Embodiment Construction
[0072] see figure 1 , is a schematic diagram of the 500kV and 220kV hybrid grid of the present invention, figure 2 Then it is the topological diagram of the 500kV terminal station and the 220kV power grid of the embodiment.
[0073] The concrete steps of the preferred embodiment of the 500kV terminal substation risk assessment calculation method based on comprehensive cause analysis of the present invention are as follows:
[0074] Step 1: Collect risk basic data of 500kV terminal substation and its surrounding 500kV power grid and 220kV power grid in the past 5 years, mainly including the failure rate , average repair time for each failure, planned maintenance rate, and average planned maintenance time for each time; the average calculation is performed on the 5-year data, and the obtained data is used as the input data for risk assessment components. In order to improve the calculation effectiveness, two sets of national and regional data should be collected Two sets of c...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com