Land rectification method for coal mining subsidence areas in plain areas
A technology for coal mining subsidence areas and land leveling, which is applied in the fields of land preparation methods, applications, agricultural machinery and equipment, etc., and can solve the problems of no treatment measures, no analysis of the morphological characteristics of coal mining subsidence basins, and extensive treatment methods.
Patent Information
- Authority / Receiving Office
- CN · China
- Current Assignee / Owner
- Publication Date
- 2015-04-29
- Estimated Expiration
- Not applicable · inactive patent
Smart Images
Figure 1 Figure 2 Figure 3
Abstract
Description
technical field
[0001] The invention belongs to the technical field of coal mining subsidence area control, and in particular relates to a method for land improvement in a coal mining subsidence area in a plain area. Background technique
[0002] Coal is the most important energy source in our country, and 90% of the coal resources are mined through wells. Mining subsidence has caused a large amount of land damage. How to scientifically control subsidence and damaged land is an urgent requirement for the protection of cultivated land and environmental restoration of mining areas in my country. Due to the wide distribution of coal resources in my country, different natural conditions, large differences in resource endowments, and various forms of land damage, a unified governance model cannot be formed. It is necessary to develop suitable governance methods for specific damage conditions in different types of areas.
[0003] The ground surface movement basin is the range of ...
Examples
Embodiment Construction
[0063] Such as figure 1 A method of land consolidation in the coal mining subsidence area shown in the plain area is used for land consolidation in the surface mobile basin in the coal mining subsidence area. The process is as follows:
[0064] Step 1. Division of treatment sections: Divide the surface mobile basin to be rehabilitated into four treatment sections from outside to inside; the four treatment sections are respectively edge area, side slope area, and slope bottom from outside to inside area and a basin floor area, the basin floor area is located in the middle of the surface mobile basin.
[0065] Such as figure 2 As shown, on the main cross-section of the movement of the surface basin, the area from the boundary point K1 to the boundary point K2 of the surface movement basin is the edge area, and the area from the boundary point K2 to the boundary point K3 is the slope area, and the area between the boundary point K3 and the maximum subsidence point K4 is the sl...