Flowing-speed-limiting device for coal mine high-pressure filling pipeline
A technology for filling pipelines and flow limiting devices, which is applied in the direction of fillings, safety devices, pipe components, etc., can solve the problems of reduced filling slurry resistance, standpipe damage, and potential safety hazards, achieving reduced wear, cost savings, and safety Guaranteed effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0017] After the length of the filling line was shortened to 400m, the flow velocity of the filling slurry reached 1.5m / s at this time; a restrictor 1 was installed on the horizontal pipe between the riser 5 and the valve 2, and the total length is 1980mm. The thickness of the grinding layer is 4mm, the inner diameter of the restrictor 6 is gradually reduced from 179mm to 95mm, and the inner diameter of the opening 9 is 179mm. The filling slurry initially sets after 240 min after entering the filling area. The height of the filler slurry 8 in the standpipe 5 remains constant after being kept at 180m, and the pipeline is stably transported within 30 days without closing shock and pipeline blockage.
Embodiment 2
[0019] After the length of the filling trunk line was shortened to 350m, the flow velocity of the filling slurry reached 1.6m / s at this time; a flow restrictor 1 was added to the horizontal pipe between the riser 5 and the valve 2, the total length is 2200mm, the flow restrictor The thickness of the hardfacing layer on the inner wall is 5mm, the length of the restrictor is 2000mm, the inner diameter of the restrictor is gradually reduced from 195mm to 100mm, the length of the opening is 200mm, and the inner diameter is 195mm. The filling slurry initially sets 240 minutes after entering the filling area. The height of the filler slurry 8 in the riser 5 remains constant after 200 m, and the pipeline is stably transported within 30 days without closing shock and pipeline blockage.
Embodiment 3
[0021] After the length of the filling trunk line was shortened to 250 m, the flow velocity of the filling slurry reached 1.8m / s at this time; a restrictor 1 was added to the horizontal pipe between the riser 5 and the valve 2, and the total length was 2750mm. The thickness of the wear-resistant layer is 7mm, the inner diameter of the restrictor 6 is gradually reduced from 195mm to 100mm, and the inner diameter of the opening 9 is 195mm. The filling slurry initially sets 240 minutes after entering the filling area. The height of the filler slurry 8 in the riser 5 remains constant after 200 m, and the pipeline is stably transported within 30 days without closing shock and pipeline blockage.
PUM
| Property | Measurement | Unit |
|---|---|---|
| Total length | aaaaa | aaaaa |
| Thickness | aaaaa | aaaaa |
| Length | aaaaa | aaaaa |