameters of the preset attributes of historical projects, the standardized material usage of various historical projects, the number of preset implicit nodes and the attribute of the project type, an incremental extreme learning machine is used to construct a prediction model, and the impli...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com